Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | TACONIC PARTNERS NYC DOB building permits | 7 | Standpipe · Sprinkler/Standpipe in conjunction with new building. No product keyword matched | 0 | Dec 2, 2025 |
| C | LAZARUS REALTY NYC DOB building permits | 7 | General Construction · Filing for limited garage repairs, re-pointing of eroded masonry joint, repair cracked concrete in various locations, repair loose or cracked concrete with concrete repair mortar. No change to use, egress, or occupancy. |
| 0 |
| Dec 2, 2025 |
| C | 2365 82NDST LLC NYC DOB building permits | 7 | General Construction · RENOVATION OF EXIST. RESIDENTIAL HOUSE, REPAIR/REPLACE/NEW PARTITION, DOOR, CEILING, FLOOR, STAIR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 2, 2025 |
| C | MASTER ORGANIZATION INC NYC DOB building permits | 7 | Plumbing · Proposed plumbing work No product keyword matched | 0 | Dec 2, 2025 |
| C | 3308 REALTY LLC NYC DOB building permits | 7 | Plumbing · Disconnecting and reconnecting existing gas piping to new non-emergency generator on the roof. No change in use, egress or occupancy. No product keyword matched | 0 | Dec 2, 2025 |
| C | WILLIAM ROBERSTON NYC DOB building permits | 7 | General Construction · DIRECT WINDOW REPLACEMENT AT ALL FLOORS (TYP. THROUGHOUT) No product keyword matched | 0 | Dec 2, 2025 |
| C | BLUM NYC DOB building permits | 7 | Sprinklers · FILING FOR SPRINKLER SCOPE AS PER PLANS No product keyword matched | 0 | Dec 2, 2025 |
| C | THE URBAN JUNGLE CORP. NYC DOB building permits | 7 | Plumbing · PROVIDE GAS PIPING AND GAS METER FOR (7) GAS FIRED UNIT HEATERS AND (1) GAS FIRED DOMESTIC WATER HEATER. TIE INTO EXISTING GAS SERVICE AND GAS SERVICE VALVE. No product keyword matched | 0 | Dec 2, 2025 |
| C | MANHATTAN CHRISTIAN GATHERING INC. NYC DOB building permits | 7 | General Construction · Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to be filed as subsequent applications. No product keyword matched | 0 | Dec 2, 2025 |
| C | LUMINOUS CONDO LLC NYC DOB building permits | 7 | General Construction · Interior demo No product keyword matched | 0 | Dec 2, 2025 |
| C | PARADISE CONSTRUCTION GRO NYC DOB building permits | 7 | Structural · SUBSEQUENT FILING FOR STRUCTURAL WORKS WITH NEW CONCRETE FOOTINGS FOR EXISTING COLUMNS AT CELLAR, A NEW SLAB-ON-GRADE AT CELLAR, AND NEW WOOD POSTS AND LVL BEAMS AT PROPOSED OPENING IN BASEMENT. No product keyword matched | 0 | Dec 2, 2025 |
| C | METRODESIGN REMODELING C NYC DOB building permits | 7 | Mechanical Systems · INSTALLATION OF NEW STAIR ON 3RD FL, REPLACE SKYLIGHT AND ADD BULKHEAD ON THE ROOF, HVAC UNITS INSTALLATION AND ASSOCIATED STRUCTURAL WORK FOR THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 2, 2025 |
| C | CHAYALAS MIKVA INC NYC DOB building permits | 7 | Construction Fence · CONSTRUCTION FENCE WORK TYPE DURING THE CONSTRUCTION OF THE HORIZONTAL EXTENSION OF TWO STORIES AND CELLAR DWELLING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. No product keyword matched | 0 | Dec 2, 2025 |
| C | BROTHERS LEGACY CUSTOMS NYC DOB building permits | 7 | General Construction · MINOR INTERIOR RENOVATIONS IN EXISTING APARTMENT #14G, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 2, 2025 |
| C | Chapiyork Deli Grocery & Restaurant NYC DOB building permits | 7 | Plumbing · FILING TO INSTALL DELI KITCHEN COOKING EQUIPMENTS AND PLUMBING FIXTURES AS PER PLANS. No product keyword matched | 0 | Dec 2, 2025 |
| C | DYKER AND BROOKLYN NY INC NYC DOB building permits | 7 | General Construction · Install new partition, sinks, equipment and tables for dining area and commercial kitchen which is associated to the restaurant on cellar and 1st floor, add kitchen hood ventilation for commercial kitchen at cellar No product keyword matched | 0 | Dec 2, 2025 |
| C | KING STAR REALTY INC NYC DOB building permits | 7 | Plumbing · FILING TO INSTALL (4) BOILERS AND (4) HOT WATER HEATERS No product keyword matched | 0 | Dec 2, 2025 |
| C | A.C.& H. MAINTENANCE CORP NYC DOB building permits | 7 | Mechanical Systems · Installation of mechanical units on Basement, 001 - 003 floors and installation of 2 condensing units on the roof with associated ductwork. Mechanical work. No change in use, occupancy or egress. No product keyword matched | 0 | Dec 2, 2025 |
| C | ALVIN AILEY DANCE FOUNDATION NYC DOB building permits | 7 | Suspended Scaffold · IRA to assist with condition assessment. No product keyword matched | 0 | Dec 2, 2025 |
| C | DIFY RENOVATIONS INC. NYC DOB building permits | 7 | Structural · APPLICATION IS FILED FOR NEW THREE-STORY PER CODE (TWO-STORY PER ZONING), TWO FAMILY DETACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. ALL WORK AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 0 | Dec 2, 2025 |
| C | DAVID CONSTRUCTING NY INC NYC DOB building permits | 7 | Construction Fence · ERECT 300' OF WOOD CONSTRUCTION FENCE TO ENCLOSE SITE No product keyword matched | 0 | Dec 2, 2025 |
| C | PERFORMANCE MECHANCIAL NYC DOB building permits | 7 | Mechanical Systems · MECHANICAL MODIFICATIONS (HVAC REPLACEMENT) AT CHASE BANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 2, 2025 |
| C | L.S. ELECTRIC CORP NYC DOB electrical permits | 7 | Complete rewiring of 2nd and 3rd floor Apartments.New Circuit breaker panels and Risers to Cellar. No product keyword matched | 0 | Dec 2, 2025 |
| C | TRUE POWER ELECL CONT LLC NYC DOB electrical permits | 7 | Filling to add Basement Floor for Application X00682848-S1-EL No product keyword matched | 0 | Dec 2, 2025 |
| C | MADISON SQUARE BOYS & GIRLS CLUB NYC DOB building permits | 7 | Sidewalk Shed · Installation of emergency heavy duty sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Dec 1, 2025 |
| C | FLINT MECHANICAL CORP NYC DOB building permits | 7 | Plumbing · APPLICATION HEREWITH FILED FOR PLUMBING WORK IN CONJUNCTION WITH X01001050-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Dec 1, 2025 |
| C | TUEL ENTERPRISES, INC NYC DOB building permits | 7 | Curb Cut · 18' TOTAL CURB CUT No product keyword matched | 0 | Dec 1, 2025 |
| C | BO CONSTRUCTION NYC DOB building permits | 7 | Curb Cut · THIS JOB APPLICATION IS TO BE FILED IN CONJUCTION WITH 10 SARATOGA WAY - NB# S00777985-I1 , 12 SARATOGA WAY - NB# S00777986-I1 , 24 CHURCH AVENUE - NB# S00777990-I1 No product keyword matched | 0 | Dec 1, 2025 |
| C | WANKO WIDOWS INC. NYC DOB building permits | 7 | Solar · INSTALLATION OF SOLAR PANELS, ROOFTOP,RAILED, GRID-TIED, 19 MODULES, 7.79KW No product keyword matched | 0 | Dec 1, 2025 |
| C | KINGSLAND SERVICE STATION NYC DOB building permits | 7 | Solar · Installation of PV System on existing rooftop. No changes to Egress or use of occupancy. No product keyword matched | 0 | Dec 1, 2025 |
| C | BRAZING MECHANICAL NYC DOB building permits | 7 | Sign · ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 1, 2025 |
| C | HALBOR REALTY CO LLC NYC DOB building permits | 7 | General Construction · LIMITED FACADE REPAIRS. REPAIR OF DETERIORATED BRICKWORK AND MORTAR JOINTS No product keyword matched | 0 | Dec 1, 2025 |
| C | KIMS MAINT SERVICES CORP NYC DOB building permits | 7 | General Construction · REPAIR AND REPOINT EXISTING BRICK VENNER WALL AND . NO CHANGE IN USE, OCCUPANCY AND MEANS OFEGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Dec 1, 2025 |
| C | MANHATTAN BIBLE CHURCH NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION TO CREATE VERTICAL PLATFORM LIFT AREA. ALL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 1, 2025 |
| C | PHARMALOGIC HOLDINGS NYC DOB building permits | 7 | General Construction · Filing herewith for general construction as per plans submitted. No change in occupancy, use, or egress. No product keyword matched | 0 | Dec 1, 2025 |
| C | SR CAPITAL, LLC NYC DOB building permits | 7 | Mechanical Systems · Replace/upgrade existing HVAC system. Includes removal and in-kind replacement of equipment, modifications to adapt new equipment and structural work for condenser support. No change to occupancy/use, egress or fire-protection under this application. No product keyword matched | 0 | Dec 1, 2025 |
| C | LIBERTY REALTY NYC DOB building permits | 7 | Antenna · Modification to existing VERIZON site on the roof. Install 1 sector (3 antennas), 2 antennas, 6 RRH units, 3 OVP's, 2 cabinets and 2 GPS antennas. Replace 2 antennas & 2 RRH units. Relocate 1 antenna & 2 GPS antennas. Remove 2 cabinets. No product keyword matched | 0 | Dec 1, 2025 |
| C | 1431 ASSOCIATES LLC NYC DOB building permits | 7 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/ repair. No product keyword matched | 0 | Dec 1, 2025 |
| C | CHERICO KING ARCHITECT, P.C. NYC DOB building permits | 7 | Mechanical Systems · Installation of type-2 exhaust hoods and relocation of existing AC ductwork & diffusers No product keyword matched | 0 | Dec 1, 2025 |
| C | FERNANDEZ HEATING & MECHANICAL CORP NYC DOB building permits | 7 | Boiler Equipment · Boiler equipment filing for high pressure boiler for the dry cleaner steam processing. Related GC work for boiler room and for drycleaner fit out at first floor under B01083170-S2. No product keyword matched | 0 | Dec 1, 2025 |
| C | HOME CENTRAL DESIGN INC NYC DOB building permits | 7 | General Construction · Herewith filing for interior demo and build out of apt 2D. No change in Use, Egress or occupancy. No product keyword matched | 0 | Dec 1, 2025 |
| C | GARDEN HILL PROPERTIES NYC DOB building permits | 7 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH ALTERATION #B001163319-I1. NEW AND RELOCATED PLUMBING FIXTURES ON 2ND & 3RD FLOORS AS PER PLANS. No product keyword matched | 0 | Dec 1, 2025 |
| C | E&V Building LLC NYC DOB building permits | 7 | General Construction · Amendment to interior partition layout in existing 2nd floor B occupancy No product keyword matched | 0 | Dec 1, 2025 |
| C | PO DESIGN CREATION CORP NYC DOB building permits | 7 | General Construction · File interior renovation at 6th floor apartment 6C for General Construction with subsequent filing of (PL:M01300849-S1, MS:M01300849-S2) no change of use, egress, or occupancy No product keyword matched | 0 | Dec 1, 2025 |
| C | FOUR STAR BUSINESS GROUP NYC DOB building permits | 7 | Construction Fence · TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB APPLICATION#321705080 No product keyword matched | 0 | Dec 1, 2025 |
| C | AV BRAD CONSTRUCTION LLC NYC DOB building permits | 7 | General Construction · INTERIOR AND ROOF RENOVATION FOR TOWNHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE OR OCCUPANCY. No product keyword matched | 0 | Dec 1, 2025 |
| C | TRINITY SCHOOL NYC DOB building permits | 7 | Mechanical Systems · FILING HEREWITH MECHANICAL WORK AS PER PLANS, No product keyword matched | 0 | Dec 1, 2025 |
| C | HQ FIRE PROTECTION INC NYC DOB building permits | 7 | Standpipe · Sprinkler/Standpipe work in conjunction with NB # B00645411. No product keyword matched | 0 | Dec 1, 2025 |
| C | W & B ELECTRIC CORP. NYC DOB electrical permits | 7 | Owner no longer lives at premise so requesting a PLP meter for Public area's No product keyword matched | 0 | Dec 1, 2025 |
| C | ARTHUR CZECH NYC DOB building permits | 7 | General Construction · REPLACE TUB WITH STALL SHOWER, REPLACE TUB WITH WASHING MACHINE INENTRY BATHROOM, NON STRUCTURAL INTERIOR PARTITIONS AS INDICATED.NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Nov 30, 2025 |