Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Gramercy Griocerfy NYC DOB building permits | 11 | General Construction · Proposed alteration to 1st floor to create Retail Supermarket place, including demolition and installation of interior non-bearing partitions, fixtures, finishes, cabinetry, casework and plumbing sprinkler, mechanical and electrical modification. Filed N No product keyword matched | 1 | Nov 4, 2026 |
| B |
| THE ALBERONA GROUP INC NYC DOB building permits |
| 11 |
Mechanical Systems · FILING HEREWITH MECHANICAL SYSTEMS RENOVATION FOR 1 FAMILY HOUSE AS PER PLANS. No product keyword matched |
| 1 |
| Nov 4, 2026 |
| B | BOULEVARD TOGETHER DEVELOPER LLC NYC DOB building permits | 11 | Mechanical Systems · Repositioning of existing smoke purge fan. No product keyword matched | 6 | Nov 4, 2026 |
| B | SOHO CONSTRUCTION MANAGEM NYC DOB building permits | 11 | General Construction · ALTERATION TYPE 2 NEW FRONT FACADE. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 2 | Nov 4, 2026 |
| B | KGCJ DEVELOPMENT CORP NYC DOB building permits | 11 | Plumbing · PLUMBING APPLICATION BEING FILED FOR NEW BUILDING. No product keyword matched | 5 | Nov 4, 2026 |
| B | KEW MANAGEMENT CORP NYC DOB building permits | 11 | Boiler Equipment · REMOVE EXISTING FUEL STORAGE TANK AS PER PLANS. No product keyword matched | 1 | Nov 4, 2026 |
| B | R&S CONST. CONTRACT. INC NYC DOB building permits | 11 | Structural · PARTIAL SAW-CUT DEMOLITION OF EXISTING 8 CONCRETE SLAB AT LOCATION OF EXISTING STAIR OPENING.- INFILL EXISTING STAIR OPENING WITH CONCRETE PER PLANS AND PROVIDE STEEL ANGLE SUPPORT ALONG NEW AND EXISTING EDGES. No product keyword matched | 2 | Nov 4, 2026 |
| B | VOLUNTEERS OF AMERICA-GNY, INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Nov 4, 2026 |
| B | WAHLER PLACE,LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE FOR THE DEMOLITION OF THE EXISTING GARAGE AT 60 GAR PERRY AVENUE AND THE CONSTRUCTION OF (2) NEW SEMI-DETACHED RESIDENCES LOCATED AT 60A AND 60B PERRY AVENUE. No product keyword matched | 2 | Nov 4, 2026 |
| B | HUNT B CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · APPLICATION #Q01219095-I1 FILE TOCOMPLETED APPLICATION #ALT 144-55WHICH WAS APPROVED PERMIT ISSUEJOB COMPLETED INSPECTED BUT NOTSIGN-OFFPROP.MINOR INTERIOR RENOVATIONAND REPLACE WINDOW No product keyword matched | 4 | Nov 4, 2026 |
| B | AARCO CONTRACTING LLC NYC DOB building permits | 11 | General Construction · PROPOSED OF STONE MOLDING REPLACE TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 4, 2026 |
| B | HEARTFELT TOWNHOUSE BUILD NYC DOB building permits | 11 | Foundation · FOUNDATION FILED IN CONJUNCTION WITH NB JOB NUMBER Q01297609-I1. No product keyword matched | 30 | Nov 4, 2026 |
| B | NEW WAVE DESIGN & CONTRAC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF THE CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 6 | Nov 4, 2026 |
| B | HARBOR GROUP MANAGEMENT COMPANY NYC DOB building permits | 11 | Sprinklers · Modifications to the existing Sprinkler system on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. No product keyword matched | 11 | Nov 4, 2026 |
| B | 1447 W 5TH KTD LLC NYC DOB building permits | 11 | Sprinklers · FILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#B01063719 No product keyword matched | 4 | Nov 4, 2026 |
| B | B CONTRACTORS GROUP LLC NYC DOB building permits | 11 | General Construction · ALT - GC work type hereby filed for Model apartment and a leasing office apartment units 602, 703 and 804. No product keyword matched | 34 | Nov 4, 2026 |
| B | RUN RITE MECHANICAL CORP NYC DOB building permits | 11 | Mechanical Systems · Proposed replacement of two Condensers on Mechanical roof and 4 Air handlers in the unit PHA on 7th floor No product keyword matched | 1 | Nov 4, 2026 |
| B | REFCO MANAGEMENT NYC DOB building permits | 11 | General Construction · Facade restoration and interior restoration work. No change in use, egress or occupancy. No product keyword matched | 2 | Nov 4, 2026 |
| B | BSC HOUSING COMPANY, INC NYC DOB building permits | 11 | General Construction · REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, POURING OF NEW CONCRETE WALKWAY & ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS No product keyword matched | 12 | Nov 4, 2026 |
| B | YNR CONSTRUCTION LLC NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR THE RENOVATION OF AN EXISTING MULTI-FAMILY DWELLING. NO OTHER WORK PROPOSED UNDER THIS APPLICATION. No product keyword matched | 8 | Nov 4, 2026 |
| B | CORNERSTONE MANAGEMENT SYSTEMS NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 4, 2026 |
| B | 15-17 EAST 77TH STREET LLC NYC DOB building permits | 11 | Sprinklers · Filing temporary loop application for a single-family home. No change to use, egress or occupancy. No product keyword matched | 9 | Nov 4, 2026 |
| B | PLATINUM REALTY ASSOCIATES NYC DOB building permits | 11 | Mechanical Systems · APPLICATION FILED TO INSTALL KITCHEN EXHAUST SYSTEM (HOOD,DUCTWORK, AND EXHAUST FAN) FOR KITCHEN SPACE IN THE FIRST FLOORAS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THEFDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 5 | Nov 4, 2026 |
| B | 58-60 READE STREET CONDO NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | FSI NYC DOB building permits | 11 | General Construction · Facade repairs to include masonry, pointing, lintels, sills, coping stones, cornice repair, parapet replacement, caulking, scrape, prime and paint fire escapes and exposed street, main roof replacement (roof deck to remain). No product keyword matched | 3 | Nov 4, 2026 |
| B | BROOKLYN COMMUNITY CHRISTIAN CHURCH NYC DOB building permits | 11 | Mechanical Systems · REPLACED EXISTING HVAC UNIT WITH NEW HVAC UNIT FOR CHURCH SUNDAY SCHOOL, AND INSTALL NEW ERV UNIT IN FIRST FLOOR, no change in use, egress or occupancy No product keyword matched | 1 | Nov 4, 2026 |
| B | DOUGLASTON REALTY NYC DOB building permits | 11 | Plumbing · INTERIOR RENOVATIONS OF 4TH FLOOR APARTMENTS 4H AND 4J IN AN EXISTING SIX STORY RESIDENTIAL BUILDING. WORK TO INCLUDE NEW NON-STRUCTURAL INTERIOR PARTITIONS, REPLACEMENT OF PLUMBING FIXTURES AND KITCHEN APPLIANCES KITCHEN CABINETRY, TRIM, AND FINISHES No product keyword matched | 15 | Nov 4, 2026 |
| B | BUILTRIGHT BUILDERS LLC NYC DOB building permits | 11 | General Construction · ALTERATION TYPE 2 PATCH AND REPAIR FRONT FACADE AND REPLACE WINDOWS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | KRAMER ENTERPRISES INC. NYC DOB building permits | 11 | Curb Cut · 10' TOTAL CURB CUT No product keyword matched | 14 | Nov 4, 2026 |
| B | JAYDEN ESTATES,INC NYC DOB building permits | 11 | Curb Cut · 9' TOTAL CURB CUT No product keyword matched | 6 | Nov 4, 2026 |
| B | Vanderbilt University NYC DOB building permits | 11 | Foundation · HOFFMAN HALL - FOUNDATION FOR NEW STAIR AND HANDICAP RAMPS IN THE OPEN SPACE WITHIN THE PROPERTY LINE AT THE BACK ENTRANCE OF THE BUILDING. ADDITIONAL DETAILS INDICATED IN THE COMMENTS BOX BELOW. No product keyword matched | 4 | Nov 4, 2026 |
| B | ARISTA PLBG & HTG CORP NYC DOB building permits | 11 | Plumbing · New (3) fixture bathroom and relocaiton (1) Lav, (1) washing machine and relocate associated gas pipes. No product keyword matched | 5 | Nov 4, 2026 |
| B | SAFECO GROUP CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALL HEAVY-DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS FOR OVERHEAD PROTECTION. REMOVE & REPLACE VINYL SIDING. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 13 | Nov 4, 2026 |
| B | GORJIAN REAL ESTATE GROUP NYC DOB building permits | 11 | Mechanical Systems · Mechanical work filed in conjunction with the restaurant renovation as per plan. No change in use, egress, or occupancy under this application No product keyword matched | 3 | Nov 4, 2026 |
| B | PETERS CONSTRUCTION GROUP NYC DOB building permits | 11 | Mechanical Systems · INSTALL 2 DUCTLESS MINI-SPLIT, MULTI-ZONE AIR CONDITIONING SYSTEMS. No product keyword matched | 2 | Nov 4, 2026 |
| B | COMPLEX DEVELOPMENT INC NYC DOB building permits | 11 | Structural · THIS ALT-2 APPLICATION IS FILED TO RESOLVE ECB VIOLATIONS NOS. 39189987M, 39189988Y, AND 39189989X.. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED. No product keyword matched | 5 | Nov 4, 2026 |
| B | BARONE CONSTRUCTION LLC NYC DOB building permits | 11 | General Construction · CONSTRUCTION OF A NEW 6-STORY STRUCTURE THAT CONSISTS OF A K-8 GRADE SCHOOL WITH CLASSROOMS, EDUCATIONAL OFFICES, SUPPORT SPACES, AND AN AT-GRADE OUTDOOR PLAY AREA AT THE REAR OF THE BUILDING. No product keyword matched | 8 | Nov 4, 2026 |
| B | MORNINGSIDE CONSTRUCTION LLC NYC DOB building permits | 11 | Construction Fence · HEREWITH FILING FOR CONSTRUCTION FENCE IN CONJUNCTION WITH ALT2 FILING FOR INTERIOR RENOVATION No product keyword matched | 2 | Nov 4, 2026 |
| B | NOPHIER PLUMBING & HTG IN NYC DOB building permits | 11 | Plumbing · PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR & CELLAR ONLY.WORK INCLUDES: INSTALLATION OF NEWPLUMBING FIXTURES.THERE WILL BE NO PROPOSED CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Nov 4, 2026 |
| B | U&Z CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · BRICK REPLACEMENT AND WINDOW LINTEL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 9 | Nov 4, 2026 |
| B | PROCIDA CONSTRUCTION CORP. NYC DOB building permits | 11 | Full Demolition · FULL DEMOLITION OF 3 STORY BRICK BUILDING LOCATED AT 90 COFFEY STREET No product keyword matched | 25 | Nov 4, 2026 |
| B | HALSTEAD MGMT CO. NYC DOB building permits | 11 | General Construction · WORK FILED HEREWITH FOR INTERIOR RENOVATION OF APT. 1A BASEMENT LEVEL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 11 | Nov 4, 2026 |
| B | CAMBRIDGE REMODELING CORP NYC DOB building permits | 11 | General Construction · APPLICATION FILED HEREWITH TO CONVERT ONE FAMILY RESIDENCE WITH CELLAR TO A TWO FAMILY RESIDENCE. PARTIAL FOUNDATION TO REMAIN, HORIZONTAL AND VERTICAL ADDITION AS PER PLANS. No product keyword matched | 1 | Nov 4, 2026 |
| B | ICM GLOBAL DESIGN INC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK FOR A 4-STORY 1-FAMILY BUILDING. MINOR WORK IN THE BATHROOMS ONLY. NO CHANGE TO EXIST. USE, EGRESS, OR OCCUPANCY No product keyword matched | 1 | Nov 4, 2026 |
| B | REKA DARIDA FOUNDATION NYC DOB building permits | 11 | Sprinklers · The installation of a new fire protector sprinkler system with piping sized per the hydraulic calculation method construction of 95 relocated sprinkler systems heads No product keyword matched | 3 | Nov 4, 2026 |
| B | XTREME SCAFFOLDING LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 5 | Nov 4, 2026 |
| B | EXCEL RESTORATION, INC. NYC DOB building permits | 11 | Structural · Herewith filing a interior parking garage repairs and commercial tenant space entry door saddle waterproofing as per plans filed. No change in Occupancy, Use or Egress. No product keyword matched | 7 | Nov 4, 2026 |
| B | ATARI REALTY NYC DOB building permits | 11 | Construction Fence · APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 8 | Nov 4, 2026 |
| B | SOA SERVICE CORPORATION NYC DOB building permits | 11 | Mechanical Systems · NEW MECHANICAL SYSTEM THROUGHOUT No product keyword matched | 1 | Nov 4, 2026 |
| B | LLNY GROUP,LLC NYC DOB building permits | 11 | Full Demolition · This job is filed for demolition work at 479 HERKIMER STREET, BROOKLYN NY 11213. No product keyword matched | 5 | Nov 4, 2026 |