Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,497
Tier S19
New this week121
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BBayview Reentry Owner LLC
NYC DOB building permits
11
Structural · FACADE OPENINGS IN PORTIONS OF MASONRY EXTERIOR WALL ON NORTH FACADE FOR CONSTRUCTION HOIST INSTALLATION AND TO ALLOW FOR ACCESS.
No product keyword matched
2Oct 27, 2026
BYANKEE MANAGEMENT COMPANY INC.
Seer chat
NYC DOB building permits
11
General Construction · CONSTRUCTION OF A TENANT LAUNDRY ROOM IN CELLAR.
No product keyword matched
3
Oct 27, 2026
B28TH HIGHLINE ASSOCIATES, LLC
NYC DOB building permits
11
Mechanical Systems · MECHANICAL WORK FILING FOR A RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
No product keyword matched
2Oct 27, 2026
BARGONAUT HOLDINGS, LLC
NYC DOB building permits
11
Structural · ENGINEERED DRAWINGS FOR PARAPET STABILIZATION, BRICK STITCHING AND BRICK POINTING.
No product keyword matched
3Oct 27, 2026
BIBM CONSTRUCTION, LLC
NYC DOB building permits
11
General Construction · PROPOSED INTERIOR RENOVATION AND COMBINATION OF UNITS 22 AND 24 AT 4TH FLOOR LEVEL AS PER L.L.77 OF 1968, NEW GENERAL CONSTRUCTION AND PLUMBING WORK. THERE IS NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
No product keyword matched
1Oct 27, 2026
BKDS SAGAMORE RANGER
NYC DOB building permits
11
Sprinklers · New electric water heater. New fixtures in bathrooms and pantry. Modify existing sprinkler system. Relocation of 10 existing heads, added 5 new heads.
No product keyword matched
7Oct 27, 2026
BDITMARS REAL ESTATE CONSULTANTS INC
NYC DOB building permits
11
Plumbing · Filed to amend -S1 to Legalize existing gas fired appliances such as RTU's, water heaters, furnaces, unit heaters, and various commercial kitchen equipment. There is no change in use, occupancy, egress.
No product keyword matched
1Oct 27, 2026
Baish equties
NYC DOB building permits
11
Plumbing · Application filed for all plumbing work. No change to use, egress or occupancy.
No product keyword matched
1Oct 27, 2026
BPA BUILDERS, INC
NYC DOB building permits
11
General Construction · AT 1ST FLOOR TENANT SPACE, INSTALLATION OF PARTITIONS, CEILINGS, LIGHTING, AND FINISHES AS PER PLANS FILED HEREWITH.
No product keyword matched
1Oct 27, 2026
BPromise Property LLC
NYC DOB building permits
11
General Construction · RENOVATION OF MIXED USE BUILDING, INCLUDING REPLACEMENT OF FLOORING, WINDOW AND FRONT EXTERIOR BRICK VENEER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
No product keyword matched
1Oct 27, 2026
BAll Stars Project, Inc
NYC DOB building permits
11
Sprinklers · SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST FL AND 1ST FL MEZZ. OF EXISTING THEATRE/OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
2Oct 27, 2026
BEMERALD MECHL SOLUTIONS I
NYC DOB building permits
11
Plumbing · Replace existing plumbing fixtures in kind. No change to use, egress, or occupancy.
No product keyword matched
2Oct 27, 2026
BUNCLE PARK FLUSHING INC
NYC DOB building permits
11
Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
No product keyword matched
3Oct 27, 2026
BForever 1667
NYC DOB building permits
11
Plumbing · APPLICATION FILING TO REMOVE AND REPLACE 1 LAV, 1 W/C & 1 TUB, 1 SINK & 1 STOVE AT 1ST FL AND INSTALL 1 LAV, 1 W/C, 1 SHOWER , 1 SLOPE SINK AND 1 WASHER AND 1 DRYER AT BSMT IN CONNECTION GC WORK TYPE AS PER PLAN. NIO CHANGE OF USE, EGRESS AND OCCUPANCY.
No product keyword matched
2Oct 27, 2026
BAMDA, INC.
NYC DOB building permits
11
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched
2Oct 27, 2026
BHF Management
NYC DOB building permits
11
Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
No product keyword matched
3Oct 27, 2026
BJMM 17TH STREET LLC
NYC DOB building permits
11
Plumbing · RENOVATE EXISTING BASEMENT APARTMENT AND VESTIBULE AS PER PLANS ATTACHED, INCLUSIVE OF PLUMBING WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
No product keyword matched
3Oct 27, 2026
BHABITAT MANAGMENT
NYC DOB building permits
11
General Construction · COMBINATION OF TWO ADJACENT APARTMENTS ON THE 4TH FLOOR OF A FOUR STORY APARTMENT BUILDING. NEW PARTITIONS, FINISHES, ELECTRICAL AND PLUMBING. NO CHANGE TO USE OR EGRESS.
No product keyword matched
2Oct 27, 2026
BYDJ Realty LLC
NYC DOB building permits
11
Plumbing · PLUMBING REPAIR WORK IN CONJUNCTION TO ALTERATION JOB#Q01408940-I1 AND ADDRESS VIOLATIONS.
No product keyword matched
2Oct 27, 2026
BCELANO
NYC DOB building permits
11
Plumbing · CAP & REMOVE ILLEGAL SINK, GAS STOVE. LEGALIZED 3PC BATHROOM AT CELLAR. REMEDY ECB VIOLATION#34153479J.34153478H,34151190J. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
No product keyword matched
2Oct 27, 2026
BLIN ZHU LLC
NYC DOB building permits
11
Plumbing · FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
2Oct 27, 2026
B11 WEST MANAGEMENT LLC
NYC DOB building permits
11
Plumbing · MINOR PLUMBING WORK TO INSTALL WASHERS AND PEDICURE CHAIRS FOR A NEW TECHNICAL AND TRADE SCHOOL (USE GROUP: VI (6115) ON 4TH FLOOR. NO CHANGE IN USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION.
No product keyword matched
2Oct 27, 2026
BThe Town Hall Foundation Inc
NYC DOB building permits
11
Sprinklers · Modification to existing sprinkler system and related piping as shown on drawings. No change to use, egress or occupancy.
No product keyword matched
2Oct 27, 2026
BChurch of Our Lady of Mercy
NYC DOB building permits
11
Plumbing · CONVERT EXISTING OIL BURNER WITH DUEL FUEL BURNER FOR EXISTING BOILER. EXISTING GAS LINE TO BE TESTED AND NEW PIPING AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
1Oct 27, 2026
B1616 PROPERTIES LLC
NYC DOB building permits
11
General Construction · NO CHANGES TO USE, OCCUPANCY AND/OR EGRESS; PROPOSED BEAUTY SALON AT FIRST FLOOR - PARTITIONS, CEILING, STORE FRONT AND FINISHES. NOTE: TO BE FILED UNDER SEPARATE APPLICATION(S) - PLUMBING AND SIGN; UTILIZE/MODIFY AS NECESSARY EXISTNIG MECHANICAL SYSTEM.
No product keyword matched
2Oct 27, 2026
BMONROE COLLEGE
NYC DOB building permits
11
Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched
1Oct 27, 2026
BABC Plus
NYC DOB building permits
11
Mechanical Systems · REPLACEMENT OF ROOF TOP SINGLE-PACKAGE HVAC UNIT. NO CHANGES TO OCCUPANCY, MEANS OF EGRESS, OR OCCUPANT LOAD.
No product keyword matched
1Oct 27, 2026
BOMNIBUILD CONSTRUCTION IN
NYC DOB building permits
11
Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE
No product keyword matched
1Oct 27, 2026
BJACO MECHANICAL INC
NYC DOB building permits
11
Mechanical Systems · Replacement of air conditioning units. No change in use egress and occupancy.
No product keyword matched
1Oct 27, 2026
BSummit mgmt
NYC DOB building permits
11
Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
2Oct 27, 2026
BVK191 PROPERTY LLC
NYC DOB building permits
11
Construction Fence · INSTALLATION OF CONSTRUCTION FENCE FOR LOT #1 AND #2 W/ 160'-0 FRONTAGE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
No product keyword matched
3Oct 27, 2026
BG BUDDY INC.
NYC DOB building permits
11
Plumbing · To file PL plumbing work in conjunction with DOB Now Build application job#S01036548. No change in use, egress or occupancy under this application.
No product keyword matched
1Oct 27, 2026
BMARATHON ASSET MANAGEMENT
NYC DOB building permits
11
Suspended Scaffold · INDUSTRIAL ROPE ACCESS INITIAL CD5 FOR FISP INSPECTION.
No product keyword matched
1Oct 27, 2026
BC Town Supermarket
NYC DOB building permits
11
Sign · install a business accessory sign reading C Town Fresh SUPERMARKET
No product keyword matched
1Oct 27, 2026
BTWIN GROUP ASSOCIATES INC
NYC DOB building permits
11
Antenna · New Antenna telecom Installation. Install (3) new antenna sectors consisting of (12 antennas, (6) RRH units, (2) GPS units on the roof. Install (2) cabinets on new platform with stairs on the roof. No change in use, egress or occupancy.
No product keyword matched
1Oct 27, 2026
BGREEN CEDAR MANAGEMENT
NYC DOB building permits
11
Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
No product keyword matched
2Oct 27, 2026
BThe White Rabbit Deli Cafe LLC
NYC DOB building permits
11
General Construction · Interior Fit-out for existing Deli shop, no change of use, no change of egress
No product keyword matched
1Oct 27, 2026
BMAXWELL HOTEL NYC
NYC DOB building permits
11
Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
1Oct 27, 2026
BFerrara Management Group
NYC DOB building permits
11
Structural · Repair of Undermined Partition Wall & Floor in Unit 1G
No product keyword matched
1Oct 27, 2026
BMacdougal Apartment Corp
NYC DOB building permits
11
Mechanical Systems · INSTALL NEW CHIMNEY AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
No product keyword matched
1Oct 27, 2026
BDOHMH
NYC DOB building permits
11
General Construction · INSTALL CHIMNEY LINER.
No product keyword matched
1Oct 27, 2026
BAkbar Builders LLC
NYC DOB building permits
11
General Construction · application filed to address WWP violations, remove existing illegal partitions and legalize 3 piece bathroom, washer & sink
No product keyword matched
1Oct 27, 2026
BLIMESTONE BUILDERS
NYC DOB building permits
11
General Construction · INTERIOR RENOVATION OF EXISTING 3-STORY BUILDING WITH BASEMENTAS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
No product keyword matched
1Oct 27, 2026
BLUCKY NOVA LLC
NYC DOB building permits
11
Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
No product keyword matched
1Oct 27, 2026
BNINTH REALTY LLC
NYC DOB building permits
11
Plumbing · Herewith filing for cap and removal of existing sink in cellar as per plans. No change in use, occupancy, or egress under this application. ALT 1 No Work application #123918644 and general construction fit out application #M07994051-I1.
No product keyword matched
1Oct 27, 2026
BGuyon Development LLC
NYC DOB building permits
11
Construction Fence · Temporary construction fence located around entire lot perimeter in Block 4297 Lot 1 - 247 Guyon Avenue. Also applies to future NB applications in Tentative Lot 1 and Tentative Lot 3).
No product keyword matched
1Oct 27, 2026
BGB DESIGN NY CORP
NYC DOB building permits
11
General Construction · INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
No product keyword matched
1Oct 27, 2026
BMushroom Property Managers LLC
NYC DOB building permits
11
Solar · Installation of solar system on the roof as per plan. No change in use, egress or occupancy
No product keyword matched
1Oct 27, 2026
BSOGO Design Build
NYC DOB building permits
11
General Construction · SELECTIVE INTERIOR RENOVATION OF KITCHEN, POWDER ROOM, AND DINING ROOM INCLUDING DEMOLITION, NEW TILE FLOORING, COUNTERTOPS, CABINETS, BACKSPLASH, PAINTING, LIGHTING, ELECTRICAL OUTLET, AND REINSTALLATION OF EXISTING PLUMBING FIXTURES IN UNIT 11C
No product keyword matched
1Oct 27, 2026
B1674 FARMS REALTY LLC
NYC DOB building permits
11
Construction Fence · Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched
1Oct 27, 2026
Showing 3,201–3,250 of 16,447
PreviousNext