Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | JFZ CONSTRUCTION, INC NYC DOB building permits | 11 | Structural · Replace metal deck and reinforce existing wood joists with new plywood subfloor at part of 1st floor along with infilling openings at brick wall on 1st floor. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 23, 2026 |
| B |
| 11 |
Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched |
| 5 |
| Oct 23, 2026 |
| B | Salon Realty Corp. NYC DOB building permits | 11 | General Construction · #9030 -LIGHTING MODIFICATIONS. ALL AS PER PLAN NO CHANGE IN USE GRESS OR OCCUPANCY . No product keyword matched | 4 | Oct 23, 2026 |
| B | CONGREGATION K'HAL SHAAREI ZION NYC DOB building permits | 11 | Boiler Equipment · Filing Boiler work for 6 new boilers No product keyword matched | 2 | Oct 23, 2026 |
| B | MODERN INT HOME RENO CORP NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH ALT-CO APPLICATION Q01397973-I1 No product keyword matched | 4 | Oct 23, 2026 |
| B | K.J. REMODELING OF NY CO* NYC DOB building permits | 11 | Foundation · PROPOSED 1 STORY ADDITION WITH MEZZANINE TO ENLARGE EXISTING LOBBY. GENERAL CONSTRUCTION, STRUCTURAL REINFORCEMENTS AND FOUNDATION FOOTINGS PER PLANS FILED. No product keyword matched | 7 | Oct 23, 2026 |
| B | WINDHAM RESTORATION CORP NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 6 | Oct 23, 2026 |
| B | AGP ENTERPRISES INC NYC DOB building permits | 11 | Curb Cut · PROPOSED 10' CURC CUT FOR NEW DETACHED TWO FAMILY RESIDENCE. No product keyword matched | 1 | Oct 23, 2026 |
| B | INFINITY SOLAR SYSTEMS.LL NYC DOB building permits | 11 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY. No product keyword matched | 3 | Oct 23, 2026 |
| B | 310 WEST 99TH ST OWNERS CORP NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 23, 2026 |
| B | A.M.A HOLDINGS INC NYC DOB building permits | 11 | Sign · INSTALL EXTERIOR ILLUMINATED WALL SIGN (REGAL) No product keyword matched | 9 | Oct 23, 2026 |
| B | THREE STAR CONSTRUCTION NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AT 212 SOUTH OXFORD STREET, BROOKLYN, AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 23, 2026 |
| B | USPS NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND CONSTRUCTION PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 23, 2026 |
| B | RJM Group Home Improvement LLC NYC DOB building permits | 11 | General Construction · Renovate unit 416 on the 4th floor. Work to include removing a non-load bearing wall. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 23, 2026 |
| B | BTU DELTA CONSTRUCTION NYC DOB building permits | 11 | General Construction · ERECT A NEW AWNING AT OSP. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 2 | Oct 23, 2026 |
| B | THE I. GRACE COMPANY COMM NYC DOB building permits | 11 | General Construction · Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy. No product keyword matched | 4 | Oct 23, 2026 |
| B | KMM IMPROVEMENTS CORP NYC DOB building permits | 11 | Structural · PROPOSED STRUCTURAL WORK TO ERECT A NEW ROOF BULKHEAD AND SKYLIGHT AT THE 4TH FLOOR AND UPGRADE THE PARAPET, AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 2 | Oct 23, 2026 |
| B | 544 Steuben ST LLC NYC DOB building permits | 11 | Construction Fence · CONSTRUCTIN FENCE APPLICATION No product keyword matched | 5 | Oct 23, 2026 |
| B | ALLIED BUILDING MAINT.COR NYC DOB building permits | 11 | General Construction · ALTERATION TYPE 2 - REMOVAL OF EXISTING ILLEGAL PORCH ENCLOSURE AND RESTORE EXISTING PORCH AND STEPS TO RESOLVE ECB VIOLATION 34873782H. REFILING OF DOBBIS APPLICATION 322016395. INSTALLATION OF NEW ROOF SHINGLES AND REPAIR OF EXISTING ROOF DECKING AS REQ No product keyword matched | 1 | Oct 23, 2026 |
| B | XENON CONTRUCTION CORP NYC DOB building permits | 11 | Mechanical Systems · This Alteration application is being filed for the mechanical work installation of 8 mechanical units in conjunction with Alt I application #120945442 as per plans filed herewith. There are no change in use, egress or occupancy under this application. No product keyword matched | 2 | Oct 23, 2026 |
| B | JSJDGS LLC NYC DOB building permits | 11 | Construction Fence · 8'-0 HIGH WOOD CONSTRUCTION FENCE. No product keyword matched | 2 | Oct 23, 2026 |
| B | K & G GEKON INC NYC DOB building permits | 11 | General Construction · Removal and relocation of existing interior partitions, re-finishing of floors, walls and ceiling, removal and relocation of plumbing fixtures and appliances in bathroom and kitchen in fourth floor loft. No change in occupancy use or egress. No product keyword matched | 7 | Oct 23, 2026 |
| B | MINGKAI CONSTRUCTION INC NYC DOB building permits | 11 | Structural · FILE STRUCTURAL WORK TYPE IN CONJUNCTION WITH ALT-CO NB JOB #: B01097709-I1. No product keyword matched | 3 | Oct 23, 2026 |
| B | KINGFISHER GENERAL CONTRACTING OF N NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. No product keyword matched | 1 | Oct 23, 2026 |
| B | SADHIA CONTRACTING GRP NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. No product keyword matched | 2 | Oct 23, 2026 |
| B | 25 crescent property LLC NYC DOB building permits | 11 | Plumbing · Filing Plumbing work type in conjunction with OT job number Q00956038-I1 No product keyword matched | 1 | Oct 23, 2026 |
| B | 27-45 JACKSON AVENUE LLC NYC DOB building permits | 11 | Suspended Scaffold · OUTRIGGERS SYSTEM INSTALLATION FOR FACADE INSPECTION AND REPAIRS REPAIRS. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 23, 2026 |
| B | SIMPLE SOLUTIONS & DESIGN NYC DOB building permits | 11 | General Construction · Remodel existing kitchen and suspended ceiling, no change in occupancy use or egress No product keyword matched | 1 | Oct 23, 2026 |
| B | Carlyle Hotel LLC NYC DOB building permits | 11 | General Construction · MINOR PARTITIONS CHANGES INCLUDES REPLACING EXISTING WALLS AS INDICATED ON THE DRAWINGS, ALL PLUMBING WORK WAS FILED UNDER LAA APPLICATION # M01324753 & M01324736 THIS APPLICATION SUPERSEDED APPLICATION # 103956248. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 23, 2026 |
| B | BJ'S WHOLESALE CLUB NYC DOB building permits | 11 | Solar · Solar Panel installation as per plans filed herewith. No product keyword matched | 1 | Oct 23, 2026 |
| B | JOHN'S PLUMBING & HEATING NYC DOB building permits | 11 | Plumbing · APPLICATION FILED FOR PLUMBING WORK ON ALL FLOORS. WORK TO INLCUDE NEW ADA BATHROOM, NEW KITHCNEN FIXTURES, NEW WASHER, AND NEW 3 PC BATHROOM. No product keyword matched | 1 | Oct 23, 2026 |
| B | BROTHERS MECHANICAL P&H CORP NYC DOB building permits | 11 | Plumbing · HEREWITH FILE PLUMBING PLANS FOR APT. 11B TO INSTALL, REPLACE AND RELOCATE PLUMBING FIXTURES IN APT. 11B (FILED IN CONJUNCTION W/DOC I1) No product keyword matched | 4 | Oct 23, 2026 |
| B | BOWMAN CONSTRUCTION CORP NYC DOB building permits | 11 | Mechanical Systems · HVAC THRU-WALL DUCTED SPLIT SYSTEMS INSTALLATION FOR APT 6A AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 23, 2026 |
| B | WIT VENTURES LLC NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR REMOVAL OF UNPERMITTED 8' CURB CUT, REMOVAL OF METAL CANOPIES AND RESTORATION OF CELLAR FLOOR TO PRIOR LEGAL CONDITION TO CURE ECB VIOLATIONS #39125095Y, #39136026Y, & 39136027X. No product keyword matched | 4 | Oct 23, 2026 |
| B | Downtown travel NYC DOB building permits | 11 | Sprinklers · proposed sprinkler application in existing office space, sprinkler system in accordance with the 2022 NYC building code and NFPA 13-2016 No product keyword matched | 3 | Oct 23, 2026 |
| B | OM SAI REALTY LLC NYC DOB building permits | 11 | Construction Fence · New construction wood fence along the facade on the sidewalk No product keyword matched | 4 | Oct 23, 2026 |
| B | ATTRI ENTERPRISES, INC NYC DOB building permits | 11 | General Construction · Perform civil work follows: Remove & install existing roofing, structural slab, hatch, perimeter curb; rigging & steel frame attached to roof structure, steel beam framing at roof, and roof. ***PAA submitted for removal of TR2 & TR3 concrete requirements No product keyword matched | 3 | Oct 23, 2026 |
| B | LIYANA CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · RREPAIR DETERIORATED PORTIONS OF EXISTING WOOD CORNICE WITH WOOD PATCHING COMPOUND, REPLACE DAMAGED WOOD CORNICE IN-KIND, AND SCRAPE AND REPAINT WOOD CORNICE BROWN AT SOUTH FACADE NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 23, 2026 |
| B | Provenza NYC Inc NYC DOB building permits | 11 | Foundation · FILE FOUNDATION AND EARTHWORK No product keyword matched | 4 | Oct 23, 2026 |
| B | TFP10, INC NYC DOB building permits | 11 | Sprinklers · New sprinkler work as per plans filed. No change in use, occupancy or egress. No product keyword matched | 3 | Oct 23, 2026 |
| B | Marina at Kings Plaza LLC NYC DOB building permits | 11 | Plumbing · Proposed installation of new toilets facilities and hot air furnace, including GAS hot water heater. No change to use, occupancy or egress under this application. No product keyword matched | 2 | Oct 23, 2026 |
| B | TORUS CONSTRUCTION GROUP NYC DOB building permits | 11 | Construction Fence · Installation of 8 ft construction fence. No product keyword matched | 2 | Oct 23, 2026 |
| B | Elecor Properties NYC DOB building permits | 11 | Plumbing · Modifications to the existing plumbing fixtures on the 36th floor (Marketing Floor 38- Buildout) as per plans. No change to use, egress or occupancy. No product keyword matched | 4 | Oct 23, 2026 |
| B | GOLDEN ROCK 2026 LLC NYC DOB building permits | 11 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01466154 No product keyword matched | 2 | Oct 23, 2026 |
| B | Infinite Scholars NYC DOB building permits | 11 | Plumbing · AMENDING TO ADDRESS MINOR LAYOUT ALTERATIONS. No product keyword matched | 2 | Oct 23, 2026 |
| B | BRIGADA CONSTRUCTION CORP NYC DOB building permits | 11 | Earth Work · HEREWITH FILE ALTERATION TO DO A EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, AS PER C OF O NUMBER COQ 63029(NB5309-49) TO ERECT INTERIOR RENOVATIONS PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS No product keyword matched | 2 | Oct 23, 2026 |
| B | HONOR CONSTRUCTION INC NYC DOB building permits | 11 | Mechanical Systems · MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 23, 2026 |
| B | Throggs Neck Volunteer Ambulance Co NYC DOB building permits | 11 | Foundation · INSTALLATION OF TWENTY FOUR (24) 3.8KWH UPS BATTERY BACKUP SYSTEM BATTERY AND SCREENING FENCE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. FILED IN CONJUNCTION WITH 240289193-01. refiling of application 240300367. No product keyword matched | 2 | Oct 23, 2026 |
| B | SHAEL SHAPIRO, ARCHITECT NYC DOB building permits | 11 | Suspended Scaffold · Renewal No product keyword matched | 1 | Oct 23, 2026 |
| B | 5B Solutions LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 23, 2026 |