Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | HUDSON MERIDIAN CONSTRUCT NYC DOB building permits | 11 | Construction Fence · Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Oct 29, 2026 |
| B |
| 11 |
Boiler Equipment · INSTALLATION OF ONE (1) NEW GAS BOILER. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 3 |
| Oct 29, 2026 |
| B | PARSONS CONSTRUCTION INC NYC DOB building permits | 11 | Plumbing · Install new plumbing fixtures, electric hot water heaters, and electric stoves. Install the fire sprinkler system as per the drawings filed herewith. There will be no change in egress, use, or occupancy under this application. No product keyword matched | 6 | Oct 29, 2026 |
| B | BEK PLBG & HTG LLC NYC DOB building permits | 11 | Plumbing · MODIFICATION TO EXISTING PLUMBING INCLUDING INSTALLATION OF PLUMBING FIXTURESWITH ASSOCIATED PIPING INCONJUNCTION WITH GENERALCONSTRUCTION APPLICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 29, 2026 |
| B | BUILD TECH CONSTRUCTION C NYC DOB building permits | 11 | General Construction · REMOVE ILLEGAL DWELLING AT CELLAR TO CORRECT ECB VIOLATIONS 11J AND 02H. ALL ARCHITECTURAL AND ZONING CONTROL IS GOVERNED BY HARDING PARK HOME OWNERS ASSOCIATION INC. AS PER DECLARATION REEL 482 PAGE 1312 OF 9/8/1982. No product keyword matched | 5 | Oct 29, 2026 |
| B | BROADWAY PT 1710 LLC NYC DOB building permits | 11 | Plumbing · Installation of plumbing system as per plans filed herewith. No product keyword matched | 1 | Oct 29, 2026 |
| B | PUNIA AND MARX NYC DOB building permits | 11 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE INSPECTION AT 7259 SHORE ROAD, BROOKLYN, NY 11209 No product keyword matched | 3 | Oct 29, 2026 |
| B | EAST SIDE INTERIORS INC NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR MODIFICATION INCLUDING THE MODIFICATION OF THE KITCHEN AND ONE BATHROOM, NEW ELECTRIC VENT-LESS W/D AND FINISH MODIFICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED IN THIS APPLICATION No product keyword matched | 1 | Oct 29, 2026 |
| B | LEVEL UP REMODELING INC NYC DOB building permits | 11 | General Construction · New Alt 2 for General Construction work to be performed for apartment #10 on the 10th floor. Subsequent Plumbing Application to be filed. All in accordance with submitted plans. No changes to use, egress, or occupancy under this application. No product keyword matched | 3 | Oct 29, 2026 |
| B | ACTIVE SIGNS INC NYC DOB building permits | 11 | Sign · ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON STRUCTURE READING BURLINGTON DEALS. BRANDS. WOW! REPLACING EXISTING BURLINGTON SIGN #Q00545054. No product keyword matched | 2 | Oct 29, 2026 |
| B | PROCORE MECHANICAL CORP NYC DOB building permits | 11 | Plumbing · MODIFIED KITCHEN AND TWO BATHROOMS, ADD PANTRY SINK AND LAUNDRY ROOM No product keyword matched | 4 | Oct 29, 2026 |
| B | PARK PREMIUM ENTERPRISES NYC DOB building permits | 11 | Construction Fence · CONSTRUCTION FENCE FILED HEREWITH No product keyword matched | 1 | Oct 29, 2026 |
| B | VPNY GENERAL CONSTRUCTION NYC DOB building permits | 11 | Construction Fence · Install construction fence . No product keyword matched | 1 | Oct 29, 2026 |
| B | LINCOLN CENTER FOR THE PERFORMING A NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 16 | Oct 29, 2026 |
| B | sr4736 NYC DOB building permits | 11 | Sidewalk Shed · test No product keyword matched | 4 | Oct 29, 2026 |
| B | THE CASA GROUP NYC DOB building permits | 11 | Plumbing · DISCONNECTION OF EXISTING PIPING FROM EXISTING BOILER. No product keyword matched | 5 | Oct 29, 2026 |
| B | FOLOR INC NYC DOB building permits | 11 | Mechanical Systems · Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. No product keyword matched | 4 | Oct 29, 2026 |
| B | BARONE STEEL INC NYC DOB building permits | 11 | Protection and Mechanical Methods · Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 4 | Oct 29, 2026 |
| B | HIGHLAND PLUMBING LLC NYC DOB building permits | 11 | Plumbing · Plumbing work application filed in conjunction with New Building. New Building filed under DOB Now application#: X00657118-I1 No product keyword matched | 4 | Oct 29, 2026 |
| B | DIRECT MANAGEMENT CORP. NYC DOB building permits | 11 | General Construction · Leak repairs to parapets as per plans. No change in egress, occupancy, or use. No product keyword matched | 1 | Oct 29, 2026 |
| B | E&C Management NYC DOB building permits | 11 | Plumbing · Replace plumbing fixtures on the 5th floor. No change to use, egress or occupancy No product keyword matched | 1 | Oct 29, 2026 |
| B | Nelson Capital Associates LLC NYC DOB building permits | 11 | Plumbing · BUILDING MAIN SEWER LINE AS PER DEP APPROVED SITE CONNECTION, DOB INSPECTION OSP FOR SEWER STEEL SLEEVE THROUGH FOUNDATION WALL No product keyword matched | 5 | Oct 29, 2026 |
| B | NORTH RIVER COMPANY LLC NYC DOB building permits | 11 | General Construction · Filing herewith Alteration-CO to amend Final CO at 2nd floor - scope is specific to dividing 1 suite/tenant of the overall total floor occupancy (5 existing increased to 6 for floor), with partitions and finishes as per plans. No product keyword matched | 3 | Oct 29, 2026 |
| B | RESTORE RITE NY CORP NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION OF EXISTING TWO FAMILY HOUSE TO REPAIR FIRE DAMAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 3 | Oct 29, 2026 |
| B | FORTI PLAZA LLC NYC DOB building permits | 11 | Structural · STRUCTURAL FILING IN CONJUNCTION WITH NB 210180855 No product keyword matched | 2 | Oct 29, 2026 |
| B | R&R NYC DOB building permits | 11 | Plumbing · PLUMBING WORK OF EXISTING 6-DWELLING MIXED-USE BUILDING ON 3RD, 4TH & 5TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Oct 29, 2026 |
| B | BANNER DEVELOPMENT CORP NYC DOB building permits | 11 | Construction Fence · TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE SITE FOR FUTURE CONSTRUCTION. No product keyword matched | 1 | Oct 29, 2026 |
| B | MILESTONE EQUITIES NYC DOB building permits | 11 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 29, 2026 |
| B | W L R ASSOCIATES LLC NYC DOB building permits | 11 | General Construction · NEW 1-STORY DETACHED GARAGE. OBTAIN A NEW C OF O. No product keyword matched | 7 | Oct 29, 2026 |
| B | 236 PROSPECT MARKET LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK TYPE TO BE FILED IN CONJUNCTION WITH GC JOB#B01365427-I1, REMOVE AND REINSTALL PLUMBING SYSTEM INCLUDING WROUGH No product keyword matched | 1 | Oct 29, 2026 |
| B | Seagoat Monkey LLC NYC DOB building permits | 11 | General Construction · REPLACEMENT OF EXISTING STEEL AND BROWNSTONE LINTELS. No product keyword matched | 1 | Oct 29, 2026 |
| B | APPLE ROME NYC DOB building permits | 11 | Sidewalk Shed · Test No product keyword matched | 3 | Oct 29, 2026 |
| B | AMERICAN VENTILATION SERVICES INC NYC DOB building permits | 11 | Suspended Scaffold · Suspended Scaffold installation as per plans filed herewith. No product keyword matched | 1 | Oct 29, 2026 |
| B | Marinepoint LLC NYC DOB building permits | 11 | Sprinklers · PROVIDE NEW 3 FIRE SPRINKLER WATER SERVICE. INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 29, 2026 |
| B | RUBIN EQUITIES INC NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 7 | Oct 29, 2026 |
| B | 300 AVE Y LLC NYC DOB building permits | 11 | Plumbing · PROPOSE NEW BATHROOM @ CELLAR, KITCHEN FIXTURES & WASHER @ 2ND FL AS PER PLAN IN CONJUNCTION WITH APPLICATION # M01094695-I1. No product keyword matched | 2 | Oct 29, 2026 |
| B | Bedford Management Company NYC DOB building permits | 11 | Structural · JOW FILED TO SHOW 3RD FLOOR REAR BALCONIES COMBINATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 5 | Oct 29, 2026 |
| B | 47th Avenue Holding, LLC NYC DOB building permits | 11 | Mechanical Systems · Install mini-split HVAC systems and ventilation exhaust fans. No product keyword matched | 1 | Oct 29, 2026 |
| B | 621 EAST 21 STREET LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 29, 2026 |
| B | Phase III NYC NYC DOB building permits | 11 | Plumbing · Herewith filing Plumbing work as per plans and in conjunction with interior renovations and change of use. No product keyword matched | 2 | Oct 29, 2026 |
| B | DOMINION MANAGEMENT COMPANY LLC NYC DOB building permits | 11 | Plumbing · RELOCATE AND REPLACE PLUMBING FIXTURES AND ADD NEW PLUMBING FIXTURE No product keyword matched | 5 | Oct 29, 2026 |
| B | WESTSIDE MARKET NYC DOB building permits | 11 | Boiler Equipment · SUBSEQUENT BL FILING FOR ONE 38,000 BTU/HR CONVENTIONAL HOT-WATER HEATING BOILER 3L HEATING APARTMENT 3L, PREVIOUSLY INCLUDED UNDER INITIAL DOB JOB NO. B01359565-I1, TO OBTAIN A SEPARATE DOB BOILER NUMBER AS REQUESTED BY THE DOB INSPECTOR. No product keyword matched | 3 | Oct 29, 2026 |
| B | 230TH STREET PROPERTY LLC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 1 | Oct 29, 2026 |
| B | ICE AGE MECHANICAL CORP NYC DOB building permits | 11 | Mechanical Systems · Replacing existing indoor and outdoor HVAC units No product keyword matched | 2 | Oct 29, 2026 |
| B | LEVEL 10 CONSTRUCTION NYC DOB building permits | 11 | General Construction · OBTAIN NEW CO FOR EXISTING 4-STORY, 2-FAMILY DWELLING UNITS WITH NEW LAYOUT AS PLAN. PROPOSED ONE D.U. ON BASEMENT & TRIPLEX FOR ONE D.U. ON 1ST TO 3RD FLOOR. No product keyword matched | 1 | Oct 29, 2026 |
| B | FIRST STRUCTURE LLC NYC DOB building permits | 11 | Sprinklers · Sprinkler Application in conjunction with New Building. No product keyword matched | 3 | Oct 29, 2026 |
| B | TORA DEVELOPMENT LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF ONSITE SANITARY AND STORM DRAINAGE SYSTEM. THIS APPLICATION INCLUDES HOUSE #S 30 36 42 48 54 60 66 72 78 84 90 94 100 106 TENNYSON DRIVE, 350 354 358 362 366 370 374 112 NELSON AVE & 12 16 20 24 38 34 40 46 FITZEGERALD STREET. No product keyword matched | 4 | Oct 29, 2026 |
| B | L & Z CONSULTING CORP NYC DOB building permits | 11 | Sidewalk Shed · sidewalk shed No product keyword matched | 3 | Oct 29, 2026 |
| B | 90 Carroll Street LLC NYC DOB building permits | 11 | Construction Fence · INSTALL A TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 29, 2026 |
| B | B2K TP CONSTRUCTION LLC NYC DOB building permits | 11 | General Construction · THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS AND MINOR INTERIOR PARTITION WORK ON THE GROUND FLOOR. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 29, 2026 |