Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | THE ROCKEFELLER UNIVERSITY NYC DOB building permits | 11 | Boiler Equipment · Removal of three fuel oil storage tanks and replace with two tanks with related piping and pumps in cellar and change grade from #4 to #2 oil as per plans filed herewith. No product keyword matched | 4 | Nov 2, 2026 |
| B | BUILDER BROTHER GROUP INC |
| 11 |
General Construction · PROPOSED INTERIOR RENOVATION @ 31TH FLOOR (APT R8). WORK INCLUDES DEMOLITION AND INSTALLATION OF NON-LOAD-BEARING PARTITIONS, FLOOR FINISH, CEILING BOARDS, AND DOORS; REMOVAL AND INSTALLATION OF NEW KITCHEN COUNTER AS PER PLAN. NO CHANGE IN USE & EGRESS. No product keyword matched |
| 2 |
| Nov 2, 2026 |
| B | SYCAMORE BIRCH MANAGEMENT NYC DOB building permits | 11 | Supported Scaffold · INSTALL TEMPORARY SIDEWALK SHED AND SUPPORTED SCAFFOLD. REPLACE APPROX. FIVE WINDOW LINTELS AND ASSOCIATED BRICK MASONRY REPAIRS AT FRONT FACADE. No product keyword matched | 1 | Nov 2, 2026 |
| B | LXC CONSTRUCTION INC NYC DOB building permits | 11 | Structural · PROPOSED HORIZONTAL EXTENSION FOR EXISTING TWO STORY ONE FAMILY HOUSE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 12 | Nov 2, 2026 |
| B | GOLDS PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Modification to the existing plumbing system including removal and installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 5 | Nov 2, 2026 |
| B | THE TRUST FOR GOVERNORS ISLAND NYC DOB building permits | 11 | Plumbing · M533 : Interior and Underground Plumbing for the 5 Story Educational Structure. No GAS Connection. No product keyword matched | 21 | Nov 2, 2026 |
| B | Y&S REMODELING INC NYC DOB building permits | 11 | Mechanical Systems · Mechanical work type hereby filed subsequent to the Alt. CO / NB application: B01205448-I1 No product keyword matched | 3 | Nov 2, 2026 |
| B | NYC ECONOMIC DEVELOPMENT CORP NYC DOB building permits | 11 | Support of Excavation · FILING HEREWITH SUPPORT OF EXCAVATION FOR TEMPORARY PARKING AREA AS PER PLANS. FILED UNDER MPP Project-000000254. No product keyword matched | 58 | Nov 2, 2026 |
| B | Ahuva Realty LLC NYC DOB building permits | 11 | Plumbing · REPLACEMENT/RELOCATION/INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 2 | Nov 2, 2026 |
| B | KW NY CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · 1. REPLACE THE CRACK BRICK AROUND THE CHIMNEY ABOVE THE ROOF LEVEL APPROXIMATELY= 70 PCS2. RE-POINTING THE BRICK JOINT AROUND THE CHIMNEY ABOVE THE ROOF LEVEL APPROXIMATELY=200 SF No product keyword matched | 2 | Nov 2, 2026 |
| B | ALLE PROCESSING CORP NYC DOB building permits | 11 | Boiler Equipment · Addition of (3) new steam boilers. No change to use, occupancy, or egress. No product keyword matched | 1 | Nov 2, 2026 |
| B | QN 48 LLC NYC DOB building permits | 11 | Sprinklers · New sprinkler system installation all-in conjunction with #X00683317-I1. No product keyword matched | 2 | Nov 2, 2026 |
| B | ETHOS PLUMBING CORP NYC DOB building permits | 11 | Plumbing · RENOVATION OF EXISTING 2-FAMILY DWELLING INCLUDING NEW AND RELOCATED PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 4 | Nov 2, 2026 |
| B | MAXIM PROPERTIES INC NYC DOB building permits | 11 | Construction Fence · Proposed construction fence. No change to use, egress or occupancy under this application. No product keyword matched | 1 | Nov 2, 2026 |
| B | THE BOWERY MISSION NYC DOB building permits | 11 | General Construction · REPLACE EXISTING ROOF MEMBRANE WITH NEW ROOF MEMBRANE AT REAR OF 227 BOWERY AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 2, 2026 |
| B | STREAM PLUMBING INC NYC DOB building permits | 11 | Plumbing · INSTALL PLUMBING WORK AS PER PLANS FILED. No product keyword matched | 1 | Nov 2, 2026 |
| B | AZ INTERIORS NY LLC NYC DOB building permits | 11 | Foundation · FOUNDATION WORK IN CONJUNCTION WITH RENOVATION & BUILDING ENLARGEMENT FOR 1 FAMILY RESIDENCE. INSTALL NEW CONCRETE BENCHING AT CELLAR. INSTALL NEW CONCRETE FOOTINGS FOR NEW REAR HORIZONTAL ENLARGEMENT. NOTE: FOUNDATION TO COMPLY WITH 2022 CODE. No product keyword matched | 6 | Nov 2, 2026 |
| B | METROTECH MECHANICAL CORP NYC DOB building permits | 11 | Plumbing · Minor interior plumbing modification related to apartment renovation. No change to occupancy, use or egress. No product keyword matched | 6 | Nov 2, 2026 |
| B | BREFFNI MECHANICAL INC NYC DOB building permits | 11 | Mechanical Systems · Interior mechanical renovation to existing commercial space on the 3rd floor. No change in use, egress, or occupancy. No product keyword matched | 2 | Nov 2, 2026 |
| B | RB REALTY CAPITAL LLC NYC DOB building permits | 11 | Mechanical Systems · TENANT INTERIOR FIT-OUT OF EXISTING SHELL SPACE TO INCLUDE REMOVAL AND INSTALLATION OF PARTITION, DUCT LAYOUT FOR MECHANICAL WORK AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 5 | Nov 2, 2026 |
| B | EC613 LLC NYC DOB building permits | 11 | General Construction · Facade restoration as per plans. No change in egress, use, or occupancy. No product keyword matched | 1 | Nov 2, 2026 |
| B | Akelius Real Estate NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 9 | Nov 2, 2026 |
| B | J.M.P. CONTRACTING CORP NYC DOB building permits | 11 | General Construction · NTERIOR RENOVATION TO APARTMENT NUMBER 15L. NO CHANHE OF USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Nov 2, 2026 |
| B | ACCRETE CONSTRUCTION GROUP NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01234296-I1. No product keyword matched | 12 | Nov 2, 2026 |
| B | 501 East 87th, LLC NYC DOB building permits | 11 | General Construction · REFURBISHING KITCHEN AND BATH CABINETS IN 6 UNITS 3K,4K,8B,11I,10F,15E, REPLACING KTCHEN SINK LAV TOILET PROTECTING RANGE , HOOD , AND TUB, ALL ON EXISTING RISERS. No product keyword matched | 3 | Nov 2, 2026 |
| B | P.S.I. MECHANICAL NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING ON FLOORS 001 THRU 003. REMOVAL, RELOCATION AND NEW PLUMBING FIXTURES PROPOSED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 14 | Nov 2, 2026 |
| B | EXCELLENT METROPOLITAN NYC DOB building permits | 11 | Construction Fence · Temporary construction fence filed in conjunction with DOB NOW #B01186082 as per plan. No product keyword matched | 12 | Nov 2, 2026 |
| B | BSD 80 BROAD LLC NYC DOB building permits | 11 | Foundation · Foundation work for new elevator pits, top bars on existing foundations and new posts. No product keyword matched | 11 | Nov 2, 2026 |
| B | LVJ NYC DOB building permits | 11 | Foundation · Replace damaged floor joists throughout and installation of standard foundation concrete piers and footings at Basement, 001 - 003 floor and Roof. Foundation, Structural and General construction work. No change in use, occupancy or egress. No product keyword matched | 2 | Nov 2, 2026 |
| B | HEARST NYC DOB building permits | 11 | General Construction · REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES ON FLOOR 3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS CAPACITY, OR OCCUPANCY No product keyword matched | 4 | Nov 2, 2026 |
| B | GREAT STONE GEN'L CONST* NYC DOB building permits | 11 | Structural · PROPOSED 4 STORY BUILDING WITH CELLAR No product keyword matched | 6 | Nov 2, 2026 |
| B | Montefiore Medical Center NYC DOB electrical permits, NYC DOB building permits | 11 | Mechanical Systems · Modification of existing ductwork and air outlets to serve new R.O. room, including fire damper in existing wall and new supply/return registers. No change in egress, occupancy, or use. No product keyword matched | 19 | Nov 2, 2026 |
| B | 44LIC Development SP LLC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Nov 2, 2026 |
| B | KALEL COMPANIES NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold No product keyword matched | 11 | Nov 2, 2026 |
| B | HITECH RENOVATIONS CORP NYC DOB building permits | 11 | Construction Fence · 8' WOOD CONSTRUCTION FENCE No product keyword matched | 3 | Nov 2, 2026 |
| B | 110 WILLIAM PROPERTY INVESTORS III, NYC DOB building permits | 11 | Suspended Scaffold · Facade Repairs No product keyword matched | 1 | Nov 2, 2026 |
| B | SUPERB PLUMBING & HEATING NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF FIRST FLOOR EXISTING SMALL EATING & DRINKING ESTABLISHMENT > 75P. INSTALL PLUMBING FIXTURES AND PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 11 | Nov 2, 2026 |
| B | JEM FIRE PREVENTION INC NYC DOB building permits | 11 | Sprinklers · PROVIDE NEW FIRE SPRIKLER SYSTEM THROUGHOUT THREE STORY RESIDENTIAL BUILDING WITH CELLAR.JOB TO FILED TO RELATED TO ALT CO #B014444826-I1. No product keyword matched | 4 | Nov 2, 2026 |
| B | MADONIA DEVELOPMENT CORP NYC DOB building permits | 11 | Full Demolition · Demo detached 2 story house. On-site and off-site fill not to exceed 300 cubic yards. No product keyword matched | 28 | Nov 2, 2026 |
| B | MARLANDE HEATING CORP NYC DOB building permits | 11 | Mechanical Systems · INSTALL NEW VACUUM PUMP SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Nov 2, 2026 |
| B | GV IMPERIAL CONSTGROUP IN NYC DOB building permits | 11 | General Construction · NEW EIGHT (8) STORY MIXED USE BUILDING No product keyword matched | 5 | Nov 2, 2026 |
| B | HOLLISWOOD DEVELOPMENT NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF NEW SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 2, 2026 |
| B | PETER PLUMBING ASSOC. INC NYC DOB building permits | 11 | Plumbing · REMOVAL OF BOILER (BL#60785-01) AT BOILER RM IN THE CELLAR. NEW HEATING/COOLING (HVAC) SYSTEM IS FILED UNDER DOB#Q01444094-I1. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 2, 2026 |
| B | HBP REALTY NYC DOB building permits | 11 | General Construction · Renovation of new DUNKIN store on an existing 1-story building. Installation of new non-load bearing partitions and new doors. Replace wall finishes, ceiling tiles, & lighting. No change in use, egress nor occupancy. No product keyword matched | 4 | Nov 2, 2026 |
| B | FIFTH AVE COMMITTEE INC NYC DOB building permits | 11 | Plumbing · FILED HEREWITH FOR PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Nov 2, 2026 |
| B | MARGARET TIETZ NURSING & REHAB CENT NYC DOB building permits | 11 | General Construction · APPLICATION IS LIMITED TO NON-STRUCTURAL INTERIOR DEMOLITION. REMOVAL OF NON BEARING PARTITIONS, FIXTURES, AND FINISHES. No product keyword matched | 1 | Nov 2, 2026 |
| B | CREATIVE BUILDERS& DEVEL* NYC DOB building permits | 11 | Foundation · UNDERPINNING APPLICATION FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01278949-I1. No product keyword matched | 5 | Nov 2, 2026 |
| B | FORTRESS FORCE CONST. COR NYC DOB building permits | 11 | General Construction · File job to repair the garage, address the full vacate order compiant # 3A10888, no change in use, egress or occupancy No product keyword matched | 2 | Nov 2, 2026 |
| B | INNER CITY CONTRACTING LLC NYC DOB building permits | 11 | Boiler Equipment · Installation of two (2) new gas fired boilers. No change in egress, use, or occupancy. No product keyword matched | 3 | Nov 2, 2026 |
| B | JPMORGAN CHASE BANK NA NYC DOB building permits | 11 | Mechanical Systems · Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress. No product keyword matched | 8 | Nov 2, 2026 |