Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MKA GENERAL CONSTRUCTION INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 4 | Nov 4, 2026 |
| B | THE PALINDROME CORP |
| 11 |
General Construction · Repair of living room ceiling at 4th floor apartment #4B. No product keyword matched |
| 1 |
| Nov 4, 2026 |
| B | DIESEL CONTRACTING OF N.Y NYC DOB building permits | 11 | General Construction · Combine apartment 3 & 4 on 3rd floor. No change in use, egress or occupancy. No product keyword matched | 2 | Nov 4, 2026 |
| B | PROTON CCM LLC NYC DOB building permits | 11 | Mechanical Systems · FILED MECHANICAL WORK TO INSTALL NEW A/C UNITS FOR EXIST. COMMERCIAL SPACES IN A MIXED-USE BUILDING, WORK ON 1ST FLOOR AND CELLAR ONLY. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | COHEN BROTHERS REALTY CORP NYC DOB building permits | 11 | General Construction · Interior renovation of exisitng UG6 Easting and drinking establishment as per plan. Removal of interior finishes and, interior construction and new door on storefront as per plan. No change to use, egress or occupancy under this application. No product keyword matched | 6 | Nov 4, 2026 |
| B | Coppermine Construction Inc. NYC DOB building permits | 11 | Mechanical Systems · Application filed for HVAC units and associated ductwork as per plans No product keyword matched | 12 | Nov 4, 2026 |
| B | Terreno Airgate LLC C/O Avison Youn NYC DOB building permits | 11 | Plumbing · REPLACE (1) ROOFTOP HVAC UNIT. No product keyword matched | 6 | Nov 4, 2026 |
| B | SRT NOSTRAND LLC NYC DOB building permits | 11 | General Construction · Proposed vertical enlargement to an existing 1-story + cellar community facility building, converting to a 2-story + cellar community facility building. No product keyword matched | 5 | Nov 4, 2026 |
| B | 1515 LLC NYC DOB building permits | 11 | Plumbing · Filing Plumbing plans in conjunction with NB B00703170-I1 No product keyword matched | 2 | Nov 4, 2026 |
| B | ASHLAND PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Plumbing work associated with building renovation. Work to include removal of fixture and related piping, new plumbing fixtures and piping as per plans filed herewith. No product keyword matched | 4 | Nov 4, 2026 |
| B | FT CONSTRUCTION VENTURE NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION AT UNIT #2D AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAITON. No product keyword matched | 2 | Nov 4, 2026 |
| B | MNB Developers NYC DOB building permits | 11 | Structural · HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION OF AN EXISTING 1 FAMILY DWELLING (PARTIAL 3 STORY FRONT AND 2 STORY REAR) TO A FULL 3 STORY AND CELLAR 1 FAMILY DWELLING.AS PER PLANS SHOWN.OBTAIN NEW C.O.F. No product keyword matched | 8 | Nov 4, 2026 |
| B | 123 MILTON LLC NYC DOB building permits | 11 | Structural · PROPOSED REAR ADDITION ,EXTERIOR WINDOWS /DOOR REPLACEMENT TO ONE FAMILY,2 STORY BUILDING WITH CELLAR. ( INTERIOR ALTERATIONS THROUGHOUT FILED UNDER PRO-CERT APPLICATION # B01354308-I1 No product keyword matched | 2 | Nov 4, 2026 |
| B | BHA CONSULTANTS LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 4, 2026 |
| B | WINSON CONSTRUCTION INC NYC DOB building permits | 11 | Plumbing · Plumbing (PL) application filed in connection with the construction of an 8-story residential building containing 23 dwelling units under Job No. Q01154656-I1. No product keyword matched | 8 | Nov 4, 2026 |
| B | 34-20 JUNCTION DM LLC NYC DOB building permits | 11 | General Construction · NB filed to construct a new 13 story with cellar mixed use building of residential and commercial uses. No product keyword matched | 3 | Nov 4, 2026 |
| B | 1040 AVENUE OF THE AMERICAS, LLC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 4, 2026 |
| B | ELITE PROPERTIES NYC LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF (2) FAMILY HOUSE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 2 | Nov 4, 2026 |
| B | FETNER PROPERTIES NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 3 | Nov 4, 2026 |
| B | BLACK STEEL DEVELOPERS NYC DOB building permits | 11 | Earth Work · FOUNDATION EARTHWORK FILED HEREWITH IN CONJUNCTION WITH B01285363-I1 No product keyword matched | 18 | Nov 4, 2026 |
| B | 83 MADISON HOLDINGS LLC NYC DOB building permits | 11 | Mechanical Systems · Proposed construction of the 8 stories mixed use building with 18 residential units and 2 community facility units No product keyword matched | 3 | Nov 4, 2026 |
| B | ARCON SOLUTIONS LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION TO COMBINE EXISTING RESIDENTIAL CONDOMINIUM UNITS 10A AND 10B INTO ONE DWELLING UNIT. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 4, 2026 |
| B | KBA HOME IMPROVEMENT INC NYC DOB building permits | 11 | General Construction · Interior renovation of house by removing exist finish materials on the floors, walls and ceilings and install new. No change of use, egress, number of rooms or occupancy unsr this application. One family House. No product keyword matched | 2 | Nov 4, 2026 |
| B | CARPEX INC NYC DOB building permits | 11 | General Construction · REPLACEMENT OF EXISTING CORNICE WITH NEW TO MACH THE EXISTING IN PROFILE, DESIGN, DIMENSIONS AND DETAILING. NO CHANGE TO USE OCCUPANCY OR EGRESS.. No product keyword matched | 3 | Nov 4, 2026 |
| B | I & N BUILDERS LLC NYC DOB building permits | 11 | General Construction · THE APPLICATION IS FOR THE ALTERATION OF UNIT 2 AT THE 2ND, 3RD FLOORS; :REMOVING AND ADDING NON-LOAD-BEARING PARTITIONS IN SOME LOCATIONS. (TOTAL APT. SF IS 2400 SF AREAS OF WORK 900 SF). NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | Woodside YR Corp NYC DOB building permits | 11 | General Construction · MINOR INTERIOR RENOVATION TO THE FIRST FLOOR COMMERCIAL STORE AS PER PLAN, INCLUDING THE INSTALLATION OF NEW AC UNITS ON THE ROOF. NO CANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | RANDAZZO CONSTRUCTION GROUP LLC NYC DOB building permits | 11 | Plumbing · Plumbing work is filed. No product keyword matched | 1 | Nov 4, 2026 |
| B | BAY RIDGE PREPARATORY SCHOOL NYC DOB building permits | 11 | General Construction · PROVIDE NEW INTERIOR PARTITIONS AND DOORS, FLOOR AND CEILING FINISHES, LIGHTING, MECH VENTILATION, AND PLUMBING FIXTURES AND ACCESSORIES AS NECESSARY TO CREATE NEW BATHROOMS AS SHOWN ON DRAWINGS FILED HEREWITH. No product keyword matched | 5 | Nov 4, 2026 |
| B | H&Z BUILDING NY CORP. NYC DOB building permits | 11 | General Construction · PROPOSED 6 STORY BUILDING WITH CELLAR FOR RESIDENTIAL AND COMMUNITY FACILITY MIXED USE WITH VERTICAL AND HORIZONTAL ENLARGEMENT. OBTAIN NEW C OF O. No product keyword matched | 1 | Nov 4, 2026 |
| B | NIRO INC NYC DOB building permits | 11 | Construction Fence · PROP. 8 FT. HIGH CHAIN LINK FENCE & ACCESS GATES ALONG PROPERTY LINES AND CONSTRUCTION ZONE LIMIT, PURSUANT TO BC 3307.7 & BB 2009-010 IN CONJUNCTION WITH NEW ONE-FAMILY BUILDING TO BE CONSTRUCTED ON THIS LOT FILED AND APPROVED UNDER DOB # 520359585 No product keyword matched | 2 | Nov 4, 2026 |
| B | BLONDIES TREEHOUSE, INC NYC DOB building permits | 11 | General Construction · Herewith filing general construction application as per plans submitted. No change in use, egress or occupancy. No product keyword matched | 1 | Nov 4, 2026 |
| B | AK & Sons Restoration Corp NYC DOB building permits | 11 | Supported Scaffold · INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 3 | Nov 4, 2026 |
| B | LIME STONE BUILDERS INC NYC DOB building permits | 11 | Structural · INTERIOR RENOVATION OF APARTMENTS AND MINOR REPAIR OF REAR EXTERIOR WALL FOR EXISTING 6-STORY BUILDING AS PER PLAN. REMOVE ECB VIOLATION # 39205249H AND 39205342M, NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Nov 4, 2026 |
| B | 2A MECHANICAL INC NYC DOB building permits | 11 | Sprinklers · Provide new plumbing and sprinkler system in conjunction with NB# X01298827. No product keyword matched | 3 | Nov 4, 2026 |
| B | CASINO PLMBG & HTG CORP NYC DOB building permits | 11 | Sprinklers · ADD FIVE NEW SPRINKLER HEADS, REMOVE THREE HEADS, RELOCATE TWO HEADS AND REPLACE EXISTING HEADS WITH CONCEALED TYPE. No product keyword matched | 1 | Nov 4, 2026 |
| B | DNP BUILDERS LLC NYC DOB building permits | 11 | General Construction · PHOTO STUDIO-- GENERAL CONSTRUCTION INCLUSIVE OF MODIFICATIONS TO INTERIOR PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Nov 4, 2026 |
| B | 2801 CODDINGTON AVE CORP NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION TO SECOND FLOOR APARTMENT AND TO COMPLY WITH VIOLATION NUMBER 39193750X No product keyword matched | 1 | Nov 4, 2026 |
| B | ADDISON PLBG AND HTG CORP NYC DOB building permits | 11 | Plumbing · Plumbing changes on the cellar and 1st floor as indicated on drawings. No product keyword matched | 1 | Nov 4, 2026 |
| B | VIANNA CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · APPLICATION HEREWITH FILED FOR NEW DOOR OPENING AT 2ND FL AND NEW ACCESSORY EXTERIOR STAIR TO CREATE A SECOND MEANS OF EGRESS FROM THE SECOND FLOOR TO THE REAR YARD. NO CHANGE IN OCCUPANCY, BULK, USE OR EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | ANSONIA ASSOCIATES LP NYC DOB building permits | 11 | Sprinklers · ANSONIA ENDOSCOPY ASC RENOVATION - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 6 | Nov 4, 2026 |
| B | NY CREATIVE DEVELOPERS INC NYC DOB building permits | 11 | General Construction · PROPOSED SIX (6) STORY RESIDENTIAL BUILDING. No product keyword matched | 3 | Nov 4, 2026 |
| B | 12 WEST 27TH STREET ASSOCIATES LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK TO 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Nov 4, 2026 |
| B | 77081C4F1B1BFF0012974225BD4BCB4F NYC DOB building permits | 11 | Mechanical Systems · Interior rehabilitation of all floors of an existing 2-family home and legalize a one story extension. No change of use, egress or occupancy under this application No product keyword matched | 1 | Nov 4, 2026 |
| B | ELITE BUILDERS TEAM LLC NYC DOB building permits | 11 | General Construction · HORIZONTAL & VERTICAL ENLARGEMENT OF EXISTING SINGLE FAMILY HOME. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Nov 4, 2026 |
| B | REDI-CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · Renovation of existing bathrooms, minor modifications to layouts within existing bathroom areas. General refinishing of bathrooms. No product keyword matched | 2 | Nov 4, 2026 |
| B | H HOTEL LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Nov 4, 2026 |
| B | N.B.A CONSTRUCTION INC NYC DOB building permits | 11 | Sidewalk Shed · Permit for temporary sidewalk shed. No change in use, occupancy or egress. No product keyword matched | 4 | Nov 4, 2026 |
| B | ASTRAL WEEKS NYC DOB building permits | 11 | Suspended Scaffold · IRA to assist with Condition Assessment No product keyword matched | 2 | Nov 4, 2026 |
| B | JRL SKYLINE INC NYC DOB building permits | 11 | General Construction · PROPOSED 6 STORY MIX-USE BUILDING WITH PENTHOUSE. OBTAIN NEW COF O. No product keyword matched | 1 | Nov 4, 2026 |
| B | YEP GROUP INC NYC DOB building permits | 11 | General Construction · PROPOSE A NEW DETACHED 1-STORY, 1-FAMILY MODULAR HOUSE. No product keyword matched | 1 | Nov 4, 2026 |