Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | OHEL CHILDREN'S HOME AND FAMILY SER NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 26, 2026 |
| B | REPUBLIC EXTERIOR SERVICES CORP. NYC DOB building permits |
| 11 |
Supported Scaffold · Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched |
| 3 |
| Oct 26, 2026 |
| B | HARD ROCK CONSTRUCTION NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. No product keyword matched | 3 | Oct 26, 2026 |
| B | MAZ 247 CORP NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR COVERT 1 FAMILY DWELLING UNIT TO 2 FAMILY DWELLING UNITS WITH MINOR ALTERATION AT BASEMENT LEVEL , NO BULK CHANGE INCLUDING PLUMBING WORK AS PER PLAN AND OBTAIN NEW C.OF O. No product keyword matched | 4 | Oct 26, 2026 |
| B | 50 W 27TH STREET LLC NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION OF EXISTING KITCHEN AND BATHROOMS ON THE FIRST AND SECOND FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR LOT COVERAGE. No product keyword matched | 1 | Oct 26, 2026 |
| B | BUILDRITE CONTRACTING INC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 26, 2026 |
| B | PRO RENO NYC CORP NYC DOB building permits | 11 | General Construction · ALTERATION OF EXISTING DWELLING UNIT 5A - NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 26, 2026 |
| B | AK GENERAL CONTRACTOR COR NYC DOB building permits | 11 | Construction Fence · ERECT AN 8' HIGH CONSTRUCTION FENCE AT THE PERIMETER OF THE PROPERTY. No product keyword matched | 7 | Oct 26, 2026 |
| B | Tried Stone Baptist Church NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 26, 2026 |
| B | M&N CONSTRUCTION COMPANY NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION INCLUDE REMOVING SOME PARTITIONS, REMOVE KITCHEN AND 1 BATHROOM TO COMPLY HRP COMPLAINT NO. 3964924. KEEP 3 PCS BATHROOM. NO CHANGE IN USE,EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 26, 2026 |
| B | HP HOME IMPROVEMENT SERVI NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF A WOOD CONSTRUCTION FENCE No product keyword matched | 1 | Oct 26, 2026 |
| B | WOODBURY CONSTRUCTION SER NYC DOB building permits | 11 | General Construction · ALTERATIONS TO UNIT 16B. CONSTRUCTION OF PARTITION WALLS AND INSTALLATION OF NEW FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 26, 2026 |
| B | CONSTRUCTION MANAGERS * NYC DOB building permits | 11 | Mechanical Systems · Installation of new HVAC systems, including equipment, ductwork, and piping. Work filing in conjunction with new building application. Mechanical work for 10 story new building No product keyword matched | 3 | Oct 26, 2026 |
| B | WSA WATERFRONT LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS ON THE 39th FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS INVOLVED. No product keyword matched | 1 | Oct 26, 2026 |
| B | 301 EAST 71 INVESTORS LLC NYC DOB building permits | 11 | Plumbing · Herewith filing plumbing work in conjunction with New Building No product keyword matched | 7 | Oct 26, 2026 |
| B | ALSS CONSTRUCTION INC NYC DOB building permits | 11 | Earth Work · Foundation Design for a Three-Story New Building. No product keyword matched | 3 | Oct 26, 2026 |
| B | 1201 HYLAN LLC NYC DOB building permits | 11 | General Construction · Partial renovation in an existing commercial spce. No changes to use, occupancy, or egress. No product keyword matched | 1 | Oct 26, 2026 |
| B | MYRIAD CONSTRUCTION SERVI NYC DOB building permits | 11 | General Construction · Interior renovation of an existing apartment (6W) as per plans. No change to use, egress, or occupancy. No product keyword matched | 2 | Oct 26, 2026 |
| B | PROJECT FIND NYC DOB building permits | 11 | General Construction · FACADE REPAIRS, NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 26, 2026 |
| B | ARGO REAL ESTATE NYC DOB building permits | 11 | General Construction · Herewith filing a Garage Restoration as per plans. No Change in Occupancy, use or Egress. No product keyword matched | 4 | Oct 26, 2026 |
| B | PISILI INC NYC DOB building permits | 11 | General Construction · Interior Partition Change on Second Floor to Convert 2 Family to a 1 Family on second floor. No product keyword matched | 4 | Oct 26, 2026 |
| B | Monroe Place BK LLC NYC DOB building permits | 11 | General Construction · Interior renovations. Demolition & construction of new partitions. Installation of a kitchen under religious exemption, front patio work, & new opening through party wall between 5 &7 Monroe as per plans filed herewith. No change in Use, Egress, Occupancy No product keyword matched | 1 | Oct 26, 2026 |
| B | JAY HOLDING CORP NYC DOB building permits | 11 | Plumbing · BASEMENT ONLY TO CAP & REMOVE (1) LAVATORY, (1) TOILET,(1) SHOWER, (4) GAS DRYERS, (1) GAS RANGE & (1) GAS METER; LEGALIZE (4) WASHING MACHINES & (1) SLOP SINK; PROVIDE (1) NEW FLOOR DRAIN WITH CHECK VALVE & (1) NEW FLOOR SINK WITH STRAINER (continued) No product keyword matched | 1 | Oct 26, 2026 |
| B | BROWNSVILLE ARTS OWNER LLC NYC DOB building permits | 11 | Suspended Scaffold · ACCESSING BUILDING SHAFT No product keyword matched | 5 | Oct 26, 2026 |
| B | WATER WORKS PIPING INC NYC DOB building permits | 11 | Sprinklers · PROPOSED PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # B01323143-I1 No product keyword matched | 4 | Oct 26, 2026 |
| B | STERLING ELECTRIC INC. NYC DOB electrical permits, NYC DOB building permits | 11 | Re-energizing existing Meter. No product keyword matched | 1 | Oct 26, 2026 |
| B | 298 GARFIELD PLACE OWNERS CORP. NYC DOB building permits | 11 | Structural · Filing herewith for the Structural work for new non-combustible private terrace with new steel beams over existing rear extension subsequent to GC filing DOB NOW# B00961751-I1. There is no change to use, occupancy, or egress. No product keyword matched | 1 | Oct 26, 2026 |
| B | Consulate General of Japan NYC DOB building permits | 11 | General Construction · JOB ACCEPTED TO CENTRAL DEVELOPMENT UNIT AT CONSULT ON 3/20/25. INTERIOR AND EXTERIOR RENOVATIONS OF EXISTNG ONE-FAMILY DWELLING. WORK ON FLOORS SUBCELLAR, CELLAR, MEZZ, FLOORS 1-5, ROOF AND FACADES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 26, 2026 |
| B | INVENTIVE CONTRACTING INC NYC DOB building permits | 11 | General Construction · combination of apartments 18A & 18B, including plumbing fixtures and lighting as per TPPN 3/97 No product keyword matched | 1 | Oct 26, 2026 |
| B | HAPPY HOME CONSTRUCTION CORP NYC DOB building permits | 11 | Structural · PROPOSED STRUCTURAL WORK IN CONJUNCTIN WITH NB #420665925. SOE & FO WORK UNDER NB #420665925 FILED IN BIS. No product keyword matched | 1 | Oct 26, 2026 |
| B | CAPITAL MANAGEMENT NYC DOB building permits | 11 | General Construction · PARAPET WALL REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION No product keyword matched | 1 | Oct 26, 2026 |
| B | LBL Improvement Services Inc NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Oct 26, 2026 |
| B | BLUE FOX ESTATES, LLC NYC DOB building permits | 11 | Plumbing · REVISE PLUMBING FACILITIES IN ONE FAMILY RESIDENCE No product keyword matched | 3 | Oct 26, 2026 |
| B | NEDA DEVELOPMENT INC. NYC DOB building permits | 11 | General Construction · New 6 story mix-use building with commercial, community facility and residential. Obtain new C of O. No product keyword matched | 1 | Oct 26, 2026 |
| B | Bronx Gardens Rehabilitation LLC NYC DOB building permits | 11 | Sprinklers · PLUMBING AND SPRINKLER WORK SUBSEQUENT TO ALT CO APPLICATION #M01379346-I1 No product keyword matched | 3 | Oct 26, 2026 |
| B | meldnyc NYC DOB building permits | 11 | General Construction · RESPECTFULLY REQUEST MINOR INTERIOR RENOVATION AS PER PLANS - RELOCATED EXISTING KITCHEN, REMOVED EXISTING CLOSET, PROPOSED NEW MILLWORK (KITCHEN CABINETS, SHELVES AND MURPHY BED) AND CLOSET NEXT TO THE MAIN ENTRANCE, NO CHANGE OF USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 26, 2026 |
| B | B & D CONSTRUCTION SA INC NYC DOB building permits | 11 | General Construction · 1. REPLACE THE CRACK BRICK AT WEST FACADE APPROXIMATELY=40 PCS2. RE-POINTING THE BRICK JOINTS AT WEST FACADE APPROXIMATELY=200 SF No product keyword matched | 4 | Oct 26, 2026 |
| B | BO MAY REALTY CORP. NYC DOB building permits | 11 | Boiler Equipment · REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING BOILER. CHANGE GRADE OF FUEL FROM #4 TO #2 OIL. No product keyword matched | 3 | Oct 26, 2026 |
| B | PRIMELINE PLUMBING INC. NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN EXISTING APARTMENT 16B AS PER PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 3 | Oct 26, 2026 |
| B | VORG DEVELOPMENT LLC NYC DOB building permits | 11 | Full Demolition · Full demolition to a three story building No product keyword matched | 4 | Oct 26, 2026 |
| B | SANFRA REALTY CORP NYC DOB building permits | 11 | Plumbing · new/relocated of plumbing fixtures at basement ,1st and 2nd floors No product keyword matched | 5 | Oct 26, 2026 |
| B | INTEGRITY CONTRACTING INC NYC DOB building permits | 11 | Structural · structural application filed subsequently with the Alt. CO application. Removal of existing masonry walls and new penetrations, replace roof structure and new gravity supports at one quadrant of the building, provisions for new skylights and roofing. No product keyword matched | 3 | Oct 26, 2026 |
| B | AK DIAMONDS REALITY NYC DOB building permits | 11 | Full Demolition · Demolition of 1 story retail building. No product keyword matched | 3 | Oct 26, 2026 |
| B | NSK HOME IMPROVEMENT CORP NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF EXISTING APARTMENT 7D ON THE SEVENTH FLOR. NO ANY CHANGE IN USE, FLOOR AREA, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Oct 26, 2026 |
| B | KLM MECHANICAL NYC DOB building permits | 11 | General Construction · CORRECTION OF VIOLATIONS. REMOVE UNPERMITTED ROOF BATHROOMS, BAR, PARTITIONS, CEILINGS, FLOORING, PLUMBING/ELECTRICAL; REMOVE MEZZANINE OFFICE/BATHROOM AND STEEL LIFT. PROVIDE 6' CLEAR FDNY ROOF ACCESS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 26, 2026 |
| B | 500-512 SEVENTH AVENUE LP NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 2 | Oct 26, 2026 |
| B | ADAM ELECTRICAL CONTRACTING LLC NYC DOB building permits | 11 | Plumbing · Application file to convert existing 1 FM dwelling unit to 2 Family dwelling unit with Knew Kitchen and bathroom at Basement. No bulk Change. No product keyword matched | 1 | Oct 26, 2026 |
| B | 2381 86TH STREET LLC NYC DOB building permits | 11 | Mechanical Systems · FILING FOR THE MECHANICAL HOOD, DUCTS, AND EXHAUST FAN FOR THE FIRST FLOOR COMMERCIAL SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 26, 2026 |
| B | PROKAST CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · Renovation of Penthouse unit 5C including removal and installation of non-bearing partitions and related finishes, and removal of no-non load bearing masonry for replacement of window as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 26, 2026 |
| B | Veronicast LLC NYC DOB building permits | 11 | Structural · APT 4R INTERIOR MODIFICATIONS & STRUCTURAL REMEDIATION AT 3RD & 4TH FL CORRIDORS. INCL NEW FLOORING, CEILINGS, PARTITIONS, FINISHES, & BATHROOM & KITCH CABINETRY. NO CHG TO EXTG APT LAYOUTS. NO CHG IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 26, 2026 |