Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | M & M PIPING AND HEATING NYC DOB building permits | 11 | Plumbing · NEW INSTALLATION OF PLUMBING AND SPRINKLER SYSTEM. No product keyword matched | 19 | Oct 30, 2026 |
| B | SKINNER PLUMBING & HEATIN NYC DOB building permits | 11 |
Plumbing · CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched |
| 3 |
| Oct 30, 2026 |
| B | AB 40TH STREET LLC NYC DOB building permits | 11 | Plumbing · Demolition of minor piping and HWH. Installation of new plumbing fixtures. No change of use, egress or occupancy under this application. No product keyword matched | 3 | Oct 30, 2026 |
| B | ROBERT E. HILL, INC. NYC DOB building permits | 11 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS FILED UNDER APPLICATION # M01188484. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 19 | Oct 30, 2026 |
| B | BDG 99QB, LLC NYC DOB building permits | 11 | Sprinklers · RP - FILING HEREWITH FOR THE SPRINKLER WORK RELATED TO THE INTERIOR RENOVATION OF THE EXISTING SPACE.. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. No product keyword matched | 3 | Oct 30, 2026 |
| B | TJAR GROUP CORP NYC DOB building permits | 11 | Structural · PROPOSED SUPER STRUCTURE WORK FILING #Q01257671-S5 IN CONJUNCTION WITH G/C FILING #Q01257671-I1 No product keyword matched | 10 | Oct 30, 2026 |
| B | 505 OVINGTON PARTNERS LLC NYC DOB building permits | 11 | General Construction · RENOVATION OF EXISTING 2 STORY W/ CELLAR COMMERCIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 30, 2026 |
| B | 14447 Holdings LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER SYSTEMS INSTALLATION IN CONJUNCTION WITH APPLICATION Q01268246-I1FOR PROPOSED 3-FAMILY DWELLING. THIS IS A HYDRAULICALLY CALCULATED SYSTEM. NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 1 | Oct 30, 2026 |
| B | MAGIC RENOVATIONS CORP NYC DOB building permits | 11 | General Construction · RENOVATION OF APT PHB FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 30, 2026 |
| B | Spa Laundries NYC DOB building permits | 11 | Mechanical Systems · Application is filed for the installation of ductless VRF units, dryer exhaust and intake ductwork, toilet exhaust and outside air intake fan for the laundry mat. No product keyword matched | 1 | Oct 30, 2026 |
| B | KOBAX CORP NYC DOB building permits | 11 | Foundation · HEREBY FILING FOUNDATION WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS DOCUMENT No product keyword matched | 2 | Oct 30, 2026 |
| B | AMS BUILDERS LLC NYC DOB building permits | 11 | General Construction · Filing for interior demo and renovation due to fire damage. Work to include, but not limited to, partitions, floors, and ceilings. No change in use, egress, or occupancy. No product keyword matched | 2 | Oct 30, 2026 |
| B | BROOKLYN MUSEUM NYC DOB building permits | 11 | Structural · Interior renovation of Arts of Africa associated with the Structural Scope. No change in use, egress, or occupancy under this application. No product keyword matched | 9 | Oct 30, 2026 |
| B | CAPE PLUMBING INC NYC DOB building permits | 11 | Plumbing · REMOVE BATHTUB, REMOVE OVEN, REPLACE KITCHEN SINK WITH MOPSINK, ALL WORK IN CELLAR. NO CHANGE IN USE, OCCUPANCY, EGRESS OR BULK. No product keyword matched | 8 | Oct 30, 2026 |
| B | 205-215 LEXINGTON AVE NYC DOB building permits | 11 | General Construction · RENOVATE 21ST FLOOR: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING AND FLOOR FINISHES. INSTALL NEW NON-LOAD BEARING PARTITIONS, FLOORING FINISHES, CEILINGS AND MILL WORK AS PER PLANS FILED. NO CHANGE IN EGRESS. No product keyword matched | 4 | Oct 30, 2026 |
| B | STITCHT NYC DOB building permits | 11 | Mechanical Systems · PROVIDE NEW SPLIT-SYSTEM AND ROOF MOUNTED PACKAGE AC-UNITS TO REPLACE EXISTING. PROVIDE ASSOCIATED PIPING, CONTROLS, SUPPORTS, ETC. PROVIDE CODE REQUIRED VENTILATION AIR. No product keyword matched | 9 | Oct 30, 2026 |
| B | W.JAKE CONSTRUCTION CORP NYC DOB building permits | 11 | Full Demolition · FULL DEMOLITION OF EXISTING DETACHED 2 STORY FRAME BUILDING. No product keyword matched | 6 | Oct 30, 2026 |
| B | FINE MECHANICAL CORP NYC DOB building permits | 11 | General Construction · CONSTRUCT FOUR STORY BUILDING WITH CELLAR. No product keyword matched | 7 | Oct 30, 2026 |
| B | CHANDRABALI RAMANAND NYC DOB building permits | 11 | Mechanical Systems · Provide (2) new 1.0 ton indoor Hi-Wall Split Heat Pump units, (1) new 2.0 ton indoor Hi-Wall Split Heat Pump & (1) new 1.5 ton Cassette unit along w/ condensing unit, including all necessary access., for complete & operational HVAC sys. (SEE Comments:) No product keyword matched | 2 | Oct 30, 2026 |
| B | TRIERA CONTRACTING INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 20 | Oct 30, 2026 |
| B | NORTH GATE MANAGEMENT NYC DOB building permits | 11 | Construction Fence · FILING FOR TEMPORARY WOOD FENCE AS SUBSEQUENT FILING FOR NB JOB # X01007483 AS PER PLAN SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Oct 30, 2026 |
| B | St. Mary’s Healthcare System NYC DOB building permits | 11 | Supported Scaffold · Installation of a temporary SF, heavy-duty SH, FN, and RP in conjunction with AltCO# Q01100215-I1 as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 30, 2026 |
| B | SARK FLOORING LLC NYC DOB building permits | 11 | General Construction · Interior renovation of non-load bearing partitions, doors, & lighting to existing commercial space on the 3rd floor. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 30, 2026 |
| B | 125 EAST 31ST STREET REALTY LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Oct 30, 2026 |
| B | 360 EAST 72ND STREET MANAGEMENT COR NYC DOB building permits | 11 | General Construction · STOREFRONT REPLACEMENT AT EXISTING GROUND FLOOR CHASE BANK INCLUDING WATERPROOFING WORK, WALL AND CEILING FINISH REPLACEMENT THROUGHOUT SPECIFIC AREAS SHOWN ON PLAN.. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 30, 2026 |
| B | 902 ASSOCIATES NYC DOB building permits | 11 | Mechanical Systems · Filing herewith mechanical work on 12th floor. No change in use, egress or occupancy. No product keyword matched | 9 | Oct 30, 2026 |
| B | DEPENDABLE MECHANICAL COR NYC DOB building permits | 11 | Sprinklers · PROPOSE SPRINKLER WORK IN CONJUNCTION WITH RENOVATION OF APARTMENT #46A ON THE 45TH FLOOR UNDER ARCH#M01406052-I1. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Oct 30, 2026 |
| B | A.L.L. CONSTRUCTION AND D NYC DOB building permits | 11 | Mechanical Systems · MECH WORK IN APT 8-B CONSISTING OF NEW VRF SYSTEM AND NEW PTACS TO REPLACE EXIST. NEW DUCTWORK FROM NEW KIT HOOD TO EXIST EXTERIOR EXHAUST LOUVER AND DUCTWORK MODIFICATIONS TO TOILET & LAUNDRY EXHAUSTS No product keyword matched | 3 | Oct 30, 2026 |
| B | Lionstone Developers LLC NYC DOB building permits | 11 | Structural · NEW 3-STORY STEEL&CFS FRAMING BUILDING IN CONJUNCTION WITH NB APPLICATION NO.#B01038431-I1 No product keyword matched | 2 | Oct 30, 2026 |
| B | MOINIAN GROUP NYC DOB building permits | 11 | Sprinklers · Sprinkler modifications. No change to use, egress or occupancy. No product keyword matched | 8 | Oct 30, 2026 |
| B | DELTA CONTRACTING GROUP I NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. No product keyword matched | 1 | Oct 30, 2026 |
| B | HARLEM PROPERTY MANAGEMENT NYC DOB building permits | 11 | Suspended Scaffold · New Suspended Scaffold for Facade repair and inspection. No product keyword matched | 4 | Oct 30, 2026 |
| B | MONSIGNOR FARRELL HIGH SCHOOL NYC DOB building permits | 11 | Plumbing · PLUMBING APPLICATION FILED IN ORDER TO INDICATE GAS PIPING FOR REPLACEMENT OF 2 BOILERS AT EXISTING PROPERTY, LOCATED IN BASEMENT SPACE.INSTALLATION OF NEW GAS METER AT OSP INSTALLATION OF GAS LINE AT EXISTING BOILER ROOM. No product keyword matched | 2 | Oct 30, 2026 |
| B | TRISTATE FIRE SPRINK INC NYC DOB building permits | 11 | Sprinklers · New sprinkler and standpipe systems in conjunction with Alt-CO. No product keyword matched | 6 | Oct 30, 2026 |
| B | ACCURATE MECH INDSTRS INC NYC DOB building permits | 11 | Plumbing · Relocation of water fountain, addition of kitchen equipment No product keyword matched | 6 | Oct 30, 2026 |
| B | DS400OWNER LLC NYC DOB building permits | 11 | Structural · Propose to file for structural work for lintel replacement. No change in use, egress or occupancy. No product keyword matched | 6 | Oct 30, 2026 |
| B | SOLOMON R. GUGGENHEIM MUSEUM NYC DOB building permits | 11 | General Construction · Install of temp platform & LED wall, no alt to exist structures for Guggenheim Gala event. A TPA is required. Producer is responsible to monitor site safety. All production equip removed upon event completion. No product keyword matched | 5 | Oct 30, 2026 |
| B | BP 347 MADISON ASSOCIATES, LLC C/O NYC DOB building permits | 11 | Structural · FILING HEREWITH FOR STRUCTURAL PLANS (SUPERSTRUCTURE) APPLICATION FILED IN CONJUNCTION WITH NB M00615380-I1 No product keyword matched | 4 | Oct 30, 2026 |
| B | LINE CONSTR GROUP, CORP NYC DOB building permits | 11 | General Construction · Front yard step replacement, pavement repairs, stucco paints repairs, no change in use, egress, or occupancy. No product keyword matched | 4 | Oct 30, 2026 |
| B | ECONO AIR HEATING/COOLING NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL DEMO FOR REMOVAL OF UNUSED LOW PRESSURE STEAM PIPES, LOW PRESSURE CONDENSATE PUMP AND ITS ASSOCIATED ACCESSORIES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 30, 2026 |
| B | LIQUID PLBG & HTNG SCS IN NYC DOB building permits | 11 | Plumbing · Subsequent filing for plumbing modifications to support residential alteration. Scope includes relocation and new installation of plumbing fixtures and associated branch water and sanitary lines from cellar to second floor, as per plans. No product keyword matched | 1 | Oct 30, 2026 |
| B | 219 GC LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AT REAR COURYARD AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 6 | Oct 30, 2026 |
| B | MACY'S INC. NYC DOB building permits | 11 | General Construction · Temporary Structures for 2026 Macy's Thanksgiving Parade. No alterations to existing structures. Producer is responsible to monitor site safety & implement appropriate actions. All equipment removed upon event completion. No product keyword matched | 13 | Oct 30, 2026 |
| B | QSAC, Inc NYC DOB building permits | 11 | General Construction · PROPOSE TO REMODEL AND ENLARGE THE EXISTING UTILITY ROOM LOCATED IN THE CELLAR AND BRING THE SPACE INTO COMPLIANCE WITH THE CURRENT NYC BUILDING CODE, AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 1 | Oct 30, 2026 |
| B | INFRASTRUCTURE REPAIR SER NYC DOB building permits | 11 | General Construction · PARKING GARAGE REPAIRS. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 30, 2026 |
| B | BEST CONTRACTING CORP NYC DOB building permits | 11 | Structural · Structural work in conjunction with BIS application Alt 1 Job No: 220672779 No product keyword matched | 2 | Oct 30, 2026 |
| B | 19 NY GARDEN LLC NYC DOB building permits | 11 | Mechanical Systems · PROPOSED NEW 2-STORY DETACHED RESIDENCE FOR 2-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 3 | Oct 30, 2026 |
| B | Rogers equities NYC DOB building permits | 11 | Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 5 | Oct 30, 2026 |
| B | LEADING GREEN ENERGY CON NYC DOB building permits | 11 | Solar · solar panel roof install No product keyword matched | 3 | Oct 30, 2026 |
| B | 786 CONTRACTING INC NYC DOB building permits | 11 | Suspended Scaffold · Suspended scaffold outrigger system for facade repair works. No product keyword matched | 5 | Oct 30, 2026 |