Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,539
Tier S19
New this week163
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BG.P. MECHANICAL CORP
Austin issued construction permits, NYC DOB building permits
11
Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work replacement of like for like (same tonnage voltage) 10 ton split system and one 1.5 ton split system. We will be reusing all ductwork and all electrical on site.
No product keyword matched
2Oct 28, 2026
Seer chat
B
BOSTON PROPERTIES
NYC DOB building permits
11
General Construction · General construction associated with tenant interior alterations on floors 2-5, including critical infrastructure work in sub-cellar, basement, 1st and roof as per plans filed herewith. No changes in use, egress or occupancy.
No product keyword matched
54
Oct 28, 2026
BPENN SOUTH CAPITAL MANAGEMENT LLC
NYC DOB building permits
11
Plumbing · Plumbing work in conjunction with interior renovation @ existing commercial space. No change in Use, Occupancy & Egress.
No product keyword matched
5Oct 28, 2026
BP.H. WORKS INC
NYC DOB building permits
11
Plumbing · Installation of plumbing fixtures in first floor commercial space per plans.
No product keyword matched
7Oct 28, 2026
BBROADWAY WEST
NYC DOB building permits
11
Mechanical Systems · INSTALL REPLACEMENT HVAC ROOFTOP UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
No product keyword matched
5Oct 28, 2026
BCMP PIPING INC
NYC DOB building permits
11
Sprinklers · FILING HEREWITH SPRINKLER PLANS WORK TO INCLUDE ADDITION/MODIFICATION TO AN EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched
1Oct 28, 2026
BTHE DURST ORGANIZATION
NYC DOB building permits
11
Plumbing · Plumbing work for Cornell Expansion on 18th marketing floor (17th floor construction)
No product keyword matched
37Oct 28, 2026
BJEM REALTY
NYC DOB building permits
11
Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
5Oct 28, 2026
BMAROB MANAGEMENT CORP
NYC DOB building permits
11
Boiler Equipment · Remove existing gas fired Dynavent heaters from window and install a new wall mounted Navien 180E gas fired boiler in 4th floor utility closet. Install direct venting to terminate at rooftop and fresh air intake.
No product keyword matched
11Oct 28, 2026
BNORTHWELL HEALTH
NYC DOB building permits
11
Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
15Oct 28, 2026
B6024 14 AVE LLC
NYC DOB building permits
11
Construction Fence · Filing for construction fence.
No product keyword matched
3Oct 28, 2026
BEAST COAST MANAGEMENT LLC
NYC DOB building permits
11
Suspended Scaffold · Installation of suspended scaffold for facade work or inspection.
No product keyword matched
3Oct 28, 2026
BNYULH
NYC DOB building permits
11
General Construction · Concrete Facade & Parapet Repairs. No Change in egress, occupancy or use.
No product keyword matched
1Oct 28, 2026
BGraziano D. Giglio, DDS, PC
NYC DOB building permits
11
Plumbing · PLUMBING AND SPRINKLER WORK RELATED TO THE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON THE 12TH AND 14TH FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
3Oct 28, 2026
BTHOMAS F. CASH & SONS INC
NYC DOB building permits
11
Plumbing · SUBSEQUENT FILING FOR PL WORKTYPE ON LEAD APPLICATION WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF SINGLE FAMILY RESIDENCE.
No product keyword matched
20Oct 28, 2026
BMARTE DEVELOPMENT LLC
NYC DOB building permits
11
General Construction · APPLICATION #Q01330984-I1 FILE TO COMPLETED APPLICATION#ALT29-76 WHICH WAS APPROVED PERMIT ISSUE JOB COMPLETED INSPECTED BUT NOT SIGN-OFF
No product keyword matched
1Oct 28, 2026
BA. M. PLUMBING COMPANY
Austin issued construction permits, NYC DOB building permits
11
Plumbing · HEREWITH FILING PLUMBING IN CONJUNCTION WITH NB APPLICATION # B00786307
No product keyword matched
10Oct 28, 2026
B5TH MIDTOWN LLC
NYC DOB building permits
11
Structural · FACADE ON THE 6TH AVENUE TO BE REFRAMED AS PER DRAWIINGS. NOI CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
25Oct 28, 2026
BSTONE CORE SHELL LLC
NYC DOB building permits
11
Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
No product keyword matched
3Oct 28, 2026
BICER PROPERTIES
NYC DOB building permits
11
Plumbing · FIELD HEREWITH FOR PLUMBING & GAS WORK ON FLOOR 001 IN CONJUNCTION TO M01413135-I1. WORK INCLUDES CAP & REMOVAL OF EXISTING PLUMBING FIXTURES, NEW PLUMBING & GAS ROUGH-INS, AND INSTALLATION OF PROPOSED FIXTURES AS SHOWN ON PLAN.
No product keyword matched
2Oct 28, 2026
BNEWMARK KNIGHT FRANK
NYC DOB building permits
11
Sprinklers · Sprinkler plans filed herewith to show interior alteration within tenant space (Suite 11). Demo of exiting piping & sprinkler heads and Install new sprinkler heads & piping. No change to use, egress, or occupancy. In addition, temporary sprinkler system.
No product keyword matched
5Oct 28, 2026
BCITY LINE INTERIORS INC
NYC DOB building permits
11
General Construction · INTERIOR RENOVATION OF EXISTING APT 4ES ON THE 4TH FLOOR. DEMO AND CONSTRUCT NON BEARING INTERIOR PARTITIONS, FINISHES, AND CABINETRY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
3Oct 28, 2026
BNEW FAMILY HOMES & BUILDI
NYC DOB building permits
11
Construction Fence · APPLICATION FILED FOR TEMPORARY CONSTRACTION FENCE IN CONJUCTION WITH DOB NOW APLLICATION# Q07998473-I1
No product keyword matched
6Oct 28, 2026
BKALICO GROUP LLC
NYC DOB building permits
11
Plumbing · PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT #Q01429194-I1, AND TO ADDRESS OPEN OATH/ECB AND DOB VIOLATIONS, AS PER PLANS.
No product keyword matched
2Oct 28, 2026
BNEW LAND CONSTRUCTION NY
NYC DOB building permits
11
General Construction · Minor interior renovation for partition wall changes in the cellar to address the HRP Request for Corrective Action associated with Complaint No. 4A45364. No change to use, egress, or occupancy.
No product keyword matched
11Oct 28, 2026
BSALVATORE BASILE II INC.
NYC DOB building permits
11
Structural · ERECT MEZZANINE ON FIRST FLOOR. INSTALL PARTITIONS ON 1ST FLOOR AND MEZZANINE. CONVERT EXISTING WAREHOUSE TO GOLF SIMULATOR. AMEND CERTIFICATE OF OCCUPANCY.
No product keyword matched
2Oct 28, 2026
BCOS CONSTRUCTION INC
NYC DOB building permits
11
Mechanical Systems · CONVERT & ENLARGE EXISTING ONE FAMILY INTO TWO-FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
No product keyword matched
2Oct 28, 2026
BMORTAR GROUP
NYC DOB building permits
11
Construction Fence · TEMPORARY FENCE JOB FILED IN CONJUCTION WITH ALT B01378680-I1
No product keyword matched
10Oct 28, 2026
BSEAN COAKLEY P & H INC
NYC DOB building permits
11
Sprinklers · Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
No product keyword matched
2Oct 28, 2026
B6180 GRAND AVENUE ASSOCIATES LLC
NYC DOB building permits
11
Solar · INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
No product keyword matched
4Oct 28, 2026
BHanwha Q Cells America, Inc.
NYC DOB building permits
11
Structural · Installation of non-occupied utility blockhouse per ConEd Specifications
No product keyword matched
3Oct 28, 2026
BGEORGE BUTSIKARIS REALTY, INC
NYC DOB building permits
11
Structural · Repair facade CMU wall as shown on the drawings filed herewith.
No product keyword matched
6Oct 28, 2026
BNowodworski Foundation
NYC DOB building permits
11
General Construction · Job filed to show installation of temporary exhibit and pennants pursuant to ZR 22-232 as per plans filed herewith. No change in use, egress and occupancy.
No product keyword matched
1Oct 28, 2026
BCPMG CUSTOM HOME BUILDERS
NYC DOB building permits
11
Construction Fence · CONSTRUCTION FENCE
No product keyword matched
2Oct 28, 2026
BABC CONTRACTING AND RESTO
NYC DOB building permits
11
General Construction · 1.REMOVE ALL LOOSE OR DETERIORATED STUCCO AND APPLY NEW STUCCO AT FRONT FACADE OF THE BUILDING=75 SF2. REMOVE AND REINSTALL WINDOW CAULKING AT FRONT OF THE BUILDING=6 PCS3. RESTORE THE FRONT STEPS AS PER PLAN=30 SF
No product keyword matched
4Oct 28, 2026
BMUSEUM OF ARTS & DESIGN
NYC DOB building permits
11
Plumbing · DOMESTIC HOT WATER SYSTEM UPGRADES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
1Oct 28, 2026
BROYAL T&E LLC
NYC DOB building permits
11
Sprinklers · PROPOSED INSTALLATION OF A NEW PLUMBING AND SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # X01276772-I1 FOR A THREE-STORY WITH CELLAR THREE-FAMILY MASONRY BUILDING
No product keyword matched
10Oct 28, 2026
BCOLEMAN CONTRACTING CORP
NYC DOB building permits
11
General Construction · SELECT INTERIOR RENOVATION OF APT. 15A INCLUDING ONE EXISTING KITCHEN AND TWO EXISTING BATHROOMS . NO CHANGE IN USE,OCCUPANCY OR EGRESS.
No product keyword matched
1Oct 28, 2026
BWALLACE AVENUE CONST.LLC
NYC DOB building permits
11
Construction Fence · FILED HEREWITH; 8' CONSTRUCTION FENCE
No product keyword matched
53Oct 28, 2026
BBELLEROSE PLBG & HTG
NYC DOB building permits
11
Plumbing · Subsequent filing for plumbing installation in the cellar to address the HRP Request for Corrective Action associated with Complaint No. 4A45364. No change to use, egress, or occupancy.
No product keyword matched
3Oct 28, 2026
BA PLUS PLUMBING CORP
NYC DOB building permits
11
Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATON AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY
No product keyword matched
10Oct 28, 2026
BGINO LONGO
NYC DOB building permits
11
Plumbing · To replace, remove or install new plumbing fixtures as per plan.
No product keyword matched
2Oct 28, 2026
BBRUCHE MECHANICAL NY LLC
NYC DOB building permits
11
Plumbing · FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW ALT-CO NB APPLICATION # B00906703-I1.
No product keyword matched
2Oct 28, 2026
B675 GC LLC
NYC DOB building permits
11
Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD OVER SIDEWALK SHED AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
8Oct 28, 2026
BBEACH CHANNEL MEAT & PRODUCE CORP
NYC DOB building permits
11
Construction Fence · Install temporary construction fence along East Tremont Avenue and Belmont Avenue.
No product keyword matched
1Oct 28, 2026
B135-223 STREET LLC
NYC DOB building permits
11
Structural · CONVERSION OF THE EXIST. ONE & HALF STORY ONE-FAMILY BUILDING INTO A TWO-STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROP. VERT. & HOR. ENLARGEMENT. INT. RENO. AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILED TO RESOLVE ECB & DOB VIOLATIONS.
No product keyword matched
12Oct 28, 2026
BCS BRIDGE CORP
NYC DOB building permits
11
Sidewalk Shed · Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched
23Oct 28, 2026
BDK CONSTRUCTION ONE, CORP
NYC DOB building permits
11
General Construction · RELOCATE EXISTING DU FROM 2nd FLOOR TO BASEMENT, COMBINE 1st AND 2nd FLOOR AS ONE FAMILY AND GENERAL RENOVATION. EXISTING TWO DWELLING UNITS.
No product keyword matched
1Oct 28, 2026
B1937 CONTRACTING CO. INC
NYC DOB building permits
11
Sidewalk Shed · ERECT, MAINTAIN & DISMANTLE OF HEAVY DUTY SIDEWALK SHED PER DRAWINGS ATTACHED HEREWITH
No product keyword matched
2Oct 28, 2026
BGUARANTEED HOME IMPROVEME
NYC DOB building permits
11
General Construction · INSTALL NEW CHIMNEY LINER AND 1-HR. FIRE RATED BOILER ROOM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
No product keyword matched
7Oct 28, 2026
Showing 2,851–2,900 of 16,447
PreviousNext