Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | G.P. MECHANICAL CORP Austin issued construction permits, NYC DOB building permits | 11 | Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work replacement of like for like (same tonnage voltage) 10 ton split system and one 1.5 ton split system. We will be reusing all ductwork and all electrical on site. No product keyword matched | 2 | Oct 28, 2026 |
| BOSTON PROPERTIES NYC DOB building permits |
| 11 |
General Construction · General construction associated with tenant interior alterations on floors 2-5, including critical infrastructure work in sub-cellar, basement, 1st and roof as per plans filed herewith. No changes in use, egress or occupancy. No product keyword matched |
| 54 |
| Oct 28, 2026 |
| B | PENN SOUTH CAPITAL MANAGEMENT LLC NYC DOB building permits | 11 | Plumbing · Plumbing work in conjunction with interior renovation @ existing commercial space. No change in Use, Occupancy & Egress. No product keyword matched | 5 | Oct 28, 2026 |
| B | P.H. WORKS INC NYC DOB building permits | 11 | Plumbing · Installation of plumbing fixtures in first floor commercial space per plans. No product keyword matched | 7 | Oct 28, 2026 |
| B | BROADWAY WEST NYC DOB building permits | 11 | Mechanical Systems · INSTALL REPLACEMENT HVAC ROOFTOP UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 5 | Oct 28, 2026 |
| B | CMP PIPING INC NYC DOB building permits | 11 | Sprinklers · FILING HEREWITH SPRINKLER PLANS WORK TO INCLUDE ADDITION/MODIFICATION TO AN EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 28, 2026 |
| B | THE DURST ORGANIZATION NYC DOB building permits | 11 | Plumbing · Plumbing work for Cornell Expansion on 18th marketing floor (17th floor construction) No product keyword matched | 37 | Oct 28, 2026 |
| B | JEM REALTY NYC DOB building permits | 11 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 5 | Oct 28, 2026 |
| B | MAROB MANAGEMENT CORP NYC DOB building permits | 11 | Boiler Equipment · Remove existing gas fired Dynavent heaters from window and install a new wall mounted Navien 180E gas fired boiler in 4th floor utility closet. Install direct venting to terminate at rooftop and fresh air intake. No product keyword matched | 11 | Oct 28, 2026 |
| B | NORTHWELL HEALTH NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 15 | Oct 28, 2026 |
| B | 6024 14 AVE LLC NYC DOB building permits | 11 | Construction Fence · Filing for construction fence. No product keyword matched | 3 | Oct 28, 2026 |
| B | EAST COAST MANAGEMENT LLC NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 3 | Oct 28, 2026 |
| B | NYULH NYC DOB building permits | 11 | General Construction · Concrete Facade & Parapet Repairs. No Change in egress, occupancy or use. No product keyword matched | 1 | Oct 28, 2026 |
| B | Graziano D. Giglio, DDS, PC NYC DOB building permits | 11 | Plumbing · PLUMBING AND SPRINKLER WORK RELATED TO THE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON THE 12TH AND 14TH FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 28, 2026 |
| B | THOMAS F. CASH & SONS INC NYC DOB building permits | 11 | Plumbing · SUBSEQUENT FILING FOR PL WORKTYPE ON LEAD APPLICATION WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF SINGLE FAMILY RESIDENCE. No product keyword matched | 20 | Oct 28, 2026 |
| B | MARTE DEVELOPMENT LLC NYC DOB building permits | 11 | General Construction · APPLICATION #Q01330984-I1 FILE TO COMPLETED APPLICATION#ALT29-76 WHICH WAS APPROVED PERMIT ISSUE JOB COMPLETED INSPECTED BUT NOT SIGN-OFF No product keyword matched | 1 | Oct 28, 2026 |
| B | A. M. PLUMBING COMPANY Austin issued construction permits, NYC DOB building permits | 11 | Plumbing · HEREWITH FILING PLUMBING IN CONJUNCTION WITH NB APPLICATION # B00786307 No product keyword matched | 10 | Oct 28, 2026 |
| B | 5TH MIDTOWN LLC NYC DOB building permits | 11 | Structural · FACADE ON THE 6TH AVENUE TO BE REFRAMED AS PER DRAWIINGS. NOI CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 25 | Oct 28, 2026 |
| B | STONE CORE SHELL LLC NYC DOB building permits | 11 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 28, 2026 |
| B | ICER PROPERTIES NYC DOB building permits | 11 | Plumbing · FIELD HEREWITH FOR PLUMBING & GAS WORK ON FLOOR 001 IN CONJUNCTION TO M01413135-I1. WORK INCLUDES CAP & REMOVAL OF EXISTING PLUMBING FIXTURES, NEW PLUMBING & GAS ROUGH-INS, AND INSTALLATION OF PROPOSED FIXTURES AS SHOWN ON PLAN. No product keyword matched | 2 | Oct 28, 2026 |
| B | NEWMARK KNIGHT FRANK NYC DOB building permits | 11 | Sprinklers · Sprinkler plans filed herewith to show interior alteration within tenant space (Suite 11). Demo of exiting piping & sprinkler heads and Install new sprinkler heads & piping. No change to use, egress, or occupancy. In addition, temporary sprinkler system. No product keyword matched | 5 | Oct 28, 2026 |
| B | CITY LINE INTERIORS INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING APT 4ES ON THE 4TH FLOOR. DEMO AND CONSTRUCT NON BEARING INTERIOR PARTITIONS, FINISHES, AND CABINETRY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 28, 2026 |
| B | NEW FAMILY HOMES & BUILDI NYC DOB building permits | 11 | Construction Fence · APPLICATION FILED FOR TEMPORARY CONSTRACTION FENCE IN CONJUCTION WITH DOB NOW APLLICATION# Q07998473-I1 No product keyword matched | 6 | Oct 28, 2026 |
| B | KALICO GROUP LLC NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT #Q01429194-I1, AND TO ADDRESS OPEN OATH/ECB AND DOB VIOLATIONS, AS PER PLANS. No product keyword matched | 2 | Oct 28, 2026 |
| B | NEW LAND CONSTRUCTION NY NYC DOB building permits | 11 | General Construction · Minor interior renovation for partition wall changes in the cellar to address the HRP Request for Corrective Action associated with Complaint No. 4A45364. No change to use, egress, or occupancy. No product keyword matched | 11 | Oct 28, 2026 |
| B | SALVATORE BASILE II INC. NYC DOB building permits | 11 | Structural · ERECT MEZZANINE ON FIRST FLOOR. INSTALL PARTITIONS ON 1ST FLOOR AND MEZZANINE. CONVERT EXISTING WAREHOUSE TO GOLF SIMULATOR. AMEND CERTIFICATE OF OCCUPANCY. No product keyword matched | 2 | Oct 28, 2026 |
| B | COS CONSTRUCTION INC NYC DOB building permits | 11 | Mechanical Systems · CONVERT & ENLARGE EXISTING ONE FAMILY INTO TWO-FAMILY DWELLING UNITS. OBTAIN NEW C OF O. No product keyword matched | 2 | Oct 28, 2026 |
| B | MORTAR GROUP NYC DOB building permits | 11 | Construction Fence · TEMPORARY FENCE JOB FILED IN CONJUCTION WITH ALT B01378680-I1 No product keyword matched | 10 | Oct 28, 2026 |
| B | SEAN COAKLEY P & H INC NYC DOB building permits | 11 | Sprinklers · Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 28, 2026 |
| B | 6180 GRAND AVENUE ASSOCIATES LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY. No product keyword matched | 4 | Oct 28, 2026 |
| B | Hanwha Q Cells America, Inc. NYC DOB building permits | 11 | Structural · Installation of non-occupied utility blockhouse per ConEd Specifications No product keyword matched | 3 | Oct 28, 2026 |
| B | GEORGE BUTSIKARIS REALTY, INC NYC DOB building permits | 11 | Structural · Repair facade CMU wall as shown on the drawings filed herewith. No product keyword matched | 6 | Oct 28, 2026 |
| B | Nowodworski Foundation NYC DOB building permits | 11 | General Construction · Job filed to show installation of temporary exhibit and pennants pursuant to ZR 22-232 as per plans filed herewith. No change in use, egress and occupancy. No product keyword matched | 1 | Oct 28, 2026 |
| B | CPMG CUSTOM HOME BUILDERS NYC DOB building permits | 11 | Construction Fence · CONSTRUCTION FENCE No product keyword matched | 2 | Oct 28, 2026 |
| B | ABC CONTRACTING AND RESTO NYC DOB building permits | 11 | General Construction · 1.REMOVE ALL LOOSE OR DETERIORATED STUCCO AND APPLY NEW STUCCO AT FRONT FACADE OF THE BUILDING=75 SF2. REMOVE AND REINSTALL WINDOW CAULKING AT FRONT OF THE BUILDING=6 PCS3. RESTORE THE FRONT STEPS AS PER PLAN=30 SF No product keyword matched | 4 | Oct 28, 2026 |
| B | MUSEUM OF ARTS & DESIGN NYC DOB building permits | 11 | Plumbing · DOMESTIC HOT WATER SYSTEM UPGRADES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 28, 2026 |
| B | ROYAL T&E LLC NYC DOB building permits | 11 | Sprinklers · PROPOSED INSTALLATION OF A NEW PLUMBING AND SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # X01276772-I1 FOR A THREE-STORY WITH CELLAR THREE-FAMILY MASONRY BUILDING No product keyword matched | 10 | Oct 28, 2026 |
| B | COLEMAN CONTRACTING CORP NYC DOB building permits | 11 | General Construction · SELECT INTERIOR RENOVATION OF APT. 15A INCLUDING ONE EXISTING KITCHEN AND TWO EXISTING BATHROOMS . NO CHANGE IN USE,OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 28, 2026 |
| B | WALLACE AVENUE CONST.LLC NYC DOB building permits | 11 | Construction Fence · FILED HEREWITH; 8' CONSTRUCTION FENCE No product keyword matched | 53 | Oct 28, 2026 |
| B | BELLEROSE PLBG & HTG NYC DOB building permits | 11 | Plumbing · Subsequent filing for plumbing installation in the cellar to address the HRP Request for Corrective Action associated with Complaint No. 4A45364. No change to use, egress, or occupancy. No product keyword matched | 3 | Oct 28, 2026 |
| B | A PLUS PLUMBING CORP NYC DOB building permits | 11 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATON AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 10 | Oct 28, 2026 |
| B | GINO LONGO NYC DOB building permits | 11 | Plumbing · To replace, remove or install new plumbing fixtures as per plan. No product keyword matched | 2 | Oct 28, 2026 |
| B | BRUCHE MECHANICAL NY LLC NYC DOB building permits | 11 | Plumbing · FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW ALT-CO NB APPLICATION # B00906703-I1. No product keyword matched | 2 | Oct 28, 2026 |
| B | 675 GC LLC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD OVER SIDEWALK SHED AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 8 | Oct 28, 2026 |
| B | BEACH CHANNEL MEAT & PRODUCE CORP NYC DOB building permits | 11 | Construction Fence · Install temporary construction fence along East Tremont Avenue and Belmont Avenue. No product keyword matched | 1 | Oct 28, 2026 |
| B | 135-223 STREET LLC NYC DOB building permits | 11 | Structural · CONVERSION OF THE EXIST. ONE & HALF STORY ONE-FAMILY BUILDING INTO A TWO-STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROP. VERT. & HOR. ENLARGEMENT. INT. RENO. AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. FILED TO RESOLVE ECB & DOB VIOLATIONS. No product keyword matched | 12 | Oct 28, 2026 |
| B | CS BRIDGE CORP NYC DOB building permits | 11 | Sidewalk Shed · Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 23 | Oct 28, 2026 |
| B | DK CONSTRUCTION ONE, CORP NYC DOB building permits | 11 | General Construction · RELOCATE EXISTING DU FROM 2nd FLOOR TO BASEMENT, COMBINE 1st AND 2nd FLOOR AS ONE FAMILY AND GENERAL RENOVATION. EXISTING TWO DWELLING UNITS. No product keyword matched | 1 | Oct 28, 2026 |
| B | 1937 CONTRACTING CO. INC NYC DOB building permits | 11 | Sidewalk Shed · ERECT, MAINTAIN & DISMANTLE OF HEAVY DUTY SIDEWALK SHED PER DRAWINGS ATTACHED HEREWITH No product keyword matched | 2 | Oct 28, 2026 |
| B | GUARANTEED HOME IMPROVEME NYC DOB building permits | 11 | General Construction · INSTALL NEW CHIMNEY LINER AND 1-HR. FIRE RATED BOILER ROOM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 7 | Oct 28, 2026 |