Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Bayview Reentry Owner LLC NYC DOB building permits | 11 | Structural · FACADE OPENINGS IN PORTIONS OF MASONRY EXTERIOR WALL ON NORTH FACADE FOR CONSTRUCTION HOIST INSTALLATION AND TO ALLOW FOR ACCESS. No product keyword matched | 2 | Oct 27, 2026 |
| B | YANKEE MANAGEMENT COMPANY INC. |
| 11 |
General Construction · CONSTRUCTION OF A TENANT LAUNDRY ROOM IN CELLAR. No product keyword matched |
| 3 |
| Oct 27, 2026 |
| B | 28TH HIGHLINE ASSOCIATES, LLC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK FILING FOR A RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | ARGONAUT HOLDINGS, LLC NYC DOB building permits | 11 | Structural · ENGINEERED DRAWINGS FOR PARAPET STABILIZATION, BRICK STITCHING AND BRICK POINTING. No product keyword matched | 3 | Oct 27, 2026 |
| B | IBM CONSTRUCTION, LLC NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION AND COMBINATION OF UNITS 22 AND 24 AT 4TH FLOOR LEVEL AS PER L.L.77 OF 1968, NEW GENERAL CONSTRUCTION AND PLUMBING WORK. THERE IS NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 27, 2026 |
| B | KDS SAGAMORE RANGER NYC DOB building permits | 11 | Sprinklers · New electric water heater. New fixtures in bathrooms and pantry. Modify existing sprinkler system. Relocation of 10 existing heads, added 5 new heads. No product keyword matched | 7 | Oct 27, 2026 |
| B | DITMARS REAL ESTATE CONSULTANTS INC NYC DOB building permits | 11 | Plumbing · Filed to amend -S1 to Legalize existing gas fired appliances such as RTU's, water heaters, furnaces, unit heaters, and various commercial kitchen equipment. There is no change in use, occupancy, egress. No product keyword matched | 1 | Oct 27, 2026 |
| B | aish equties NYC DOB building permits | 11 | Plumbing · Application filed for all plumbing work. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 27, 2026 |
| B | PA BUILDERS, INC NYC DOB building permits | 11 | General Construction · AT 1ST FLOOR TENANT SPACE, INSTALLATION OF PARTITIONS, CEILINGS, LIGHTING, AND FINISHES AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Oct 27, 2026 |
| B | Promise Property LLC NYC DOB building permits | 11 | General Construction · RENOVATION OF MIXED USE BUILDING, INCLUDING REPLACEMENT OF FLOORING, WINDOW AND FRONT EXTERIOR BRICK VENEER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 27, 2026 |
| B | All Stars Project, Inc NYC DOB building permits | 11 | Sprinklers · SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST FL AND 1ST FL MEZZ. OF EXISTING THEATRE/OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | EMERALD MECHL SOLUTIONS I NYC DOB building permits | 11 | Plumbing · Replace existing plumbing fixtures in kind. No change to use, egress, or occupancy. No product keyword matched | 2 | Oct 27, 2026 |
| B | UNCLE PARK FLUSHING INC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 3 | Oct 27, 2026 |
| B | Forever 1667 NYC DOB building permits | 11 | Plumbing · APPLICATION FILING TO REMOVE AND REPLACE 1 LAV, 1 W/C & 1 TUB, 1 SINK & 1 STOVE AT 1ST FL AND INSTALL 1 LAV, 1 W/C, 1 SHOWER , 1 SLOPE SINK AND 1 WASHER AND 1 DRYER AT BSMT IN CONNECTION GC WORK TYPE AS PER PLAN. NIO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | AMDA, INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Oct 27, 2026 |
| B | HF Management NYC DOB building permits | 11 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 3 | Oct 27, 2026 |
| B | JMM 17TH STREET LLC NYC DOB building permits | 11 | Plumbing · RENOVATE EXISTING BASEMENT APARTMENT AND VESTIBULE AS PER PLANS ATTACHED, INCLUSIVE OF PLUMBING WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 3 | Oct 27, 2026 |
| B | HABITAT MANAGMENT NYC DOB building permits | 11 | General Construction · COMBINATION OF TWO ADJACENT APARTMENTS ON THE 4TH FLOOR OF A FOUR STORY APARTMENT BUILDING. NEW PARTITIONS, FINISHES, ELECTRICAL AND PLUMBING. NO CHANGE TO USE OR EGRESS. No product keyword matched | 2 | Oct 27, 2026 |
| B | YDJ Realty LLC NYC DOB building permits | 11 | Plumbing · PLUMBING REPAIR WORK IN CONJUNCTION TO ALTERATION JOB#Q01408940-I1 AND ADDRESS VIOLATIONS. No product keyword matched | 2 | Oct 27, 2026 |
| B | CELANO NYC DOB building permits | 11 | Plumbing · CAP & REMOVE ILLEGAL SINK, GAS STOVE. LEGALIZED 3PC BATHROOM AT CELLAR. REMEDY ECB VIOLATION#34153479J.34153478H,34151190J. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | LIN ZHU LLC NYC DOB building permits | 11 | Plumbing · FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | 11 WEST MANAGEMENT LLC NYC DOB building permits | 11 | Plumbing · MINOR PLUMBING WORK TO INSTALL WASHERS AND PEDICURE CHAIRS FOR A NEW TECHNICAL AND TRADE SCHOOL (USE GROUP: VI (6115) ON 4TH FLOOR. NO CHANGE IN USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 27, 2026 |
| B | The Town Hall Foundation Inc NYC DOB building permits | 11 | Sprinklers · Modification to existing sprinkler system and related piping as shown on drawings. No change to use, egress or occupancy. No product keyword matched | 2 | Oct 27, 2026 |
| B | Church of Our Lady of Mercy NYC DOB building permits | 11 | Plumbing · CONVERT EXISTING OIL BURNER WITH DUEL FUEL BURNER FOR EXISTING BOILER. EXISTING GAS LINE TO BE TESTED AND NEW PIPING AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 27, 2026 |
| B | 1616 PROPERTIES LLC NYC DOB building permits | 11 | General Construction · NO CHANGES TO USE, OCCUPANCY AND/OR EGRESS; PROPOSED BEAUTY SALON AT FIRST FLOOR - PARTITIONS, CEILING, STORE FRONT AND FINISHES. NOTE: TO BE FILED UNDER SEPARATE APPLICATION(S) - PLUMBING AND SIGN; UTILIZE/MODIFY AS NECESSARY EXISTNIG MECHANICAL SYSTEM. No product keyword matched | 2 | Oct 27, 2026 |
| B | MONROE COLLEGE NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 27, 2026 |
| B | ABC Plus NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT OF ROOF TOP SINGLE-PACKAGE HVAC UNIT. NO CHANGES TO OCCUPANCY, MEANS OF EGRESS, OR OCCUPANT LOAD. No product keyword matched | 1 | Oct 27, 2026 |
| B | OMNIBUILD CONSTRUCTION IN NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE No product keyword matched | 1 | Oct 27, 2026 |
| B | JACO MECHANICAL INC NYC DOB building permits | 11 | Mechanical Systems · Replacement of air conditioning units. No change in use egress and occupancy. No product keyword matched | 1 | Oct 27, 2026 |
| B | Summit mgmt NYC DOB building permits | 11 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | VK191 PROPERTY LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE FOR LOT #1 AND #2 W/ 160'-0 FRONTAGE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 3 | Oct 27, 2026 |
| B | G BUDDY INC. NYC DOB building permits | 11 | Plumbing · To file PL plumbing work in conjunction with DOB Now Build application job#S01036548. No change in use, egress or occupancy under this application. No product keyword matched | 1 | Oct 27, 2026 |
| B | MARATHON ASSET MANAGEMENT NYC DOB building permits | 11 | Suspended Scaffold · INDUSTRIAL ROPE ACCESS INITIAL CD5 FOR FISP INSPECTION. No product keyword matched | 1 | Oct 27, 2026 |
| B | C Town Supermarket NYC DOB building permits | 11 | Sign · install a business accessory sign reading C Town Fresh SUPERMARKET No product keyword matched | 1 | Oct 27, 2026 |
| B | TWIN GROUP ASSOCIATES INC NYC DOB building permits | 11 | Antenna · New Antenna telecom Installation. Install (3) new antenna sectors consisting of (12 antennas, (6) RRH units, (2) GPS units on the roof. Install (2) cabinets on new platform with stairs on the roof. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 27, 2026 |
| B | GREEN CEDAR MANAGEMENT NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 2 | Oct 27, 2026 |
| B | The White Rabbit Deli Cafe LLC NYC DOB building permits | 11 | General Construction · Interior Fit-out for existing Deli shop, no change of use, no change of egress No product keyword matched | 1 | Oct 27, 2026 |
| B | MAXWELL HOTEL NYC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 27, 2026 |
| B | Ferrara Management Group NYC DOB building permits | 11 | Structural · Repair of Undermined Partition Wall & Floor in Unit 1G No product keyword matched | 1 | Oct 27, 2026 |
| B | Macdougal Apartment Corp NYC DOB building permits | 11 | Mechanical Systems · INSTALL NEW CHIMNEY AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 27, 2026 |
| B | DOHMH NYC DOB building permits | 11 | General Construction · INSTALL CHIMNEY LINER. No product keyword matched | 1 | Oct 27, 2026 |
| B | Akbar Builders LLC NYC DOB building permits | 11 | General Construction · application filed to address WWP violations, remove existing illegal partitions and legalize 3 piece bathroom, washer & sink No product keyword matched | 1 | Oct 27, 2026 |
| B | LIMESTONE BUILDERS NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING 3-STORY BUILDING WITH BASEMENTAS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 27, 2026 |
| B | LUCKY NOVA LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY. No product keyword matched | 1 | Oct 27, 2026 |
| B | NINTH REALTY LLC NYC DOB building permits | 11 | Plumbing · Herewith filing for cap and removal of existing sink in cellar as per plans. No change in use, occupancy, or egress under this application. ALT 1 No Work application #123918644 and general construction fit out application #M07994051-I1. No product keyword matched | 1 | Oct 27, 2026 |
| B | Guyon Development LLC NYC DOB building permits | 11 | Construction Fence · Temporary construction fence located around entire lot perimeter in Block 4297 Lot 1 - 247 Guyon Avenue. Also applies to future NB applications in Tentative Lot 1 and Tentative Lot 3). No product keyword matched | 1 | Oct 27, 2026 |
| B | GB DESIGN NY CORP NYC DOB building permits | 11 | General Construction · INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 27, 2026 |
| B | Mushroom Property Managers LLC NYC DOB building permits | 11 | Solar · Installation of solar system on the roof as per plan. No change in use, egress or occupancy No product keyword matched | 1 | Oct 27, 2026 |
| B | SOGO Design Build NYC DOB building permits | 11 | General Construction · SELECTIVE INTERIOR RENOVATION OF KITCHEN, POWDER ROOM, AND DINING ROOM INCLUDING DEMOLITION, NEW TILE FLOORING, COUNTERTOPS, CABINETS, BACKSPLASH, PAINTING, LIGHTING, ELECTRICAL OUTLET, AND REINSTALLATION OF EXISTING PLUMBING FIXTURES IN UNIT 11C No product keyword matched | 1 | Oct 27, 2026 |
| B | 1674 FARMS REALTY LLC NYC DOB building permits | 11 | Construction Fence · Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 27, 2026 |