Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | WHITE PLAINS DEVELPMENT O NYC DOB building permits | 11 | Structural · STRUCTURAL DESIGN TO FACILITATE NEW FIVE (5) STORY MIXED USE BUILDING. TWENTY-ONE (21) DWELLING UNITS WITH COMMUNITY ON THE GROUND AND PARKING SPACES @ CELLAR. No product keyword matched | 1 | Oct 28, 2026 |
| B | RENOVA CONSTRUCTION* |
| 11 |
General Construction · REFURBISH EXISTING BUILDING No product keyword matched |
| 1 |
| Oct 28, 2026 |
| B | STEPPING STONE CONSTRUCT* NYC DOB building permits | 11 | Structural · Structural alterations to improve accessibility on the 1st floor. No change in use, Egress or Occupancy under this application. No product keyword matched | 1 | Oct 28, 2026 |
| B | 18TH HIGHLINE ASSOCIATES, LLC NYC DOB building permits | 11 | General Construction · General construction, removal of non-load-bearing partitions, and installation of new non-load-bearing partitions. No product keyword matched | 1 | Oct 28, 2026 |
| B | EMPIRE STATE DEVELOPMENT NYC DOB building permits | 11 | General Construction · Reconfiguration of front stoop and site steps. No product keyword matched | 1 | Oct 28, 2026 |
| B | Sunoco LP NYC DOB building permits | 11 | General Construction · LOADING RACK AND TANK PIPING MODIFICATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY No product keyword matched | 1 | Oct 28, 2026 |
| B | BARNAR COLLEGE NYC DOB building permits | 11 | General Construction · interior alteration to existing Barnard offices, addition of classroom use and occupancy. This is accessory to the college. No change in egress No product keyword matched | 1 | Oct 28, 2026 |
| B | PARKER MADISON PARTNERS, INC. NYC DOB building permits | 11 | Sprinklers · Sprinkler modifications No product keyword matched | 1 | Oct 28, 2026 |
| B | 150-12 12 Ave LLC NYC DOB building permits | 11 | Construction Fence · Install construction fence filed in conjunction with NB application Q01337920-I1 No product keyword matched | 2 | Oct 28, 2026 |
| B | CORONA 129 LLC NYC DOB building permits | 11 | General Construction · CONVERT COMMUNITY FACILITY SPACE INTO A DWELLING UNIT ON 2ND FLOOR. FILED TO COMPLY WITH ZR 54-53. TO OBTAIN NEW C OF O. No product keyword matched | 1 | Oct 28, 2026 |
| B | 6803 3rd LLC NYC DOB building permits | 11 | Mechanical Systems · Interior renovation of the existing commercial space on ground floor, New Deli space and Coffee shop, new commercial kitchen and a hood, new walking box, new condenser, no change in use, egress and occupancy. No product keyword matched | 1 | Oct 28, 2026 |
| B | CHICAGOLAND GEOTHERMAL LL NYC DOB building permits | 11 | Mechanical Systems · Install new geothermal HVAC system and modify existing exhaust system at bathroom and kitchen as per plan, there is no change in use, egress or occupancy. No product keyword matched | 1 | Oct 28, 2026 |
| B | DARYL ROTH PRODUCTIONS NYC DOB building permits | 11 | General Construction · Sidewalk Replacement as shown in filed drawings. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 28, 2026 |
| B | MRD ELECTRICAL SERVICES, INC. NYC DOB building permits | 11 | Mechanical Systems · INSTALL NEW MINI-SPLIT AIR-CONDITIONING SYSTEMAT APT#407 OF EXISTING 12-STORY BUILDING WITH MECHNICAL WORK ONLY AS PER PLANS FILED HEREWITH. . NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | JDSS PROPERTY LLC NYC DOB building permits | 11 | General Construction · COMBINE EXISTING TWO UNITS INTO ONE UNIT ON 2ND FLOOR.INTERIOR RENOVATION OF EXISTING TWO UNITS ON 3RD FLOOR. WORK INCLUDE TO ERECT NEW NON-STRUCTURAL PARTION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PLUMBING SCOPE WILL BE FILED SEPARATELY UNDER DOB NOW PL No product keyword matched | 1 | Oct 28, 2026 |
| B | HUBBNYC PROPERTIES NYC DOB building permits | 11 | General Construction · Renovation of an existing apartment bathroom and installation of a washing machine in accordance with the filed plans. Modify vestibule flooring slope as required to provide an accessible transition. No change to use, occupancy, or means of egress. No product keyword matched | 1 | Oct 28, 2026 |
| B | OLMSTEAD PROPERTIES, INC. NYC DOB building permits | 11 | General Construction · Interior renovation of existing office area, includes new non load bearing partitions, finishes, lighting, electrical, etc. No product keyword matched | 1 | Oct 28, 2026 |
| B | the easton foundation NYC DOB building permits | 11 | General Construction · This application is filed for the wall repair on the cellar level. No change in use, egress, or occupancy under this application. No product keyword matched | 1 | Oct 28, 2026 |
| B | MATAT LLC NYC DOB building permits | 11 | General Construction · REMOVAL OF TEMPORARY WOODEN PERGOLA (ROOF) STRUCTURE IN REAR YARD, TO RESOLVE VIOLATION #39190304M. NO CHANGE IN USE, OCCUPACY AND EGRESS. No product keyword matched | 1 | Oct 28, 2026 |
| B | NICHIBI ORGANIZATION INC NYC DOB building permits | 11 | General Construction · NEW AND MODIFIED PARTITIONS, NEW FINISHES, MILLWORK, PLUMBING AND ELECTRICAL. No product keyword matched | 1 | Oct 28, 2026 |
| B | WR BRONX REALTY CORP NYC DOB building permits | 11 | General Construction · Legalization of storefront replacement in response to ECB violation number 39188942Y. No change to occupancy use or egress. No product keyword matched | 1 | Oct 28, 2026 |
| B | Atiles NYC DOB building permits | 11 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | POWER AIRCONDITIONING CORP NYC DOB building permits | 11 | Construction Fence · Install construction fence as per plans filed No product keyword matched | 1 | Oct 28, 2026 |
| B | Hollis farmers market inc NYC DOB building permits | 11 | Plumbing · APPLICATION FILING 1 THREE COMPARTMENT SINK, 1 FLOOR DRAIN WITH GREASE TRAP FOR EXISTING STORE AS PER PLAN AT 1ST FLOOR IN CONNECTION JOB# 421961425. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | 2077 LLC NYC DOB building permits | 11 | Construction Fence · Temporary 8' High Construction Solid Fence No product keyword matched | 1 | Oct 28, 2026 |
| B | WHITE HILL RESTOR. INC NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR & FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 28, 2026 |
| B | L.H. KRAMER INC NYC DOB building permits | 11 | General Construction · REPLACEMENT OF EXISTING SLATE ROOF & FRONT DOOR. NO CHANGE IN USE EGRESS, OR OCCUPANCY No product keyword matched | 1 | Oct 28, 2026 |
| B | KHLA TWO LLC DBA 546 SARATOGA AVE NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT ENTIRE NEW 7-STORY MIXED-USE BUILDING WITH (17) D.U. IN CONJUNCTION WITH JOB# B00561383. No product keyword matched | 1 | Oct 28, 2026 |
| B | S.NEZAJ REALTY LLC NYC DOB building permits | 11 | Plumbing · INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | ABSOLUTE ELEC'L CONTRG OF NYC DOB electrical permits | 11 | LL88 Lighting Upgrade No product keyword matched | 20 | Oct 28, 2026 |
| B | STANCO SYSTEM ELEC'L CONT NYC DOB electrical permits | 11 | PS211X TEMP POWER FOR TRAILERS No product keyword matched | 25 | Oct 28, 2026 |
| B | LIMITLESS ELECT RESOURCES NYC DOB electrical permits | 11 | INSTALL ILLUMINATED WALL SIGN (NAN XIANG) M01472392 No product keyword matched | 25 | Oct 28, 2026 |
| B | QUEUE ELEC'L CONTRS, INC NYC DOB electrical permits | 11 | Temporary light & power from existing panels No product keyword matched | 7 | Oct 28, 2026 |
| B | STEADFAST ELECTL CONT COR NYC DOB electrical permits | 11 | General wiring for power and lighting to comply with ECB Violation #39196834R No product keyword matched | 4 | Oct 28, 2026 |
| B | ETECH ELECTRICAL LLC NYC DOB electrical permits | 11 | Apt 5B Add and install 2 wall sconces in the living room No product keyword matched | 5 | Oct 28, 2026 |
| B | VLASHAVA ELEC CONTR'G COR NYC DOB electrical permits | 11 | KITCHEN ELECTRICAL STOVE OUTLETS 9 APARTMENTS No product keyword matched | 7 | Oct 28, 2026 |
| B | ELMAC ELECTRIC INC. NYC DOB electrical permits | 11 | Apartment 21. General wiring for receptacles and lighting in apartment renovation. Extend existing 40 Amp riser from existing fuse box in kitchen into new panel in hallway. No product keyword matched | 8 | Oct 28, 2026 |
| B | M.R. ELEC'L SERVICE LLC NYC DOB electrical permits | 11 | Reinstating B153006 No product keyword matched | 8 | Oct 28, 2026 |
| B | CROSS BROTHERS ELECTRIC NYC DOB electrical permits | 11 | Replacement of Service Grounding system and Replacement of GFCI from PLP panel and installation of Surge protection in PLP panel. No product keyword matched | 4 | Oct 28, 2026 |
| B | LTC ELEC'L CONTR'G LLC NYC DOB electrical permits | 11 | New General Wiring for new panel, branch circuits and electric stove, riser existing in apartment 1C. We are taking over electrical permit #M01278045-I1-EL. No product keyword matched | 4 | Oct 28, 2026 |
| B | CAPONE ELECL CONTRS CORP NYC DOB electrical permits | 11 | HARLEM RIVER HOUSES - BLDG 7 - REINSTATEMENT OF ELECTRICAL APPLICATION #Z062102 // GENERAL WIRING - INSTALLATION OF SECURITY LIGHTS FOR OUTSIDE No product keyword matched | 45 | Oct 28, 2026 |
| B | MILAD CONTRACTING CORP. NYC DOB electrical permits | 11 | Temporary Mobile Heating Unit Connection No product keyword matched | 7 | Oct 28, 2026 |
| B | MNBC ELECTRICAL CORP NYC DOB electrical permits | 11 | Install 30amp disconnect and branch circuit for stage lift and replace existing receptacle for water fountain. No product keyword matched | 7 | Oct 28, 2026 |
| B | DUNRITE ELECTRICAL CORP NYC DOB electrical permits | 11 | New commercial meter No product keyword matched | 1 | Oct 28, 2026 |
| B | I&E ELECTRIC, INC NYC DOB electrical permits | 11 | General wiring of apartment 4F No product keyword matched | 8 | Oct 28, 2026 |
| B | K-WATTS ELECTRIC LLC NYC DOB electrical permits | 11 | Work in Apt 14H- New Bathroom, New kitchen appliances, Smoke Detectors, Panel gut replacement feeder to remain No product keyword matched | 2 | Oct 28, 2026 |
| B | ENNELL GRP ELECTRIC CORP NYC DOB electrical permits | 11 | 31st Floor - Restrooms No product keyword matched | 14 | Oct 28, 2026 |
| B | HYSA ELECTRICIANS CORP NYC DOB electrical permits | 11 | installing HVAC units No product keyword matched | 2 | Oct 28, 2026 |
| B | AUTOMATION ELECTRIC LLC NYC DOB electrical permits | 11 | power for Mini-split AC unit complaint number3A75137 No product keyword matched | 3 | Oct 28, 2026 |
| B | A&E ELECTRICAL SYSTEMS CO NYC DOB electrical permits | 11 | New service, branch circuits, wiring devices and light fixtures. No product keyword matched | 7 | Oct 28, 2026 |