Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ROMAN CATHOLIC CHURCH OF ST. CHARLE NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Nov 10, 2026 |
| B |
| 11 |
Antenna · MODIFICATION TO VERIZON SITE. RELOCATE 5 ANTENNAS, INSTALL 3 ANTENNAS, REPLACE 4 ANTENNAS, INSTALL 4 RRHS, RETROFIT CABINET IN EXISTING EQUIPMENT ROOM IN BASEMENT. No product keyword matched |
| 6 |
| Nov 10, 2026 |
| B | JILI PROPERTY MANAGEMENT NYC DOB building permits | 11 | Suspended Scaffold · INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. No product keyword matched | 1 | Nov 10, 2026 |
| B | EAST 181 GARDENS LLC NYC DOB building permits | 11 | General Construction · PROPOSING NEW 6 STORY MIXED USE BUILDING. No product keyword matched | 15 | Nov 10, 2026 |
| B | IMH REAL ESTATE CORP NYC DOB building permits | 11 | Plumbing · Propose plumbing fixtures through with related components, propose modification of existing sprinkler system as per plans. No Change to use, bulk or egress. No product keyword matched | 1 | Nov 10, 2026 |
| B | SWINERTON BUILDERS Austin issued construction permits, NYC DOB building permits | 11 | Building Permit · Tenant improvement of cafe seating and additional trellis structure on outdoor deck. No product keyword matched | 13 | Nov 10, 2026 |
| B | SOLUTION MECH CONTNG LLC NYC DOB building permits | 11 | Plumbing · PROPOSED INSTALLATION OF SANITARY, VENT, WATER, GAS PIPING FOR NEW ROOF TIP UNITS. AS WELL AS INSTALLATION OF NEW FIXTURES AND DUPLEX PUMP. No product keyword matched | 3 | Nov 10, 2026 |
| B | 99 PARK AVENUE ASSOCIATES LP NYC DOB building permits | 11 | Mechanical Systems · AT 8TH FLOOR SOUTH TENANT SPACE, REMOVAL OF EXHAUST GRILLES, DIFFUSERS AND ASSOCIATED DUCT WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 5 | Nov 10, 2026 |
| B | JCAL CONSTRUCTION LLC NYC DOB building permits | 11 | Foundation · INSTALL FOUNDATION AS PER PLANS FILED. No product keyword matched | 14 | Nov 10, 2026 |
| B | OZ CONTRACTING LLC NYC DOB building permits | 11 | General Construction · #209 - Proposed restoration of existing apartment due to minor water damage. Plumbing to be filed subsequently. No change to use egress or occupancy. No product keyword matched | 19 | Nov 10, 2026 |
| B | MERCURY BUILDING ASSO INC NYC DOB building permits | 11 | General Construction · INTERIOR AND EXTERIOR RENOVATION ON EXIST. RESIDENTIAL HOUSE, REPAIR/REPLACE/NEW PARTITION, DOOR, CEILING, FLOOR, STAIR, AWNING, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 81 | Nov 10, 2026 |
| B | PRINCE TOWER NYC DOB building permits | 11 | Structural · Herewith filing for temporary structural shoring at the subcellar level of this existing parking garage. No change to use, occupancy or egress. No product keyword matched | 1 | Nov 10, 2026 |
| B | RIGNEY REFRIGERATION, HEATING & AIR NYC DOB building permits | 11 | Plumbing · APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE DIRECT REPLACEMENT OF (2) TWO ROOF TOP UNITS AT AN EXISTING COMMERCIAL BUILDING AT THE ROOF. NO CHANGE UN USE, EGRESS, OR OCCUPANCY FILED UNDER THIS APPLICATION.NO NEW CERTIFICATE OF OCCUPANCY No product keyword matched | 3 | Nov 10, 2026 |
| B | COMPASS POINT LLC NYC DOB building permits | 11 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 10, 2026 |
| B | Gibbons Realty Corp NYC DOB building permits | 11 | General Construction · We wish to demolish non load bearing interior partitions as per plan & ceilings in the commercial area of the first floor and cellar. Installation of new partition work, new flooring new ceilings, as per plans. No work in any of the residential areas. No product keyword matched | 2 | Nov 10, 2026 |
| B | EVANGLICAL LUTHERAN CHURCH OF THE A NYC DOB building permits | 11 | General Construction · Facade repairs as per drawings. No change in use, egress or occupancy is involved under this application. No product keyword matched | 2 | Nov 10, 2026 |
| B | BSC RETAIL OWNER LLC NYC DOB building permits | 11 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Nov 10, 2026 |
| B | INTERSTATE RESTORATION LL NYC DOB building permits | 11 | General Construction · REMOVAL AND RESTORATION OF ALL NON-BEARING INTERIOR PARTITIONS, APPLIANCES, FLOOR AND CEILING MATERIALS, AND ELECTRICAL COMPONENTS IN FIRE-DAMAGED IN APARTMENT 10A. NO CHANGE TO USE, EGRESS, OCCUPANCY, ORFIRE PROTECTION No product keyword matched | 4 | Nov 10, 2026 |
| B | RESIDENTS GROUP NYC DOB building permits | 11 | Full Demolition · Full demolition to a two story building No product keyword matched | 4 | Nov 10, 2026 |
| B | Findlay House c/o Lemle & Wolff Co NYC DOB building permits | 11 | General Construction · Filing for General Construction minor renovation of apartments in the D & E Lines. Apts 3-14E, 3D-14D. Renovation of interior non-load bearing partitions and cabinetry. No change to use, egress, or occupancy under this application. No product keyword matched | 4 | Nov 10, 2026 |
| B | DAXS NYC DOB building permits | 11 | Mechanical Systems · Split system heat pumps as per plans No product keyword matched | 2 | Nov 10, 2026 |
| B | EDDY'S GENERAL CONSTRUCT NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF NEW SPLIT HVAC SYSTEMS ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 3 | Nov 10, 2026 |
| B | BSC SERVICES LLC NYC DOB building permits | 11 | Full Demolition · Full demolition of the existing building. No product keyword matched | 5 | Nov 10, 2026 |
| B | URBAN INTELLIGENCE, INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 14 | Nov 10, 2026 |
| B | Silly Snakes Associates LLC NYC DOB building permits | 11 | Support of Excavation · SOE APPLICATION FILED IN CONJUNCTION WITH B01225993-I1. No product keyword matched | 2 | Nov 10, 2026 |
| B | JJM SERVICES PLUMBING COR NYC DOB building permits | 11 | Plumbing · #3A- Relocate sink & dishwasher. Install new washer & non-vented electric dryer. #3B - Install new washer & non-vented electric dryer. No change to use, occupancy, or egress. No product keyword matched | 2 | Nov 10, 2026 |
| B | ST JOHN'S CHURCH NYC DOB building permits | 11 | Structural · Structural work in conjunction with Alt-CO No product keyword matched | 6 | Nov 10, 2026 |
| B | Apollo RE Credit, 10th floor NYC DOB building permits | 11 | Sign · ERECT ILLUMINATED LED DIGITAL ADVERTISING SIGN ON SIGN STRUCTURE No product keyword matched | 7 | Nov 10, 2026 |
| B | VAGGELAS CONSTRUCTION GR* NYC DOB building permits | 11 | Structural · Filing subsequent application for structural work, restaurant space, at cellar, first floor, and lower roof setback levels, as per plans submitted. No product keyword matched | 3 | Nov 10, 2026 |
| B | SSH NY CORP DBA ELITE GROUP NYC DOB building permits | 11 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 27 | Nov 10, 2026 |
| B | RMCH INC NYC DOB building permits | 11 | Foundation · FOUNDATION & SPECIFICATIONS FOR EXISTING (2) STORY BUILDING AND CELLAR No product keyword matched | 4 | Nov 10, 2026 |
| B | RRH NY INC. NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01355953-I1 No product keyword matched | 5 | Nov 10, 2026 |
| B | DELUXE CONSTRUCTION AND NYC DOB building permits | 11 | General Construction · Parapet Wall and window lintel replacement. No product keyword matched | 2 | Nov 10, 2026 |
| B | HUGH CHRYSLER ENGINEERING NYC DOB building permits | 11 | General Construction · LEGALIZE FIRST FLOOR ADITTION. NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Nov 10, 2026 |
| B | 386 Forest LLC NYC DOB building permits | 11 | Plumbing · Subsequent filing for proposed plumbing work associated with the building alterations. No product keyword matched | 2 | Nov 10, 2026 |
| B | HORSEPOWER ELECTRIC NYC DOB electrical permits, NYC DOB building permits | 11 | Basement Electric room :Change 600amps Apartments fuses panel to 600amps circuit breakers panel No product keyword matched | 5 | Nov 10, 2026 |
| B | NYCM MANAGEMENT INC NYC DOB building permits | 11 | Construction Fence · Temporary construction fence No product keyword matched | 9 | Nov 10, 2026 |
| B | QUEENS HATZOLO AID, INC NYC DOB building permits | 11 | Plumbing · PLUMBING PLANS HEREWITH BEING FILED IN CONJUNCTION WITH APPLICATION # Q00618202 No product keyword matched | 4 | Nov 10, 2026 |
| B | AESNYC NYC DOB building permits | 11 | General Construction · TEMPORARY SCENIC ELEMENT IN CONJUNCTION WITH TPA APPLICATION #M01480374-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Nov 10, 2026 |
| B | LAKESIDE ADHCC NYC DOB building permits | 11 | Standpipe · REMOVE HOSES FROM ALL STANDPIPE HOSE VALVES AND INSTALL HOSE CABINETS AS PER 905.3.1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 10, 2026 |
| B | FINE CRAFTSMAN GROUP LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022. No product keyword matched | 1 | Nov 10, 2026 |
| B | Akala construction inc NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 48 | Nov 10, 2026 |
| B | VISR MANAGMENT LLC NYC DOB building permits | 11 | General Construction · SELECT INTERIOR RENOVATIONS OF A SINGLE FAMILY DWELLING. NEW SECOND FLOOR OVER EXISTING FIRST FLOOR ON THE NORTH SIDE. NEW OPEN PORCH ON THE EAST SIDE. No product keyword matched | 3 | Nov 10, 2026 |
| B | 349 49th Street Tenants Corporation NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Nov 10, 2026 |
| B | 3333 88 STREET LLC NYC DOB building permits | 11 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01401587 No product keyword matched | 2 | Nov 10, 2026 |
| B | 521 BROADWAY GROUP LLC NYC DOB building permits | 11 | Earth Work · FOUNDATION WORK FOR ENLARGEMENT OF THE EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 4 | Nov 10, 2026 |
| B | 88-37 HONG LLC NYC DOB building permits | 11 | Full Demolition · FULL DEMOLITION OF DETACHED 2.5 STORY, 1 FAMILY, RESIDENTIAL BUILDING USING HAND TOOLS ONLY, AS PLAN-EXEMPT FILING. No product keyword matched | 2 | Nov 10, 2026 |
| B | ARBOL 172 NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 4 | Nov 10, 2026 |
| B | W.R. PLUMBING AND HEATING CORP NYC DOB building permits | 11 | Plumbing · INSTALL GAS PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING, PLUMBING, WORK AS PER PLAN, NO CHANGE ON EGRESS, USE, OR OCCUPANCY. No product keyword matched | 3 | Nov 10, 2026 |
| B | J. KANE CONTRACTING CORP NYC DOB building permits | 11 | Mechanical Systems · Installation of HVAC system for a one-family building. No change in use, egress, or occupancy. No product keyword matched | 3 | Nov 10, 2026 |