Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | TBRO'S RENOVATION INC NYC DOB building permits | 11 | General Construction · Interior renovation of apartment 7C associated with the GC scope. No change in use, egress, or occupancy under this application. No product keyword matched | 1 | Oct 30, 2026 |
| B | PM MECHANICAL GROUP CORP |
| 11 |
General Construction · In Unit 3A, install a new non-loadbearing light gauge metal stud and sheetrock wall to enclose a 77sf storage space within the apartment's existing footprint. New interior doors, built-in millwork, light fixtures, and switches as indicated on the plans No product keyword matched |
| 4 |
| Oct 30, 2026 |
| B | M&G PLUMBING AND HEATING NYC DOB building permits | 11 | Plumbing · Plumbing work related to the renovation/combination of apartments 12B and 12C on the 12th floor. No product keyword matched | 8 | Oct 30, 2026 |
| B | RENOVATION PARTNERS INC NYC DOB building permits | 11 | Mechanical Systems · Replacement of existing fan coil units and existing duct work in conjunction with renovation of existing apartment. No product keyword matched | 5 | Oct 30, 2026 |
| B | KAIKAI KIKI USA, LLC NYC DOB building permits | 11 | Plumbing · Herewith filing for related PL removals and installation for tenant build out. No product keyword matched | 1 | Oct 30, 2026 |
| B | EVAN CONSTRUCTION NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 3 | Oct 30, 2026 |
| B | CANGIALOSI CONSTRUCTION LLC NYC DOB building permits | 11 | Construction Fence · 8 foot plywood construction fence No product keyword matched | 1 | Oct 30, 2026 |
| B | MK IMPROVEMENT GROUP NYC DOB building permits | 11 | General Construction · PROPOSED 2 STORY WITH MEZZANINE, FABRICATION SHOP & WAREHOUSE BUILDING, GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN A NEW C OF O. No product keyword matched | 6 | Oct 30, 2026 |
| B | FERHATI LLC NYC DOB building permits | 11 | General Construction · Install exterior tie-back pins at the existing front facade as indicated on the plans. Perform localized facade repairs as required. No change in egress or occupancy. No product keyword matched | 3 | Oct 30, 2026 |
| B | BRUSCO REALTY MANAGEMENT LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION AND RELOCATION OF EXISTING KITCHEN, WITH PLUMBING WORK TO BE FILED UNDER SUBSEQUENT FILING. NOT CHANGE IN USE, FLOOR AREA, EGRESS OR OCCUPANCY. No product keyword matched | 6 | Oct 30, 2026 |
| B | ARIEL SERVICES INC NYC DOB building permits | 11 | Plumbing · New kitchen (1ST & CEL) with associated waste, vent. sanitary, gas & domestic water No product keyword matched | 3 | Oct 30, 2026 |
| B | A & F FIRE PROTECTION CO NYC DOB building permits | 11 | Sprinklers · Herewith filing sprinkler application for relocation, removal and new sprinkler heads as per plans. No change of use, egress or occupancy. No product keyword matched | 2 | Oct 30, 2026 |
| B | TURNER CONSTRUCTION COMPA NYC DOB building permits | 11 | Structural · Removal of existing tiles and fins only to the extent required and as indicated on plans. No change to egress, use, or occupancy. No product keyword matched | 10 | Oct 30, 2026 |
| B | UNLIMITED MECHANICAL COMP NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK FOR INTERIOR RENOVATION ON 18TH FLOOR IN EXISTING BUILDING. NO CHANGE OF OCCUPANCY, EGRESS OR USE. No product keyword matched | 1 | Oct 30, 2026 |
| B | SKYLINE RESTORATION INC NYC DOB building permits | 11 | General Construction · FACADE REPAIRS TO INCLUDE CONCRETE REPAIRS, GASKET REPLACEMENTS, FLASHING, EXPANSION JOINTREPAIRS, CURTAIN WALL REPAIRS, AND CONCRETE COATING. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 7 | Oct 30, 2026 |
| B | JW MARRIOTT ESSEX HOUSE NYC DOB building permits | 11 | Mechanical Systems · Mechanical work to replace 2 HVAC air handler units for upgrade on the 9th floor. No product keyword matched | 1 | Oct 30, 2026 |
| B | CENTENNIAL PROPERTIES NY INC. NYC DOB building permits | 11 | Mechanical Systems · Installation of a type I kitchen hood connected to existing exhaust ducts No product keyword matched | 5 | Oct 30, 2026 |
| B | Y&Z DEVELOPERS INC. NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE No product keyword matched | 7 | Oct 30, 2026 |
| B | EVERFLOW PLUMBING & HEATI NYC DOB building permits | 11 | Plumbing · APPLICATION FILED TO ADD NEW PLUMBING FIXTURES IN AN EXISTING RETAIL STORE. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 30, 2026 |
| B | LANDAU DEVELOPMENT CORP, LLC NYC DOB building permits | 11 | Foundation · Foundation in conjunction with construction of 51 story new building. No product keyword matched | 4 | Oct 30, 2026 |
| B | K&P BUILDERS CORP NYC DOB building permits | 11 | Full Demolition · Application filed for full demolition of the existing one-family dwelling house by using handheld equipment. No product keyword matched | 4 | Oct 30, 2026 |
| B | SHS PELHAM NYC DOB building permits | 11 | Plumbing · Proposed installation of new unisex accessible toilets. No change to use, occupancy or egress under this application. No product keyword matched | 1 | Oct 30, 2026 |
| B | star dust NYC DOB building permits | 11 | Sidewalk Shed · DOB No product keyword matched | 20 | Oct 30, 2026 |
| B | FH 2BRO BUILDER CORP. NYC DOB building permits | 11 | Structural · STRUCTURAL WORK FOR NEW 6-STORY MIXED-USE BUILDING. No product keyword matched | 6 | Oct 30, 2026 |
| B | CORNBREAD BROOKLYN NYC DOB building permits | 11 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - CORNBREAD. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 30, 2026 |
| B | MAVRICI CONSTRUCTION INC NYC DOB building permits | 11 | Structural · Structural work for a two-family dwelling building. No change in use, egress, or occupancy. No product keyword matched | 2 | Oct 30, 2026 |
| B | TestAgency852 NYC DOB building permits | 11 | Sidewalk Shed · Test No product keyword matched | 2 | Oct 30, 2026 |
| B | 235 WEST 75TH STREET SPONSOR LLC NYC DOB building permits | 11 | Plumbing · Filing for new plumbing work in unit #920 on the 9th floor. No change in use, egress or occupancy. No product keyword matched | 3 | Oct 30, 2026 |
| B | RAUCH DESIGN BUILD INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING TWO FAMILY RESIDENCE. INTERIOR RENOVATION WITH NEW PARTITIONS, FINISHES, AND FIXTURES PER PLAN. No product keyword matched | 3 | Oct 30, 2026 |
| B | TESTBUSINESS4 NYC DOB building permits | 11 | General Construction · Testing No product keyword matched | 1 | Oct 30, 2026 |
| B | Mdl consulting services NYC DOB building permits | 11 | Construction Fence · construction fence No product keyword matched | 1 | Oct 30, 2026 |
| B | SCHIM LLC NYC DOB building permits | 11 | General Construction · Renovation of an existing dwelling unit. Architectural work as per plans. Partial demolition for a new facade penetration. No change of use, occupancy or egress. No product keyword matched | 2 | Oct 30, 2026 |
| B | ST. GEORGE TOWER AND GRILL OWNERS C NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 5 | Oct 30, 2026 |
| B | GW INFINITY LLC NYC DOB building permits | 11 | Structural · New 17 Story residential building No product keyword matched | 9 | Oct 30, 2026 |
| B | Harlem PACT Partners LLC NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 2 | Oct 30, 2026 |
| B | JANUSZ SAWA NYC DOB building permits | 11 | General Construction · Interior renovation to Apt#W12C. Minor demolition and construction of partitions and finishes. All as per plans submitted herewith. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 30, 2026 |
| B | DYNASTY CONTRACTING LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE W/ 80'-0 FRONTAGE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Oct 30, 2026 |
| B | Exo Industries Corp. NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 9 | Oct 30, 2026 |
| B | NEW PACE CONTRACTING CORP NYC DOB building permits | 11 | Structural · Repair and rebuild of collapsed exterior retaining wall as shown on the drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched | 4 | Oct 30, 2026 |
| B | WEST HARLEM RENAISSANCE HDFC NYC DOB building permits | 11 | Solar · Installation of 6.6 kw solar energy system on roof. No change of occupancy, use or egress. No product keyword matched | 1 | Oct 30, 2026 |
| B | CANY ARCHITECTURE + ENGINEERING DPC NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Oct 30, 2026 |
| B | QWEST CONTRACTING CORP NYC DOB building permits | 11 | General Construction · HEREWITH FILING INTERIOR ALTERATIONS TO THE 6TH FLOOR OFFICE. NO CHANGE TO USE OCCUPANCY OR EGRESS No product keyword matched | 1 | Oct 30, 2026 |
| B | PANACEA CONTRACTING CORP NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATIONS TO EXISTING STORE WITH NEW ADA BATHROOM. No product keyword matched | 1 | Oct 30, 2026 |
| B | ASG EQUITIES LLC NYC DOB building permits | 11 | Sign · INSTALL NON-ILLUMINATED PAINTED ADVERTISING SIGN ON EXTERIOR WALL. FILED AS PER LANDMARKS APPROVAL # 26-11370. (CHANGEABLE COPY) No product keyword matched | 4 | Oct 30, 2026 |
| B | BLUETEC CABINETRY LTD NYC DOB building permits | 11 | General Construction · Renovate 11th fl apt., work to include: renovate bathrooms, kitchen & maids' room, minor modifications to non structural partitions, refinish wood floors; Plumbing to be filed as a Sub Doc.(Apt. SF is 2287 SF) There is no change to use, egress, occupancy No product keyword matched | 1 | Oct 30, 2026 |
| B | 1596llc NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION TO BUILD COMMERCIAL LAUNDRY, WORK INCLUDES INSTALLATION OF MINOR PARTITIONS AND DOOR, CONCRETE PAD FOR WAHERS, SUPPORTING COLUMNS AMD DRYER EXHAUSET VENT. No product keyword matched | 1 | Oct 30, 2026 |
| B | PRECISION CONSTRUCTION & NYC DOB building permits | 11 | General Construction · FILE GENERAL CONSTRUCTION WORK OF PROPOSED STORE ON 1ST FLOOR WITH REMOVE/REPLACE/NEW INTERIOR PARTITIONS, FLOOR TILES, NEW HARD CEILING, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 30, 2026 |
| B | SKINNER PLBG & HTG CORP NYC DOB building permits | 11 | Mechanical Systems · INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 30, 2026 |
| B | LOD CONSTRUCTION LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Oct 30, 2026 |
| B | MACCARONE PLUMBING INC NYC DOB building permits | 11 | Plumbing · PLUMBING RENOVATIONS IN PUBLIC BATHROOMS ON THE GROUND FLOOR AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE TO EXISTING USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 30, 2026 |