Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ABNER PROPERTIES COMPANY NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 2ND FLOOR (NEW BATHROOMS, PANTRY AND MECHANICAL ROOM) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 6 | Nov 10, 2026 |
| B |
| SLATE PG NYC DOB building permits |
| 11 |
Plumbing · Replace plumbing fixture in kind as per plans. No change in use, occupancy or egress. No product keyword matched |
| 5 |
| Nov 10, 2026 |
| B | BRONX CARE - HEALTH SYSTEM NYC DOB building permits | 11 | Mechanical Systems · Installing air condition system, and duck work. No product keyword matched | 1 | Nov 10, 2026 |
| B | ABILENE, INC NYC DOB building permits | 11 | Boiler Equipment · INSTALL NEW STEAM HEAT BOILER INTO EXISTING STEAM DISTRIBUTION CONNECTIONS, INSTALL NEW BREECHING & STAINLESS-STEEL CHIMNEY LINER FOR NEW BOILER & NEW HWH/TANK(S), WHICH ARE FILED UNDER THE ASSOC PL B01473994-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 10, 2026 |
| B | TESTBUSINESS1 NYC DOB building permits | 11 | Plumbing · ss No product keyword matched | 6 | Nov 10, 2026 |
| B | ABOVE CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · Remove partitions to restore cellar to prior legal use. Finishing floor, walls and ceiling as per plans. This application is filed to resolve ECB violations 39170325N, 39170324L, 39170323J & 39170322H. No change in egress, occupancy or use. No product keyword matched | 1 | Nov 10, 2026 |
| B | INDEV REAL ESTATE NYC DOB building permits | 11 | General Construction · FACADE REPAIR TO INCLUDE MASONRY REPAIRS AND REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 10, 2026 |
| B | MEMBER NYC DOB building permits | 11 | Construction Fence · Temporary Construction Fence No product keyword matched | 1 | Nov 10, 2026 |
| B | PR WOOD LAB CONSTRUCTION NYC DOB building permits | 11 | Foundation · APPLICATION FILE TO PROPOSE UNDERPINNING WORK IN-CONJUNCTION WITH JOB # Q01091747 - I1 No product keyword matched | 2 | Nov 10, 2026 |
| B | LANZO CONSTRUCTION & HOME NYC DOB building permits | 11 | General Construction · Alteration of the first floor kitchen in an existing two-family dwelling. and partition wall removal and light general construction, no change to use, egress, or occupancy No product keyword matched | 1 | Nov 10, 2026 |
| B | CENTERPARK NYC DOB building permits | 11 | Structural · INSTALLATION OF TEMPORARY SHORING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Nov 10, 2026 |
| B | TAB RESTORATIONS INC NYC DOB building permits | 11 | General Construction · Replacement of the parapet wall along the Bailey Avenue side of the building. Replacement of the damaged bricks and lintels. No product keyword matched | 5 | Nov 10, 2026 |
| B | ARCHBISHOP MOLLOY HIGH SCHOOL NYC DOB building permits | 11 | Mechanical Systems · Installation of heat pump units serving the boys and girls locker rooms on the first floor, with associated condenser units located on the first-floor roof. No product keyword matched | 1 | Nov 10, 2026 |
| B | THE JANE HOTEL NYC DOB building permits | 11 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - SPARROW ITALIA. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 6 | Nov 10, 2026 |
| B | KORBUILD INC NYC DOB building permits | 11 | Construction Fence · FILING CONSTRUCTION FENCE. No product keyword matched | 4 | Nov 10, 2026 |
| B | PENTA RESTORATION CORP NYC DOB building permits | 11 | General Construction · REMOVAL OF INTERIOR NON-LOAD BEARING WALLS IN THE CELLAR TO COMPLY WITH THE VIOLATIONS #39189813M, #39189814Y AND #39189815X. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Nov 10, 2026 |
| B | BERKS CONSTRUCTION GROUP NYC DOB building permits | 11 | Support of Excavation · Support of Excavation for contruction of new swimming pool as shown in the drawings filed herewith. No product keyword matched | 5 | Nov 10, 2026 |
| B | ISLAND HOUSE TENANTS CORP. NYC DOB building permits | 11 | Plumbing · Plumbing renovations to existing two-bedroom residence. General construction filed separately under DOB NOW application M01464466-I1. No product keyword matched | 8 | Nov 10, 2026 |
| B | PORVEN NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 10, 2026 |
| B | STERLING EQUITIES NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AT COURT STREET AND DOUGLASS STREET ELEVATIONS. No product keyword matched | 1 | Nov 10, 2026 |
| B | RIMANI GROUP INC NYC DOB building permits | 11 | General Construction · Installation of a Sub-Slab Depressurization System below the new building slab, riser piping through the building, and a discharge pipe above the roof line. Application supersedes previously approved application B00596151-Z4. No product keyword matched | 2 | Nov 10, 2026 |
| B | 63 Wall Street Owner, LLC NYC DOB building permits | 11 | Standpipe · Temp standpipe application filed in conjunction with Alt-1 # 103493514 for Stair B Enlargement No product keyword matched | 1 | Nov 10, 2026 |
| B | MCR Hotels NYC DOB building permits | 11 | Structural · Structural alterations to the public spaces of the hotel. No product keyword matched | 19 | Nov 10, 2026 |
| B | Broadway Continental Corp. NYC DOB building permits | 11 | Mechanical Systems · HVAC unit replacement. All existing ductwork to remain. No change in use egress and occupancy. No product keyword matched | 1 | Nov 10, 2026 |
| B | CUSTOM METALCRAFTERS, INC. NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 6 | Nov 10, 2026 |
| B | SERVICEMASTER RESTORATION BY MARANO NYC DOB building permits | 11 | Plumbing · Plumbing work for exiting 2 family home in conjunction with interior renovation. No change in use, egress or occupancy. No product keyword matched | 6 | Nov 10, 2026 |
| B | DIVCO WEST REAL ESTATE SERVICES NYC DOB building permits | 11 | Mechanical Systems · Mechanical modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 13 | Nov 10, 2026 |
| B | CDS DESIGN AND CONSULTING NYC DOB building permits | 11 | Structural · MINOR STRUCTURAL MODIFICATION ON THE FIRST FLOOR AS PER PLAN FILED HEREWITH. THIS APPLICATION IS RELATED TO APPROVED GC ALT M01334377-I1. NO CHANGE TO USE, BULK EGRESS, OR OCCUPANCY IS PROPOSED. No product keyword matched | 2 | Nov 10, 2026 |
| B | EAST GUNHILL ROAD FOOD LLC NYC DOB building permits | 11 | Construction Fence · HEREWITH FILED APPLICATION FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE 8'-0 HIGH AS PERPLANS. FILED IN CONJUNCTION WITH APPLICATION #Q01391691 No product keyword matched | 4 | Nov 10, 2026 |
| B | Innospark Design NYC DOB building permits | 11 | Plumbing · INSTALL BOILER AND H.W.H. IN CELLAR OF 2 STORY RESIDENTIAL BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 36 | Nov 10, 2026 |
| B | THE TOWERS COOPERATIVE CORP. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS IN FRONT OF THE BUILDING AT 81ST STREET ELEVATION, No product keyword matched | 18 | Nov 10, 2026 |
| B | Upper West Side Cinema Center NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED FRONT OF THE BUILDING. No product keyword matched | 2 | Nov 10, 2026 |
| B | SHARON REALTY NY CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. THE SIDEWALK SHED IS AT EAST 28TH STREET ELEVATION. No product keyword matched | 1 | Nov 10, 2026 |
| B | 359 17th St LLC NYC DOB building permits | 11 | Mechanical Systems · HVAC WORK RELATED TO THE RENOVATION OF EXISTING 1056 SQFT, 2 STORY CELLAR AND ONE FAMILY TOWNHOUSE WITH A NEW 3RD FLOOR VERTICAL ADDTION AND HORIZONTAL EXTENSION No product keyword matched | 3 | Nov 10, 2026 |
| B | HALPERN&PINTEL NYC DOB building permits | 11 | General Construction · FACADE RESTORATION AS SHOWN ON PLANS No product keyword matched | 2 | Nov 10, 2026 |
| B | GORDON PROPERTY GROUP NYC DOB building permits | 11 | Sign · ERECT A NON-ILLUMINATED BUSINESS ACCESSORY TEMPORARY BANNER ON SCAFFOLDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Nov 10, 2026 |
| B | YL INTERIOR LLC NYC DOB building permits | 11 | Support of Excavation · PROPOSED SUPPORT OF EXCAVATION WORK FILING #B01194222-S6 IN CONJUNCTION WITH G/C FILING #B01194222-I1 No product keyword matched | 4 | Nov 10, 2026 |
| B | PROSPECT MANAGEMENT NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF OUTRIGGERS FOR THE FACADE REPAIR WORK AS PER THE SUBMITTED PLAN No product keyword matched | 13 | Nov 10, 2026 |
| B | RESTORED HOMES HDFC NYC DOB building permits | 11 | Mechanical Systems · Propose chimney extension work at 678 Central Ave as per plan. No product keyword matched | 1 | Nov 10, 2026 |
| B | MORLEIGH APTS. OWNERS CORP. NYC DOB building permits | 11 | Suspended Scaffold · Installation of material hoist No product keyword matched | 1 | Nov 10, 2026 |
| B | AKSH QUALITY CONTRACTING NYC DOB building permits | 11 | General Construction · EXTERIOR RENOVATION, ADDITIONAL FLOOR, EXCAVATION INTO FOUNDATION No product keyword matched | 2 | Nov 10, 2026 |
| B | W6 FACILITY X. LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 10, 2026 |
| B | EXCELLENT METROPOLITAN CONSTRUCTION NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 10 | Nov 10, 2026 |
| B | ELITE CONCRETE NY LLC NYC DOB building permits | 11 | Earth Work · SUBSEQUENT FILING FOR FOUNDATION WORK IN-CONJUNCTION TO ALT-CO NB FILING #B01286004-I1 No product keyword matched | 4 | Nov 10, 2026 |
| B | PRESIDENT NYC DOB building permits | 11 | Structural · Structural work proposed for safeguards (wire fencing and netting) for rooftop playground. No product keyword matched | 3 | Nov 10, 2026 |
| B | NY HILL RESTORATION, INC NYC DOB building permits | 11 | General Construction · Facade and exterior repairs per drawings. No change in use, egress or occupancy is involved under this application. No product keyword matched | 4 | Nov 10, 2026 |
| B | Axio Property Management NYC DOB building permits | 11 | Plumbing · REPLACE GAS RISER AND METER. REFILING OF APPLICATION NO. M00356355-I1. No product keyword matched | 2 | Nov 10, 2026 |
| B | BUTCH ENTERPRISE LLC NYC DOB building permits | 11 | Plumbing · APPLICATION BEING FILED TO INSTAL 3 NEW FIXTURES AND RELOCATE 5 FIXTURES No product keyword matched | 2 | Nov 10, 2026 |
| B | EMPIRE 30 CONDO ASSOC NYC DOB building permits | 11 | Sprinklers · Install, relocate, replace and remove sprinkler heads on the 6th and 7th floor. Sprinkler Work. No change in use, occupancy or egress. No product keyword matched | 3 | Nov 10, 2026 |
| B | Fieldston Power LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 12 | Nov 10, 2026 |