Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Forest Hills Deli NYC DOB building permits | 11 | General Construction · FILING FOR MINOR INTERIOR RENOVATION WITHIN AN EXISTING COMMERCIAL SPACE; WORK TO REPLACE FLOOR TILES, MILLWORK, AND INTERIOR FINISHES ONLY AS PER PLANS. No product keyword matched | 2 | Oct 30, 2026 |
| B | A&S.INTERIOR CONSTRUCTION |
| 11 |
Foundation · NEW FOUNDATION FOR NEW HORIZONTAL ENLARGMENT AND ELEVATOR SHAFTER AS PER THE DRAWINGS FILED HEREIN. No product keyword matched |
| 4 |
| Oct 30, 2026 |
| B | JCM PRO BUILDERS LLC NYC DOB building permits | 11 | Foundation · FOUNDATION & STRUCTURAL WORK IN CONJUNCTION WITH ALT-1 APPLICATION No product keyword matched | 3 | Oct 30, 2026 |
| B | KMS FLOORING & CONSTRUCTI NYC DOB building permits | 11 | General Construction · Filing interior removals for 1st and 2nd floor as per plans. PL removals under an LAA. Buildouts for STEAM school to be filed separately. No product keyword matched | 1 | Oct 30, 2026 |
| B | 2317 MAZAL W12 LLC NYC DOB building permits | 11 | General Construction · PROPOSED NEW 4 STORY MIXED USE BUILDING. No product keyword matched | 1 | Oct 30, 2026 |
| B | NUGACON BUILDING SERVICES, LLC NYC DOB building permits | 11 | Plumbing · REPLACEMENT OF ELECTRIC HOT WATER HEATER WITH NEW NAVIEN COMBI TANKLESS HOT WATER HEATER FOR SECOND FLOOR AND CELLAR No product keyword matched | 1 | Oct 30, 2026 |
| B | W. Houston Partners NYC DOB building permits | 11 | Antenna · Modification to an existing VERIZON telecommunications site. Relocate 2 existing GPS units, install 1 new equipment cabinet, and install 4 new RRH units on the roof. ALl in conformance with TPPN 5/98. No change in use egress or occupancy. No product keyword matched | 1 | Oct 30, 2026 |
| B | P & G NORTHERN REALTY NYC DOB building permits | 11 | Solar · Installation of Solar panels on existing roof structure, No change in use, egress or occupancy. No product keyword matched | 1 | Oct 30, 2026 |
| B | 1220 Holding LLC NYC DOB building permits | 11 | General Construction · Factory building w accessory offices: remove masonry from interior abandoned chimney, remove & install non-bearing patriations, modified masonry openings for windows with new lintel as per plans filed herewith. No change to use, egress, or occupancy No product keyword matched | 1 | Oct 30, 2026 |
| B | GONZALO Z CORP NYC DOB building permits | 11 | Mechanical Systems · INTERIOR RENOVATION TO EXISTING APARTMENT 107, LOCATED ON THE 1ST FLOOR AND CELLAR, AS PER PLANS. INCLUDING ASSOCIATED MECHANICAL WORK. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK. ALL WORK AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Oct 30, 2026 |
| B | BOLANOS BUILDERS LLC NYC DOB building permits | 11 | Mechanical Systems · Respectfully submitting application to renovate interior apartment as per plans. no change in use occupancy or egress. all work as per plans. No product keyword matched | 1 | Oct 30, 2026 |
| B | CRYSTAL REAL CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · RE-POINTING, REPAIR & PATCH WORK AT STONE BANDS & LINTELS, AS REQUIRED AS SHOWN ON PLANS. No product keyword matched | 2 | Oct 30, 2026 |
| B | THE CHADDHA FAMILY PARTNERSHIP NYC DOB building permits | 11 | Plumbing · Reconfigure water supply distribution to coordinate with new water service. Bring in new water service for job #M00776438-I1. Also to obtain DOB approved water supply riser diagram for use at DEP. There is no change in use occupancy or egress. No product keyword matched | 1 | Oct 30, 2026 |
| B | 5512 INC NYC DOB building permits | 11 | General Construction · CONVERT EXISTING COMMERCIAL BUILDING INTO TWO (2) FAMILY ON 2ND FLOOR AND RETAIL AND OFFICE ON 1ST FLOOR. PROPOSED INTERIOR RENOVATION AS PER PLAN. NO CHANGE IN EGRESS AND EXISTING BUILDING BULK. OBTAINING NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Oct 30, 2026 |
| B | HARMON, INC NYC DOB building permits | 11 | Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 1 | Oct 30, 2026 |
| B | ARCANE GROUP INC NYC DOB building permits | 11 | General Construction · PROPOSED ALTERATION FOR INTERIOR RENOVATION TO THE EXISTING DWELLING UNIT #107 AT FIRST FLOOR INCLUDING INSTALLATION OF REPLACEMENT AND INSTALLATION OF FIXTURES, FINISHES AND CASEWORK. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY UNDER THIS FILING No product keyword matched | 1 | Oct 30, 2026 |
| B | JOHN O'HARA COMPANY INC NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS FOR THE 2ND FLR CRYPTO ROOM PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 30, 2026 |
| B | PLATEAUX NYC DOB building permits | 11 | General Construction · Proposed building repairs and safety upgrades, including fire protection, gas meter enclosure, stair and roof access improvements, and exterior repairs as per plan. No change in use, occupancy or egress. No product keyword matched | 1 | Oct 30, 2026 |
| B | LEX 54 CONDOMINIUM NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 30, 2026 |
| B | J M R CONSTRUCTION COMPANY, INC. NYC DOB building permits | 11 | General Construction · PROPOSED OF REBUILD PARAPET WALL, WINDOW LINTELS AND CRACK REPAIRS TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 30, 2026 |
| B | Magic Place Daycare II NYC DOB building permits | 11 | General Construction · INSTALLATION OF NEW METAL LANDING AND STAIR AT REAR OF BUILDING TO SERVE AS WINDOW EGRESS FOR 1ST FLOOR FAMILY GROUP DAY CARE AS PER SUBMITTED DRAWINGS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 1 | Oct 30, 2026 |
| B | 52 WALKER COP NYC DOB building permits | 11 | General Construction · APPLICATION BEING FILED TO REPAIR BUILDING'S FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 30, 2026 |
| B | 40-19 Doronish Realty LLC NYC DOB building permits | 11 | Boiler Equipment · REMOVE ONE OLD OID OIL BOILER AND REPLACE ONE ONE GAS BOILER. No product keyword matched | 1 | Oct 30, 2026 |
| B | theory11 events LLC NYC DOB building permits | 11 | General Construction · Application being filed for the new seating arrangement of an existing theatre as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 30, 2026 |
| B | AMC LOEWS ORPHEUM 7 NYC DOB building permits | 11 | General Construction · Interior renovation as per plans filed herewith. No product keyword matched | 1 | Oct 30, 2026 |
| B | EVAN ROBERTS NYC DOB building permits | 11 | General Construction · Renovations in 4 apartments in existing multi-dwelling building due to water damage ( apartments A4, B5, C4, D5, E5 ) No product keyword matched | 1 | Oct 30, 2026 |
| B | SAWERA INTERIORS CORP NYC DOB building permits | 11 | Mechanical Systems · Mechanical work in existing townhouse basement, 1st and 2nd floor only. No product keyword matched | 1 | Oct 30, 2026 |
| B | EQUALITY CHARTER SCHOOL NYC DOB building permits | 11 | Sign · PROPOSED INSTALLATION OF 1 NON-ILLUMINATED ACCESSORY BUSINESS SIGN. WORDING EQUALITY CHARTER SCHOOL No product keyword matched | 1 | Oct 30, 2026 |
| B | MATEOS CORPORATION NYC DOB building permits | 11 | Curb Cut · PROPOSING A NEW CURB CUT AND DRIVEWAY THAT ACCESSES AN EXISTING PARKING SPACE. C.C. IS 7'-0 IN LENGTH WITH TWO (2) 1.5' SPLAYS FOR A TOTAL OF 10'-0 No product keyword matched | 1 | Oct 30, 2026 |
| B | BLACK SEAL REALTY CORP. NYC DOB building permits | 11 | Plumbing · INSTALL NEW GAS BOILER No product keyword matched | 1 | Oct 30, 2026 |
| B | Z BARCLAY GROUP NYC CORP NYC DOB building permits | 11 | General Construction · REMOVAL OF AN EXISTING METAL CANOPY WITH PLEXYGLASS TIED TO ADJOINING WALLS AND A RETRACTABLE AWNING INSTALLED UNDERNEATH IT IN THE REAR YARD OF AN EX. RESTAURANT AT BASEMENT AND RESOLVED VIOLATION 35167080L. NO CHANGE IN USE, OCCUPANCY, OR EGRESS No product keyword matched | 1 | Oct 30, 2026 |
| B | AKAY ELECTRIC CORPORATION NYC DOB electrical permits | 11 | In apartment 9C replace the outlet which was arcing. No product keyword matched | 15 | Oct 30, 2026 |
| B | SCHLESINGER ELECT'L CONTR NYC DOB electrical permits | 11 | # 25841-25850 NYCHA Waste Yards - #24-106\5 Job # 25845 - Glenmore No product keyword matched | 5 | Oct 30, 2026 |
| B | PROFF ELECTRICAL LLC NYC DOB electrical permits | 11 | Final connect and tag permit for 1 wall sign, ""Jo Malone London"", 45 sf on E 75th elevation. Branch circuit by others. (AIPC) No product keyword matched | 46 | Oct 30, 2026 |
| B | TRUE ELECTRIC CORP. NYC DOB electrical permits | 11 | WIRING OF NEW 2 FAMILY HOME WITH OWNERS METER No product keyword matched | 17 | Oct 30, 2026 |
| B | SAFEWAY CONSTRUCTION, INC NYC DOB electrical permits | 11 | INSTALLATION OF PANEL, LIGHTS AND AC UNITS IN NEW STORE No product keyword matched | 4 | Oct 30, 2026 |
| B | LABCO ELETRT CONTNG CORP NYC DOB electrical permits | 11 | PS 39 BRONX COVID VENTALATION - LABCOEL 10-26 No product keyword matched | 16 | Oct 30, 2026 |
| B | MOLLOY ELECTRIC INC NYC DOB electrical permits | 11 | Remove (3) 100A meter pans and mast pipe. Install new 3-Gang meter pan, mastpipe, boning and grounding No product keyword matched | 5 | Oct 30, 2026 |
| B | E.N.E.L. ELECTRICAL CORP NYC DOB electrical permits | 11 | Installation on an additional meter. No product keyword matched | 5 | Oct 30, 2026 |
| B | JECO ELEC'L SERVICE CORP. NYC DOB electrical permits | 11 | FILING TO REPAIR METER EQUIPMETN ONLY No product keyword matched | 17 | Oct 30, 2026 |
| B | TROON ELECTRIC OF NEW YOR NYC DOB electrical permits | 11 | general wiring. office buildout. 15th Floor. No product keyword matched | 5 | Oct 30, 2026 |
| B | BLU ELECTRICAL SVS INC NYC DOB electrical permits | 11 | service work only instaling new 4 meter pan and 4 panels only No product keyword matched | 12 | Oct 30, 2026 |
| B | JALEX ELEC'L CONTR. INC NYC DOB electrical permits | 11 | Temporary outlet No product keyword matched | 5 | Oct 30, 2026 |
| B | SKF ELECTRICAL CORP NYC DOB electrical permits | 11 | General light and power for bathroom renovation on 19th and 20th floors No product keyword matched | 1 | Oct 30, 2026 |
| B | STAR LIGHT ELECTRIC INC NYC DOB electrical permits | 11 | Install lights, switches and outlets in apt 16P No product keyword matched | 3 | Oct 30, 2026 |
| B | ANI ELECTRIC CORP NYC DOB electrical permits | 11 | new riser, new circuit to oven, new circuit to hvac No product keyword matched | 11 | Oct 30, 2026 |
| B | SELECT ELECTRICAL GROUP I NYC DOB electrical permits | 11 | Service and Branch Circuits 1 Family House No product keyword matched | 6 | Oct 30, 2026 |
| B | GM-POWER ELECTRIC CORP NYC DOB electrical permits | 11 | Rewiring existing 2 family house damaged by fire No product keyword matched | 8 | Oct 30, 2026 |
| B | WILLDAN ELECTRICAL OF NY NYC DOB electrical permits | 11 | This permit is for the purpose to withdraw/clear old BIS Permit # Z147241 No product keyword matched | 8 | Oct 30, 2026 |
| B | MECHANICAL ELECTR'L CORP. NYC DOB electrical permits | 11 | General wiring and lighting No product keyword matched | 7 | Oct 30, 2026 |