Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | PROMETHEAN BUILDERS LLC NYC DOB building permits | 11 | General Construction · IT IS PROPOSED TO RENOVATE THE EXTERIOR OF THE BUILDING FACADE AND PARTIALLY REPLACE A PORTION OF THE EXISTING ROOF. AS WELL AS RENOVATING THE EXISTING INTERIOR DEMISE SPACE INTO 3 SPACES, WITH MODIFICATIONS TO EGRESS. No product keyword matched | 6 | Nov 4, 2026 |
| B |
| ALAFOGIANNIS PLBG & HTG NYC DOB building permits |
| 11 |
Boiler Equipment · REPLACE FIVE (5) EXISTING GAS BOILERS (37624-01) WITH ONE (1) BOILER AND ONE (1) GAS BURNER. REPLACE THREE (3) HOT WATER GAS BOILERS (37624-02,03,04) WITH THREE (3) GAS-FIRED HOT WATER HEATERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 2 |
| Nov 4, 2026 |
| B | 2MO NYC DOB building permits | 11 | General Construction · INTERIOR ALTERATIONS AT UNIT 9B. No product keyword matched | 3 | Nov 4, 2026 |
| B | AXIS BUILDERS INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 9 | Nov 4, 2026 |
| B | LINDENWOOD VILLAGE SECTION B COOP C NYC DOB building permits | 11 | General Construction · LOCAL LAW 11 REPAIRS. MISCELLANEOUS ROOF & MASONRY REPAIRS. BALCONY WATERPROOFING & RESTORATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | 11 RIVERSIDE DRIVE CORP. NYC DOB building permits | 11 | General Construction · In unit 9SE on floor 9, removal of non-load bearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy. No product keyword matched | 1 | Nov 4, 2026 |
| B | VKW DESIGN INC NYC DOB building permits | 11 | Sign · PROPOSED INSTALLATION OF NON-ILLUMINATED, 3D SELF-ADHESIVE PVC/VINYL LETTERING AND GRAPHICS WITH THE WORDING HARUMI JAPANESE MART AND LOGO DIRECTLY ON THE EXISTING BUILDING SIGN-BAND. No product keyword matched | 21 | Nov 4, 2026 |
| B | STARLITE PLUMBING CORP NYC DOB building permits | 11 | Plumbing · TWO SPRINKLER HEADS OFF DOMESTIC WATER SERVICE No product keyword matched | 1 | Nov 4, 2026 |
| B | DUC DESIGN LLC NYC DOB building permits | 11 | General Construction · Interior and exterior renovation of existing row house (not a substantial improvement). Work on cellar, basement, 1st, 2nd, and 3rd floors, and roof. No change in use, egress, or occupancy. No product keyword matched | 3 | Nov 4, 2026 |
| B | SKY LINE BUILDERS USA INC NYC DOB building permits | 11 | General Construction · EXISTING 1 FAMILY BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK AT THE CELLAR,1ST,2ND FLOOR AND ATTIC UNDER THIS APPLICATION.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 3 | Nov 4, 2026 |
| B | AMS CONTRACTOR INC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 4, 2026 |
| B | URBAN INDUSTRIAL GROUP NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022. No product keyword matched | 2 | Nov 4, 2026 |
| B | 65TH ROAD DEVELOPMENT, LLC NYC DOB building permits | 11 | General Construction · FILING STRUCTURAL, FOUNDATION & EARTHWORK WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00497139 No product keyword matched | 4 | Nov 4, 2026 |
| B | Moonlight Woodwork, Inc. NYC DOB building permits | 11 | General Construction · Interior renovation and window replacement at cellar, 1-2nd floor. All as per plans submitted herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Nov 4, 2026 |
| B | LEGACY CONSTRUCTION GROUP NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION OF EXISTING 1-STORY COMMERCIAL BUILDING. MODIFY/INSTALL NEW PARTITIONS AS INDICATED; INSTALL NEW SUSPENDED CEILING, INSTALLATION OF FLOOR & WALL FINISHES. NO MODIFICATIONS TO EXISTING THERMAL ENVELOPE OR HVAC SYSTEM. No product keyword matched | 1 | Nov 4, 2026 |
| B | 151-161 Owners Corp NYC DOB building permits | 11 | Boiler Equipment · (1) NEW LOW PRESSURE BOILER. (1) NEW COMBINATION GAS/OIL BURNER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. No product keyword matched | 2 | Nov 4, 2026 |
| B | HP Park Lane Family HDFC, Inc. NYC DOB building permits | 11 | Protection and Mechanical Methods · Installation and use of temporary contractor's shanty as per plans filed herewith. This application is filed in conjunction with NB X01265022-I1. No product keyword matched | 1 | Nov 4, 2026 |
| B | II 529 BROADWAY MEMBER LLC NYC DOB building permits | 11 | General Construction · Partial decommissioning and demo of ex'g freight elevator stops and shaft between floors 3-5. New work includes non-structural partitions, and related structural/mep work for remaining constru No product keyword matched | 3 | Nov 4, 2026 |
| B | One Broadway Owner, LLC NYC DOB building permits | 11 | Sprinklers · Modification to existing plumbing and sprinkler as per plans filed herewith. Removal of plumbing fixures and sprinkler heads. No change in use, egress or occupancy. No product keyword matched | 4 | Nov 4, 2026 |
| B | JUDITH DRIVE LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 3 | Nov 4, 2026 |
| B | Meadowlark Gardens Corp NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTION FENCE FOR 196-18, 196-20, 196-22 69TH AVENUE. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 11 | Nov 4, 2026 |
| B | BRADLEY ASSOC OF SI INC NYC DOB building permits | 11 | Plumbing · exterior storm piping No product keyword matched | 3 | Nov 4, 2026 |
| B | FRANCO ACQUISITION LLC NYC DOB building permits | 11 | Plumbing · PLUMBING APPLICATION TO INSTALL NEW FURNACE UNIT, NEW HEATER IN FIRST FLOOR AND NEW HOT WATER HEATER IN MEZZANINE. NOT CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | 324 West 22nd Street Revokable Trus NYC DOB building permits | 11 | Supported Scaffold · Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 3 | Nov 4, 2026 |
| B | BAYSIDE FUEL OIL DEPOT CORP NYC DOB building permits | 11 | General Construction · Removal of two 4,000-gallon underground storage tanks with associated piping. No change to use, egress or occupancy. No product keyword matched | 4 | Nov 4, 2026 |
| B | ALWAYS FIRST INC. NYC DOB building permits | 11 | Construction Fence · Install fence in conjunction with New building application Q01390767-I1 as per plans No product keyword matched | 2 | Nov 4, 2026 |
| B | 75 ATLANTIC INC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION #340757498 No product keyword matched | 1 | Nov 4, 2026 |
| B | P & R CONSTR MGT NY CORP NYC DOB building permits | 11 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE. No product keyword matched | 1 | Nov 4, 2026 |
| B | SPACE AND STRUCTURE REALTY INC. NYC DOB building permits | 11 | General Construction · Filing only for demo of existing interior partitions/doors at cellar-001 as per plan.no change to use egress or occupancy. GC, MH,PL,SP for design to be filed separately All in conjunction to Alt1 121204856 where new C of O will be issued. No product keyword matched | 2 | Nov 4, 2026 |
| B | CHURCH OF THE INCARNATION NYC DOB building permits | 11 | General Construction · PROPOSED NEW CONCRETE ADA RAMP No product keyword matched | 2 | Nov 4, 2026 |
| B | Vanderbilt NYC APT INC NYC DOB building permits | 11 | General Construction · Interior renovation to combine Apartments 3J & 3H into one apartment, as per plans filed herewith. No product keyword matched | 1 | Nov 4, 2026 |
| B | TDC FC2 LLC NYC DOB building permits | 11 | Plumbing · NYC DEV HUB CONSULTATION CONDUCTED 7/13/2012: (BLDG E) PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING CONSTRUCTION No product keyword matched | 10 | Nov 4, 2026 |
| B | UNITED RESTORATION & DEVE NYC DOB building permits | 11 | Construction Fence · APPLICATION FILLING FOR PEREMPTORY CONSTRUCTION FENCE. No product keyword matched | 1 | Nov 4, 2026 |
| B | HARRY'S CONTRACTING INC NYC DOB building permits | 11 | Structural · FILING COMBINATION OF UNITS #2FE AND #2FW PER TPPN 3/97. ARCHITECTURAL AND STRUCTURAL MODIFICATIONS AS PER PLANS. PLUMBING FILED VIA LAA. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | Brass Property Group LLC NYC DOB building permits | 11 | Structural · Herewith Filing Temporary Shoring as outlined in plans to address Stop Work Order and Full Vacate Order, as directed by the DOB Construction Safety Enforcement Team. No change in use, egress or occupancy proposed under this application. No product keyword matched | 7 | Nov 4, 2026 |
| B | PGGL LLC NYC DOB building permits | 11 | Structural · Replacement of stairs at existing shaft wall, creating of new wall opening at existing masonry shaftwall, installation of floor and stair framing at new AV floor level. No product keyword matched | 8 | Nov 4, 2026 |
| B | TM CONSTRUCTION GROUP LLC NYC DOB building permits | 11 | General Construction · GENERAL CONSTRUCTION FOR PARTIAL RECONSTRUCTION OF RETAINING WALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | RITE WAY CONSTR GROUP COR NYC DOB building permits | 11 | General Construction · MINOR INTERIOR RENOVATION 1ST FLOOR COMMERCIAL SPACE WITH NEW PARTITIONS, NEW STOREFRONT, NEW AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | PROBUILDERO CORP NYC DOB building permits | 11 | Plumbing · Replacement of existing boiler and installation of new boilers. No product keyword matched | 2 | Nov 4, 2026 |
| B | St Peter's Chelsea NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | MANHATTAN HOUSE CONDOMINIUM NYC DOB building permits | 11 | Mechanical Systems · MODIFICATION OF DUCTWORK AND INSTALLATION OF (4) FAN COIL UNITS. No product keyword matched | 5 | Nov 4, 2026 |
| B | THE PHILIP GROUP CORP NYC DOB building permits | 11 | Structural · 1- Rear enlargment from basement to roof No product keyword matched | 4 | Nov 4, 2026 |
| B | S V PLBG & HTG INC NYC DOB building permits | 11 | Plumbing · SUBSEQUENT FILING FOR THE PLUMBING WORK RELATED TO FIRE DAMAGE REPAIR & RENOVATION OF EXISTING TWO STORY BUILDING No product keyword matched | 1 | Nov 4, 2026 |
| B | NEW SAHARA BUILDERS CORP NYC DOB building permits | 11 | Foundation · APPLICATION FILING TO PROVIDE BENCH FOOTING (STEP FOOTING) AND INSTALL MIDDLE BEAM WITH SUPPORTED COLUMN TO REINFORCE EXIST CELLAR SPACE AS PER PLAN TO RESOLVE ECB VIOLATION #: 39106704R, 35633030Z, 35633031. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 2 | Nov 4, 2026 |
| B | 17708 SAYRES LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH ALT CO APP# Q01402371 & 40254298. INSTALLATION OF ONE NEW BATHROOM ON THE FIRST FLOOR AND ONE SHOWER IN THE CELLAR. No product keyword matched | 1 | Nov 4, 2026 |
| B | MPS REALTY GROUP CORP NYC DOB building permits | 11 | General Construction · Facade Restoration No product keyword matched | 1 | Nov 4, 2026 |
| B | STEEL SEVEN LLC NYC DOB building permits | 11 | Plumbing · GAS CONNECTION TO REPLACEMENT HVAC UNITS. No product keyword matched | 3 | Nov 4, 2026 |
| B | BUDGET HOME RENOVATION NYC DOB building permits | 11 | General Construction · Interior renovation of existing dwelling unit including new interior partition wall, replacement kitchen cabinets, patch and paint all interior wall surfaces, sand and refinish existing hardwood flooring. All work per proposed plans submitted. No product keyword matched | 2 | Nov 4, 2026 |
| B | AMCL REALTY LLC NYC DOB building permits | 11 | Sprinklers · Fire Sprinkler plans filed herewith. No product keyword matched | 7 | Nov 4, 2026 |
| B | CALISTRO CONSTRUCTION CO NYC DOB building permits | 11 | General Construction · Facade repairs to include masonry, pointing, concrete patching, exterior coating, sills, lintels, secure railings, caulking, scrape, prime and paint exposed steel, and replacement of roof membrane at main and bulkhead roofs. No product keyword matched | 3 | Nov 4, 2026 |