Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | STUDIO WOODMAN LLC NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH FIRST FLOOR TENANT ALTERATION AND STOREFRONT MODIFICATIONS. No product keyword matched | 2 | Oct 28, 2026 |
| B | MR1 Development LLC NYC DOB building permits |
| 11 |
Construction Fence · APPLICATION FILED TO ERECT AN 8.0 FOOT HIGH PLYWOOD CONSTRUCTION FENCE AROUND PERIMETER OF PROPERTY No product keyword matched |
| 11 |
| Oct 28, 2026 |
| B | VM 4401 LLC NYC DOB building permits | 11 | Structural · Structural Work as shown on plans submitted herewith. No change to egress use or occupancy as of right. No product keyword matched | 1 | Oct 28, 2026 |
| B | CO ADAPTIVE BUILDING LLC NYC DOB building permits | 11 | General Construction · MINOR INTERIOR ALTERATION OF EXISTING BUILDING TO INCLUDE THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FIXTURES, AND DOORS. ALL WORK AS INDICATED ON PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Oct 28, 2026 |
| B | FTIC HOME IMPROVEMENT INC NYC DOB building permits | 11 | Structural · CONVERSION OF THE EXISTING ONE & HALF STORY ONE-FAMILY BUILDING INTO A TWO-STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 3 | Oct 28, 2026 |
| B | N.Y. PREFERRED DEVELOPMEN NYC DOB building permits | 11 | Full Demolition · THIS IS A FULL DEMOLITION OF 1 STORY CONCRETE BLOCK 3 CARS GARAGE. FULL HAND DEMOLITION. NO EQUIPMENT TO BE USED. FULL HOUSE DEMO FILED UNDER JOB NO.Q01377705. FENCE FILED UNDER SEPARATE APPLICATION. No product keyword matched | 7 | Oct 28, 2026 |
| B | HI-TECH PLUMBING & HEATING LLC NYC DOB building permits | 11 | Plumbing · PLUMBING APPLICATION FILED IN CONJUNCTION WITH INTERIOR RENOVATION APPLICATION. MINOR PLUMBING MODIFICATIONS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 3 | Oct 28, 2026 |
| B | ACCORD CONTR AND MGMT COR NYC DOB building permits | 11 | Mechanical Systems · Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy No product keyword matched | 2 | Oct 28, 2026 |
| B | HH BUILDING CONSULTING NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS PER PLAN No product keyword matched | 4 | Oct 28, 2026 |
| B | 230FA LLC NYC DOB building permits | 11 | General Construction · Installation of temporary metal frame, clear vinyl, geodesic domes, 18' ,15' ,13' dia, no alt to exist structures for Restaurant Rooftop Seasonal Events. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. No product keyword matched | 1 | Oct 28, 2026 |
| B | KARO PROPERTIES LLC NYC DOB building permits | 11 | Structural · interior renovation of existing three stories and cellar three family brick building. New drywall partitions and plumbing fixtures as per plans. No change in use egress or occupancy. Filed hereby to answer ECB violations #39115095P and 39115094N. No product keyword matched | 3 | Oct 28, 2026 |
| B | 255 WEST END AVENUE OWNERS CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER EMERGENCY LETTER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Oct 28, 2026 |
| B | V & M DRAIN CLEANING INC NYC DOB building permits | 11 | Plumbing · application filed for the installation of a new yard drain and sump pump as indicated on plans submitted herewith. No product keyword matched | 2 | Oct 28, 2026 |
| B | Rockefeller Group/Barclays NYC DOB building permits | 11 | General Construction · Hereby filing demolition of the space including all furnishings, finishes, interior framing and abandoned fit-out services. as shown on plans filed herewith. No change to use, occupancy or egress. No product keyword matched | 16 | Oct 28, 2026 |
| B | BEST MATCH CORPORATION NYC DOB building permits | 11 | General Construction · HEREWITH TO FILE ALTERATION TYPE ONE IN ORDER TO DO ERECT INTERIOR PARTITIONS & STAIRS. TO DO PLUMBING WORK UNDER SUBSEQUENT DOB NOW BUILD APPLICATION, AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 10 | Oct 28, 2026 |
| B | PROPERTIES 360 CORP NYC DOB building permits | 11 | Mechanical Systems · APPLICATION FILED TO INSTALL KITCHEN EXHAUST SYSTEM (HOOD,DUCTWORK, MAKE-UP FAN AND EXHAUST FAN) FOR EXISTING COMMERCIALSPACE AT FIRST FLOOR AS PER PLANS. FIRE SUPPRESSION SYSTEM FILEDSEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OROCCUPANC No product keyword matched | 1 | Oct 28, 2026 |
| B | SANTANDER BANK NYC DOB building permits | 11 | Mechanical Systems · HVAC unit replacement. Existing ductwork to remain. No change in use egress and occupancy. No product keyword matched | 1 | Oct 28, 2026 |
| B | Sovereign Partners NYC DOB building permits | 11 | Sprinklers · MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 6 | Oct 28, 2026 |
| B | R S & C ASSOCIATES INC NYC DOB building permits | 11 | General Construction · RENOVATION OF A THIRD FLOOR THREE-BEDROOM APARTMENT REPLACING THE KITCHEN & THREE BATHROOMS. FACADE WORK PROPOSED TO CREATE A NEW WINDOW OPENING. MINOR NON-BEARING PARTITION WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Oct 28, 2026 |
| B | BTN Food Corp NYC DOB building permits | 11 | General Construction · Renovation of an existing commercial store U.G. 6 at the 1st floor. No change in use, egress or occupancy under this application. No product keyword matched | 1 | Oct 28, 2026 |
| B | 30 REMSEN STREET APARTMENTS CORPORA NYC DOB building permits | 11 | General Construction · Minor interior alterations to Apartment #1A as per plans submitted herewith. Architectural work only; all other trade(s) to be filed under their own DoB NOW application(s). No change of use, egress, or occupancy proposed under this application. No product keyword matched | 1 | Oct 28, 2026 |
| B | THE MARY LOUIS ACADEMY NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTINO FENCE No product keyword matched | 1 | Oct 28, 2026 |
| B | FIRST COUNTY RE LLC NYC DOB building permits | 11 | Plumbing · FILING PLUMBING WORK OF MEDICAL OFFICE ON 2ND FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 28, 2026 |
| B | 486 FIRST HOLDINGS NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PV SYSTEM ON EXISTING ROOFTOP PERGOLA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | DOJO LIC HOLDINGS, LLC NYC DOB building permits | 11 | Structural · Installation of temp seasonal tents, no alteration to exist structures for Greats of Craft. Property is responsible to monitor site safety & implement HWAP. All production equipment removed upon season completion. No change in use , egress or occupancy. No product keyword matched | 1 | Oct 28, 2026 |
| B | DISALVO CONTRACTING LLC NYC DOB building permits | 11 | General Construction · Interior renovation existing one-family townhouse, including non-bearing partitions, doors, ceilings, finishes, millwork & convenience stair between the 2nd & 3rd floors. Structural work under subsequent application. No change to use, occupancy or egress. No product keyword matched | 3 | Oct 28, 2026 |
| B | Master 2 Plumbing & Heating, Inc. NYC DOB building permits | 11 | Sprinklers · Herewith filing for the installation, relocation and replacement of sprinklers, as per plans submitted. There is no change to use, egress or occupancy. No product keyword matched | 4 | Oct 28, 2026 |
| B | Empire State Property Management NYC DOB building permits | 11 | General Construction · Facade repairs, partial parapet reconstruction, coping stones, balcony repairs to include scrape, prime, and paint steel, and stucco repairs. Caulking of windows. No product keyword matched | 4 | Oct 28, 2026 |
| B | PRENDI GROUP GC LLC NYC DOB building permits | 11 | General Construction · MINOR INTERIOR RENOVATION TO REPAIR DAMAGE TO APARTMENT 1C AND COSMETICALLY RENOVATE COMMON AREAS. ADDRESS VIOLATIONS: 39195229Y; 34011073X. NO CHANGE IN UES, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | Kapps Realty LLC NYC DOB building permits | 11 | Plumbing · Plumbing work for vertical extension of existing commercial building (Associated with Alt CO Job Q01346647) No product keyword matched | 5 | Oct 28, 2026 |
| B | T&H ROOSEVELT REALTY LLC. NYC DOB building permits | 11 | General Construction · Replace the entry door. Platform and railing addition. No zoning, egress, or occupancy changes. No product keyword matched | 1 | Oct 28, 2026 |
| B | COMMUNITY RESOURCES NYC DOB building permits | 11 | Plumbing · PLUMBING WORK AS PER PLANS, NEW SPRINKLER HEAD IN EXISTING LAUNDRY ROOM FROM EXISTING DOMESTIC RISER. No product keyword matched | 3 | Oct 28, 2026 |
| B | OTC PLUMBING CORP NYC DOB building permits | 11 | Sprinklers · SUBSEQUENT FILING OF SPRINKLER WORK AS PER PLANS IN CONJUNCTION WITH NB JOB #B01012889. No product keyword matched | 4 | Oct 28, 2026 |
| B | 305 SOUTH GREENLEAF AVE NYC DOB building permits | 11 | Plumbing · PLUMBING for 1 family house renovation No product keyword matched | 2 | Oct 28, 2026 |
| B | OKADA ACQUISITION COMPANY NYC DOB building permits | 11 | Mechanical Systems · mechanical work throughout commercial space of building, there is no change in use, egress or occupancy filed under this application. No product keyword matched | 2 | Oct 28, 2026 |
| B | The Grand One at Skyview Parc NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING WORK ON 13TH FLOOR UNIT # 19N OF AN EXIST 17 STORY MIXED USE BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 2 | Oct 28, 2026 |
| B | Dry Harbor Properties LLC NYC DOB building permits | 11 | Plumbing · HEREBY FILING PLUMBING WORK AT EXISTING COMMERCIAL SPACES AT CELLAR AND 1ST FLOOR DUE TO FIRE DAMAGE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED APPLICATIONS - Q01324543 & Q01324554 No product keyword matched | 2 | Oct 28, 2026 |
| B | BROOKLYN URBAN RETAIL PARTNERS NYC DOB building permits | 11 | Plumbing · RELOCATION OF EXISITING COLD WATER MAIN AND INSTALLATION OF NEW ELEVATOR SUMP PUMP, FILED IN CONJUNTION WITH GC APPLICATION No product keyword matched | 5 | Oct 28, 2026 |
| B | GREENWICH HOTEL NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL MODIFICATIONS IN CONJUNCTION WITH BOILER REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 2 | Oct 28, 2026 |
| B | CONSULATE GENERAL OF THE REPUBLIC O NYC DOB building permits | 11 | Protection and Mechanical Methods · Installation and use of the temporary shanty as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application No product keyword matched | 2 | Oct 28, 2026 |
| B | METRO 71, LLC DBA THE GYRO PROJECT NYC DOB building permits | 11 | General Construction · Interior and limited exterior Alteration to existing 1st Floor Commercial Space. No change to use, Eggress or Occupancy. No product keyword matched | 4 | Oct 28, 2026 |
| B | Fantastic Four 56 LLC NYC DOB building permits | 11 | Mechanical Systems · New Mechanical work per drawings. No product keyword matched | 2 | Oct 28, 2026 |
| B | MASJEED AL-HUDA INC. NYC DOB building permits | 11 | Construction Fence · proposing a construction fence No product keyword matched | 2 | Oct 28, 2026 |
| B | BRIGHTWAY ADVISORS NYC DOB building permits | 11 | Structural · Herewith filing for 2-story new building No product keyword matched | 2 | Oct 28, 2026 |
| B | STONEHENGE BUILDING SERV NYC DOB building permits | 11 | General Construction · General construction modifications taking place on the facade as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 2 | Oct 28, 2026 |
| B | DURST ORGANIZATION NYC DOB building permits | 11 | Plumbing · Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy. No product keyword matched | 8 | Oct 28, 2026 |
| B | DIRECT BUILDING MGMT NYC DOB building permits | 11 | Plumbing · RELOCATE EXISTING GAS METERS. No product keyword matched | 2 | Oct 28, 2026 |
| B | LIVING PROPHECY NYC DOB building permits | 11 | Support of Excavation · Support of excavation drawings for the installation for the new foundation system for the rear extension. No product keyword matched | 6 | Oct 28, 2026 |
| B | S-PLATFORM NYC DOB building permits | 11 | General Construction · REMOVAL OF EXISITNG PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 28, 2026 |
| B | Hayco Corp NYC DOB building permits | 11 | Boiler Equipment · REPLACE FUEL OIL TANK. No product keyword matched | 2 | Oct 28, 2026 |