Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | LENLITE ELEC'L CONTR'S IN NYC DOB electrical permits | 11 | General wiring for 120V/20A circuit for a dumb weighter No product keyword matched | 2 | Oct 24, 2026 |
| B | 876 ELECTRICAL CORP NYC DOB electrical permits | 11 |
| 6 |
| Oct 24, 2026 |
| B | ELECSERV INC NYC DOB electrical permits | 11 | The scope of work includes the installation of one (1) new utility meter and the installation of mini split HVAC units. No additional electrical or mechanical work is proposed under this filing. No product keyword matched | 1 | Oct 24, 2026 |
| B | SIGMA ELECTRIC INC. NYC DOB electrical permits | 11 | INSTALLATION OF NEW LIGHTS IN 6 THEATERS WITH EXISTING CONDUCTORS, CIRCUITS AND MINOR CIRCUIT EXTENTIONS OF CONDUCTORS No product keyword matched | 2 | Oct 24, 2026 |
| B | PHILIPS INTERNATIONAL HOLDING CORP. NYC DOB building permits | 11 | General Construction · FACADE RENOVATION - INSTALLATION OF NEW STUCCO. No product keyword matched | 3 | Oct 23, 2026 |
| B | VENTURA LAND CORP NYC DOB building permits | 11 | Plumbing · MODIFICATION TO THE EXISTING SANITARY, STORM SYSTEMS AND ASSOCIATED PIPING AS PER PLANS SUBMITTED HERWTIH. No product keyword matched | 5 | Oct 23, 2026 |
| B | SKY MANAGEMENT CORP NYC DOB building permits | 11 | Plumbing · APT 13 RENOVATION: PL work associated with Primary -I1 application. Direct in-kind replacement of bathroom fixtures, relocation of kitchen sink, new dw, removal of 1 res gas range No product keyword matched | 8 | Oct 23, 2026 |
| B | OWNERS GC NY LLC NYC DOB building permits | 11 | Support of Excavation · SOE filed in conjunction with GC application B01350287-I1 No product keyword matched | 5 | Oct 23, 2026 |
| B | PISACANO REALTY GROUP NYC DOB building permits | 11 | Plumbing · Interior Plumbing work for Apartment 3B Alteration. These is no change in use, occupancy, or egress. No product keyword matched | 2 | Oct 23, 2026 |
| B | EJ HOMES 45 LLC NYC DOB building permits | 11 | General Construction · EXISTING 3 FAMILY BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK ON THE CELLAR,BASEMENT,1ST,2ND AND OPEN SPACE UNDER THIS APPLICATION.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 26 | Oct 23, 2026 |
| B | SANDHU BUILDERS 1 INC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. No product keyword matched | 6 | Oct 23, 2026 |
| B | 228 SEVENTH AVE LLC NYC DOB building permits | 11 | Plumbing · Subsequent filing for plumbing installation in apt. #7 as per the plans filed herewith. No change in the use, egress or occupancy. No product keyword matched | 4 | Oct 23, 2026 |
| B | 35 EAST 75TH STREET CORPORATION NYC DOB building permits | 11 | Mechanical Systems · APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 17TH FL & ROOF (SUITE PHE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 5 | Oct 23, 2026 |
| B | ACCURATE MECHANICAL INC NYC DOB building permits | 11 | Plumbing · Replacement of plumbing fixtures as per plans and installation of a stackable washer/dryer. No product keyword matched | 3 | Oct 23, 2026 |
| B | GLOBAL HOLDINGS NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE AT BROADWAY ELEVATION. No product keyword matched | 5 | Oct 23, 2026 |
| B | HYDRO MECHANICAL INC NYC DOB building permits | 11 | Plumbing · Legalization Conjunction w/ BIS filing #121967167 for plumbing work under this application that commenced without permit to install fixtures, cap & remove, relocate & replace. In addition, removal of work after Decom - closed tenant space. (see comments) No product keyword matched | 6 | Oct 23, 2026 |
| B | PAUL SIGNS INC NYC DOB building permits | 11 | Sign · INSTALL EXTERIOR ILLUMINATED WALL SIGN (NAN XIANG SOUP DUMPLINGS) No product keyword matched | 4 | Oct 23, 2026 |
| B | ALBERT KRULL, ARCHITECT, AIA NYC DOB building permits | 11 | Plumbing · INSTALL NEW GAS METER AND PIPING TO NEW ROOFTOP HVAC UNITS. No product keyword matched | 4 | Oct 23, 2026 |
| B | UNIVERSAL MGMT & CONT COR NYC DOB building permits | 11 | General Construction · Interior renovation to include demo of existing partitions and finishes as shown on plans. No change in use, egress or occupancy. No product keyword matched | 5 | Oct 23, 2026 |
| B | THREE STAR CONSTRUCTION G NYC DOB building permits | 11 | General Construction · Exterior facade repairs, including precast and masonry repairs, sealant replacement, coping, as plans herewith. No change in use, occupancy, or egress. No product keyword matched | 2 | Oct 23, 2026 |
| B | PLUMB-IT MECHANICAL INC NYC DOB building permits | 11 | Plumbing · SUBSEQUENT DOCUMENT FOR PLUMBING WORK IN CONJUNCTION ALTERATION # B01126472-I1. IN CELLAR FLOOR, WORK TO INCLUDE CAP/REMOVAL AND NEW PLUMBING FIXTURES. No product keyword matched | 16 | Oct 23, 2026 |
| B | SISTERS OF CHARITY HOUSING DEVELOPM NYC DOB building permits | 11 | Mechanical Systems · FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH RENOVATIONS AS PER PLANS. No product keyword matched | 8 | Oct 23, 2026 |
| B | QUALITY BUILDING CONSTRUT NYC DOB building permits | 11 | General Construction · Facade repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 23, 2026 |
| B | J&C Lamb Management Corp. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 3 | Oct 23, 2026 |
| B | CHAIM FISHMAN AND ASSOCIATES.COM NYC DOB building permits | 11 | General Construction · To comply with violation #39132396N to install open decks on first, second and third level. No change to egress or bulk. Work as per plan. No product keyword matched | 1 | Oct 23, 2026 |
| B | 71-14 Austin LLC NYC DOB building permits | 11 | Mechanical Systems · Application is filed only for purpose of providing the correct specification for RTU units. These units were filed and installed under app Q01222149-I1 but the specifications were incorrectly noted. No work to be filed under this application. No product keyword matched | 1 | Oct 23, 2026 |
| B | US LEVIN GRP CORP NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF APARTMENT 11A. NO CHANGE TO USE EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 23, 2026 |
| B | HARVEST POWER LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 3 | Oct 23, 2026 |
| B | SAT CONSTRUCTION SERVICES NYC DOB building permits | 11 | General Construction · New four story mixed use building No product keyword matched | 11 | Oct 23, 2026 |
| B | INGRAVALLO CORP. NYC DOB building permits | 11 | Construction Fence · FENCE APPLICATION FILED IN CONJUNCTION WITH 293 & 297 WOODVALE AVENUE. APPLICATIONS # S01282908-i1 (293 WOODVALE AVENUE) AND S01283752-I1 (297 WOODVALE AVENUE). No product keyword matched | 3 | Oct 23, 2026 |
| B | GW MECHANICAL CORP NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN APT 5C No product keyword matched | 8 | Oct 23, 2026 |
| B | M&R IMPROVEMENTS CORP NYC DOB building permits | 11 | General Construction · enlargement of 2-family dwelling, no change to exist use/egress/occupancy under this application No product keyword matched | 12 | Oct 23, 2026 |
| B | BOLLA EM REALTY, LLC NYC DOB building permits | 11 | Sign · Installation of 3 wall signs are depicted on plans. No product keyword matched | 6 | Oct 23, 2026 |
| B | Shops at Atlas Park NYC DOB building permits | 11 | General Construction · Partition work in Association with the installation of 2 Tankless Hot water Heater No product keyword matched | 2 | Oct 23, 2026 |
| B | Realty brothers 2 llc NYC DOB building permits | 11 | Curb Cut · CURB CUT No product keyword matched | 3 | Oct 23, 2026 |
| B | JENOCA CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · INTERIOR REMOVAL OF NON-STRUCTURAL PARTITIONS IN EXISTING 3-STORY WITH BASEMENT AND CELLAR, RESIDENTIAL BUILDING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION No product keyword matched | 1 | Oct 23, 2026 |
| B | GLEN OAKS VILLAGE OWNERS, INC. NYC DOB building permits | 11 | General Construction · FILING HEREWITH PLANS AND APPLICATION FOR NEW SIDE ENTRANCE TO SIDE YARD WITH THE NEW 199 SQFT OF BRICK STEPS AND PAVERS. NO CHANGE IN USE,EGRESS OR OCCUPANCY. No product keyword matched | 8 | Oct 23, 2026 |
| B | BIRESH INC NYC DOB building permits | 11 | General Construction · NEW 6 STORY MIXED USE BUILDING - COMUNITY FACILITY AND RESIDENTIAL No product keyword matched | 1 | Oct 23, 2026 |
| B | 332 W 11 HOLDING LLC NYC DOB building permits | 11 | Foundation · Subsequent filing for modification/upgrade to existing foundation. No product keyword matched | 5 | Oct 23, 2026 |
| B | CADENCE 51/52 DEVELOPMENT LLC NYC DOB building permits | 11 | General Construction · Filed herewith Alteration GC application for an exposed party wall repair work as per plans filed. No change in occupancy, use or egress. No product keyword matched | 1 | Oct 23, 2026 |
| B | NEFCO ENTERPRISES INC NYC DOB building permits | 11 | Construction Fence · temporary construction fence. No product keyword matched | 8 | Oct 23, 2026 |
| B | OXFORD PROPERTIES NYC DOB building permits | 11 | Sprinklers · Sprinkler modifications taking place on the 11th floor as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 1 | Oct 23, 2026 |
| B | RAFALEX CONTRACTING CORP NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION FOR CREATE NEW BATHROOM ON THE FIRST FLOOR OF EXISTING THREE FAMILY HOUSE.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 1 | Oct 23, 2026 |
| B | BHD GROUP LLC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL FILING SUBSEQUENT TO GC FILING - DESIGN INCLUDES THE INSTALLATION OF AIR CONDITIONING SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 4 | Oct 23, 2026 |
| B | BRANCH PLUMBING LLC NYC DOB building permits | 11 | Plumbing · THIS APPLICATION IS FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH Q01557851 No product keyword matched | 2 | Oct 23, 2026 |
| B | PRO-MONTE GROUP LLC NYC DOB building permits | 11 | General Construction · Combination of Apt 10D & 10E. Interior Renovation and minor partitions. No change of use, egress or occupancy under this application. No product keyword matched | 1 | Oct 23, 2026 |
| B | 4519 WPR HOUSING DEV FUND NYC DOB building permits | 11 | General Construction · PROPOSE NEW 6-STORY PLUS CELLAR BUILDING AS NON-PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS (USE GROUP 3A) AS PER PLAN. BUILDING AS PER PLAN. OBTAIN NEW C OF O. No product keyword matched | 2 | Oct 23, 2026 |
| B | TRISTATE PLBG SVCS CORP NYC DOB building permits | 11 | Plumbing · Herewith filing plumbing modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. No product keyword matched | 6 | Oct 23, 2026 |
| B | SBG DEVELOPMENT LLC NYC DOB building permits | 11 | General Construction · INTERIOR DEMOLITION OF AN EXISTING STORE NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 23, 2026 |
| B | INVESTMATES NYC DOB building permits | 11 | Construction Fence · installation of construction fence to protect site, during full demolition. No product keyword matched | 8 | Oct 23, 2026 |