Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | AVALON ELECTRIC CORP. Austin issued construction permits, NYC DOB electrical permits | 11 | Electrical Permit · Interior tenant build-out of an existing vacant restaurant space for a Firehouse Subs quick-service restaurant; includes architectural MEP kitchen equipment and finishes. No product keyword matched | 10 | Nov 4, 2026 |
| B |
| STATEN ISLAND ELEC CONT. NYC DOB electrical permits |
| 11 |
Supersede abandoned permit for basement work. No product keyword matched |
| 11 |
| Nov 4, 2026 |
| B | STRIANO ELECTRIC CO., INC NYC DOB electrical permits | 11 | Job -1565 Morgan Stanley 7th floor No product keyword matched | 9 | Nov 4, 2026 |
| B | COMBINED ELECL CONTNG INC NYC DOB electrical permits | 11 | General wiring at ground floor. No product keyword matched | 5 | Nov 4, 2026 |
| B | G T DYNAMICS ELECTRIC INC NYC DOB electrical permits | 11 | Meter work and panel work wiring though out building No product keyword matched | 1 | Nov 4, 2026 |
| B | A2K ELECTRIC CORP NYC DOB electrical permits | 11 | General Wiring and Lighting Floors 1,2 & Roof No product keyword matched | 20 | Nov 4, 2026 |
| B | G-SQUARED ELECTRIC, LLC NYC DOB electrical permits | 11 | Extending power to 10HP HVAC units and FSDs No product keyword matched | 1 | Nov 4, 2026 |
| B | GT ELECTRICAL COMPANY INC NYC DOB electrical permits | 11 | RETROFIT OF ALL LIGHTS TO LEDS. REPLACE SWITCHS TO ENERGY SAVINGS No product keyword matched | 2 | Nov 4, 2026 |
| B | PREMIER ELEC'L CONTR'S IN NYC DOB electrical permits | 11 | THIS TO CLOSE OUT APP# R056715 FROM 6/5/1996 No product keyword matched | 4 | Nov 4, 2026 |
| B | MGA ELECTRIC INC NYC DOB electrical permits | 11 | Installation of downlights No product keyword matched | 6 | Nov 4, 2026 |
| B | ALTO ELECTRIC INC NYC DOB electrical permits | 11 | new 200 amp service for both units of a 2 fam house No product keyword matched | 8 | Nov 4, 2026 |
| B | AMC ELEC'L SERVICES, INC. NYC DOB electrical permits | 11 | Access by appointment only. Please call 718-965-0809. Relocating (2) existing outlets in bedroom in apartment #27B. No product keyword matched | 9 | Nov 4, 2026 |
| B | TRITON ELECTRIC CORP. NYC DOB electrical permits | 11 | Remove and relocate kitchen cir cuts and general purpose receptacles for new kitchen layout. Apartment 14FG No product keyword matched | 3 | Nov 4, 2026 |
| B | LIFE SPOT ELECTRIC CORP NYC DOB electrical permits | 11 | GENERAL WIRING - T-MOBILE STOREFRONT No product keyword matched | 3 | Nov 4, 2026 |
| B | AMKRO ELECTRIC INC NYC DOB electrical permits | 11 | General wiring for 1 BR dwelling. New panel & feeder. Apt 5T No product keyword matched | 5 | Nov 4, 2026 |
| B | DURO ELECL CONTNG CORP NYC DOB electrical permits | 11 | Re-wire receptacles throughout combined apartments 3R and 4R No product keyword matched | 1 | Nov 4, 2026 |
| B | EVEREST ELECTRIC CORP NYC DOB electrical permits | 11 | OUTLET REPAIR FREEZER - KITCHEN - R023 No product keyword matched | 56 | Nov 4, 2026 |
| B | TRUE AMP ELECTRIC CORP NYC DOB electrical permits | 11 | Installing a 70 amp sub-panel, and hot water tanks No product keyword matched | 2 | Nov 4, 2026 |
| B | Thunderbolt Electric Inc NYC DOB electrical permits | 11 | Second-floor GSA / VA Veterans Treatment Center. Install lights, outlets and switches. No product keyword matched | 4 | Nov 4, 2026 |
| B | G&I ELECTRICAL CORP NYC DOB electrical permits | 11 | Apartment 8D Direct replacement of existing panel, 13 Light fixtures, 21 outlets and 10 switches No product keyword matched | 2 | Nov 4, 2026 |
| B | AUTHENTIC PLBG CORP NYC DOB building permits | 11 | Plumbing · Modification to existing plumbing fixtures and piping associated with minor apartment renovation. No change to occupancy, use or egress. No product keyword matched | 5 | Nov 3, 2026 |
| B | URBAN PATHWAYS, INC. NYC DOB building permits | 11 | Plumbing · Filing herewith for new gas piping at basement with connection to commercial cooking range and solenoid shut-off valve for interlock with Ansul system as per plans. No change in use, egress or occupancy under this application. No product keyword matched | 1 | Nov 3, 2026 |
| B | LEFRAK NYC DOB building permits | 11 | Plumbing · JOB FILED TO INSTALL COOKING EQUIPMENT AND PLUMBING FIXTURE AT EXISTING COMMERCIAL STORE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 25 | Nov 3, 2026 |
| B | Pristine Property Solutions NYC DOB building permits | 11 | Sprinklers · NEW SPRINKLER HEADS OFF EXISTING AUTOMATIC SPRINKLER SYSTEM IN EXISTING TENANT'S ACCESSORY USE LAUNDRY ROOM (CO #Q154713). ALL AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Nov 3, 2026 |
| B | GUARDIAN REALTY MANAGMENT NYC DOB building permits | 11 | General Construction · Interior Renovation of 4th Floor. No product keyword matched | 1 | Nov 3, 2026 |
| B | GX CONSTRUCTION MGMT INC NYC DOB building permits | 11 | Structural · THIS IS SUBSEQUENT FILING S6 OF Q01224169-I1, FOR EXCAVATION, FOUNDATION, STRUCTURAL & CONC. PAVEMENT WORK ONLY FOR ENLARGEMENT OF ONE FAMILY & ONE ADU RESIDENCE HOUSE. No product keyword matched | 11 | Nov 3, 2026 |
| B | BUILDOPS INC NYC DOB building permits | 11 | General Construction · GENERAL CONSTRUCTION INTERIOR RENOVATION OF AN EXISTING HEALTH AND FITNESS ESTABLISHMENT ON THE FIRST FLOOR AND CELLAR. INTERIOR PARTITIONS, FIXTURES, AND FINISHES. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Nov 3, 2026 |
| B | HMC TIMES SQUARE HOTEL LP NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 2 | Nov 3, 2026 |
| B | ERIN CONSTRUCTION & DEVEL NYC DOB building permits | 11 | Structural · Structural repairs for renovations as per plans filed herewith. No change in Use, Egress or Occupancy. No product keyword matched | 10 | Nov 3, 2026 |
| B | GAIL SHAW-REMINGTON NYC DOB building permits | 11 | Mechanical Systems · HEREBY FILING FOR THE DEMOLISHING OF ENTIRE MECHANICAL SYSTEMS AND REPLACING WITH NEW VRF DX SPLIT SYSTEM. NEW EXHAUST FANS WILL BE PROVIDED SERVING THE ENTIRE PROJECT. FILED IN CONJUNCTION WITH ALTERATION CO B00952495-I1. No product keyword matched | 4 | Nov 3, 2026 |
| B | SAI JI PLUMBING, INC NYC DOB building permits | 11 | Plumbing · Addition and alteration of one family house. Install new plumbing fixtures and related piping as per drawing. No product keyword matched | 1 | Nov 3, 2026 |
| B | 4524 SUNNYSIDE LLC NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR CONSTRUCTION WORK TO CLOSE UP OPENINGS FROM GAS PIPING AND TO REMOVE STOP WORK ORDER AND VIOLATION. No product keyword matched | 1 | Nov 3, 2026 |
| B | A&L ELECTRIC & AUTOMATION NYC DOB electrical permits | 11 | Electric wiring Apartment Rear No product keyword matched | 12 | Nov 3, 2026 |
| B | ACCURATE ELEC'L CONTR'S C NYC DOB electrical permits | 11 | NATIONAL GRID BUILDING 23 BATHROOM RENOVATION No product keyword matched | 8 | Nov 3, 2026 |
| B | RX ELECTRIC INC NYC DOB electrical permits | 11 | GENERAL WIRING (CANADA GOOSE-CELLAR, 1ST FLOOR & 2ND FLOOR) No product keyword matched | 9 | Nov 3, 2026 |
| B | WTG ELECTRIC INC. NYC DOB electrical permits | 11 | Furnish and install new dedicated power supply lines for the electrical oven in the apartments # 3A; 3B and 5B No product keyword matched | 5 | Nov 3, 2026 |
| B | EVS ELECTRIC CORP NYC DOB electrical permits | 11 | Full rehabilitation of 2 Family House Install 3 meters 2 for dwellings and 1 PLP total 3 meters MC-957630 3 100 A disconnect sw's 2 ranges 240 50 A 2 refrigerators120 V 20 A 2 D/W 120 V 20 A 2 washing mac's 120 V20 A install 50 HiHats 60 receptacles 25 switches No product keyword matched | 18 | Nov 3, 2026 |
| B | MSG ARENA, LLC NYC DOB electrical permits | 11 | BOYNEXTDOOR No product keyword matched | 40 | Nov 3, 2026 |
| B | EGG ELECTRIC INC. NYC DOB electrical permits | 11 | EGG JOB #2698 - NYP GP3 OR 20 - 3RD FLOOR No product keyword matched | 8 | Nov 3, 2026 |
| B | ALL-RITE ELECT CORP OF NY NYC DOB electrical permits | 11 | SUPPLY AND INSTALL A TWO METER UNDER GROUND 100 AMP SERVICE No product keyword matched | 8 | Nov 3, 2026 |
| B | SCIENTIFIC ELEC. CO. INC NYC DOB electrical permits | 11 | Installation of 100A enclosed circuit breaker for new solar system. No product keyword matched | 5 | Nov 3, 2026 |
| B | OM ELECTRIC, INC NYC DOB electrical permits | 11 | NEW SERVICE FOR THE BUILDING AS PER CON EDISON. PICK UP EXISTING METER BANKS. No product keyword matched | 14 | Nov 3, 2026 |
| B | TF ELECTRICAL CORP NYC DOB electrical permits | 11 | ELEVATORS: TWO (2) ELEVATORS AND ONE (1) WHEELCHAIR LIFT. ALL WORK AHEAD AND UP TO THE MAIN ELEVATOR DISCONNECT SWITCH IS FILED BY OTHERS. No product keyword matched | 25 | Nov 3, 2026 |
| B | SRM ELECTRICAL SVC INC NYC DOB electrical permits | 11 | Webster Bank Local Law 97 30th Ave- Lights No product keyword matched | 29 | Nov 3, 2026 |
| B | OSTRAVA ELECTRIC CORP NYC DOB electrical permits | 11 | install wiring for 3 new heaters No product keyword matched | 3 | Nov 3, 2026 |
| B | A.DAVINO ELEC'L CONT'G CO NYC DOB electrical permits | 11 | circuit for new oven No product keyword matched | 2 | Nov 3, 2026 |
| B | CAPUTEK ELEC'L SERVICES, NYC DOB electrical permits | 11 | ELECTRICAL WORK ASSOCIATED WITH DEVICE M01460768-403 No product keyword matched | 8 | Nov 3, 2026 |
| B | TRINITY ELECTRIC GROUP NYC DOB electrical permits | 11 | New 200 amp service. Installing new power and lighting throughout the space. No product keyword matched | 10 | Nov 3, 2026 |
| B | PLAZA ELEC'L CONTR'S. INC NYC DOB electrical permits | 11 | new power for a/c units No product keyword matched | 5 | Nov 3, 2026 |
| B | LAREDO ELECTRIC, INC. NYC DOB electrical permits | 11 | Replaced the 100 amp Con Ed service inbox that is rotted No product keyword matched | 15 | Nov 3, 2026 |