Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | 814LLC NYC DOB building permits | 7 | Plumbing · PROVIDE NEW 1 DOMESTIC WATER LINE TO 2 NEW BOILERS, CONNECTION IS LOCATED AFTER EXISTING DOMESTIC WATER SUB-METER. PROVIDE 2-1/2 GAS LINES TO 2 NEW BOILER, CONNECTION IS LOCATED AFTER EXISTING GAS METER. CONNECT NEW 4 FLOOR DRAIN TO NEAREST S. VENT LI No product keyword matched | 0 | Dec 9, 2025 |
| C |
| ESSENTIA BUILDERS LLC NYC DOB building permits |
| 7 |
General Construction · Interior renovation of unit 101 with new half bathroom No product keyword matched |
| 0 |
| Dec 9, 2025 |
| C | BRONXCARE HEALTH SYSTEM NYC DOB building permits | 7 | Sprinklers · Limited Sprinkler system upgrade for first floor CT Scan on the 1st Floor. No change to use, egress or occupancy. No product keyword matched | 0 | Dec 9, 2025 |
| C | 7921710989 NYC DOB building permits | 7 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 9, 2025 |
| C | FORD LINCOLN OF QUEENS NYC DOB building permits | 7 | Curb Cut · PROPOSED REPLACE OF EXISTING CURB CUT, WORK FILED IN CONJUNCTION WITH ALT-CO #Q00491584, TOTAL WIDTH INCLUDING SPLAYS IS 29.9' No product keyword matched | 0 | Dec 9, 2025 |
| C | 2077A FULTON LLC NYC DOB building permits | 7 | General Construction · Minor Interior work. no change in use, egress or occupancy. Violation 35581099P 35637659Y 35637670P No product keyword matched | 0 | Dec 9, 2025 |
| C | 454 WILLOUGHBY LLC NYC DOB building permits | 7 | Construction Fence · TEMPORARY CONSTRUCTION FENCE No product keyword matched | 0 | Dec 9, 2025 |
| C | E&M BUILDERS GROUP CORP NYC DOB building permits | 7 | Plumbing · PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH NB# 321590854 No product keyword matched | 0 | Dec 9, 2025 |
| C | SIMON BRUCHA LLC NYC DOB building permits | 7 | General Construction · EMERGENCY STABILIZATION WORK OF EXISTING 3-STORY BUILDING No product keyword matched | 0 | Dec 9, 2025 |
| C | MERCON PLUMBING CORP NYC DOB building permits | 7 | Plumbing · SUBSEQUENT FILING FOR NB PLUMBING WORK AS PER PLAN, IN CONJUNCTION WITH NB # Q00636484. No product keyword matched | 0 | Dec 9, 2025 |
| C | MIDWEST STEEL INC NYC DOB building permits | 7 | Protection and Mechanical Methods · Use of telehandler equipment as per plans filed herewith. This application is filed in conjunction with NB M00587493-I1 No product keyword matched | 0 | Dec 9, 2025 |
| C | LEONE ELECTRIC CO. LLC NYC DOB electrical permits | 7 | Install 1- 200 amp 1 phase by-pass meter & 1- 200 amp 1 phase service switch 1- 200 amp 1 phase panel. CLOSE OUT PERMIT #Q08015156 No product keyword matched | 0 | Dec 9, 2025 |
| C | Beirut Bites NYC DOB building permits | 7 | Mechanical Systems · INTERIOR RENOVATION FOR EXISTING STORE INCLUDING, INSTALLCERAMIC FLOOR, INTERIOR PARTITION WALLS, CEILING, MECHANICALWORK AS PER PLANS. PLUMBING APPLICATION TO BE FILE UNDER SEPARATED APPLICATION. NO CHANGE USE AGREES OR OCCUPANCY THIS APPLICATION. No product keyword matched | 0 | Dec 8, 2025 |
| C | J & F GROUP NY LLC NYC DOB building permits | 7 | Construction Fence · file temporary construction fence. No product keyword matched | 0 | Dec 8, 2025 |
| C | HAVEN CONSULTING GROUP NYC DOB building permits | 7 | General Construction · REMOVAL SHEET ROCK AT CEILING AND WALLS AT APT 4A, 4B,4C,4D,4E AT 4TH FLOOR, APT 3C AT 3RD FLOOR AND APT 2C AT 2ND FLOOR No product keyword matched | 0 | Dec 8, 2025 |
| C | NY KITCHEN & BATH USA COR NYC DOB building permits | 7 | General Construction · Renovate Apartment 5A- New floors, Kitchen and Bathrooms - no change in use, egress or occupancy. No product keyword matched | 0 | Dec 8, 2025 |
| C | 245 EAST 44TH STREET LLC NYC DOB building permits | 7 | General Construction · ROOF COVERING REPLACEMENT AT ROOF, PENTHOUSE ROOF & WATER TANK ENCLOSURE. NO CHANGE TO EXISTING ROOF DECK. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK. No product keyword matched | 0 | Dec 8, 2025 |
| C | BRUCE H. SOBEL CPA P.C. NYC DOB building permits | 7 | General Construction · HEREWITH FILE ROOF REPLECEMENT AS PER PLANS No product keyword matched | 0 | Dec 8, 2025 |
| C | SEA BREEZE CONDO ASSOCIATION NYC DOB building permits | 7 | General Construction · Filing facade repairs (Replace cracked CMU blocks, install asymmetric helix anchors) as per FISP report, cycle 10C as per plans. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Dec 8, 2025 |
| C | KOSSARS 72 LLC NYC DOB building permits | 7 | Plumbing · Plumbing work filed in conjunction with restaurant renovation as indicated on plans. no change in use or egress. No product keyword matched | 0 | Dec 8, 2025 |
| C | kings infiniti NYC DOB building permits | 7 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 8, 2025 |
| C | ADVENTURE PROPERTIES, INC. NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION OF BASEMENT UNIT, INCLUDING NEW PARTITIONS BATHROOM AND KITCHEN.PLUMBING APPLICATION FILED SEPARATELY.NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 8, 2025 |
| C | BROOKLYN FRIENDS SCHOOL NYC DOB building permits | 7 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 0 | Dec 8, 2025 |
| C | 535 EIGHTH AVENUE, LLC NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION OF THE 16TH FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 8, 2025 |
| C | RADIO CITY APARTMENTS NYC DOB building permits | 7 | Plumbing · FILING FOR PLUMBING FIXTURES / EQUIPMENT FOR EXISTING LAUNDRY ACCESSORY TO HOTEL AT CELLAR FLOOR. IN ORDER TO OBTAIN PLUMBING WORK FINAL SIGN-OFF. No product keyword matched | 0 | Dec 8, 2025 |
| C | DANIEL J. CONSTRUCTION IN NYC DOB building permits | 7 | General Construction · RENOVATION OF THE EXISTING FOUR (4) APARTMENTS No product keyword matched | 0 | Dec 8, 2025 |
| C | P K REMODELING INC NYC DOB building permits | 7 | General Construction · General construction work associated with the renovation of an existing 4th floor apartment. No change to use, egress, or occupancy. No product keyword matched | 0 | Dec 8, 2025 |
| C | TAAS CONSTRUCTION CORP IN NYC DOB building permits | 7 | General Construction · Interior renovation of an apartment Apt 7B at 7TH floor kitchen, new laundry and bathroom renovation. No change of use, egress or occupancy. No product keyword matched | 0 | Dec 8, 2025 |
| C | Doroma Realty LLC NYC DOB building permits | 7 | Mechanical Systems · INSTALLATION OF THE NEW COMMERCIAL KITCHEN EXHAUST SYSTEM & MAKEUP AIR SYSTEM FOR COMMERCIAL KITCHEN AT THE 1ST FLOOR ALONG WITH NEW SPLIT HEAT PUMP SYSTEM ALONG W/ ASSOCIATED PIPING & DUCTWORK AS SHOWN ON THE DRAWINGS FILED HEREIN. No product keyword matched | 0 | Dec 8, 2025 |
| C | ASHTONS REMODELING AND CO NYC DOB building permits | 7 | General Construction · Interior Renovations of Unit 6G as per plans. Limited demolition of non-structural partitions, doors & finishes. Installation of new non-structural partitions doors and finishes. No change to Use, Egress or Occupancy under this application. No product keyword matched | 0 | Dec 8, 2025 |
| C | MAYFAIR HOTEL; ASSOCIATES LLC NYC DOB building permits | 7 | General Construction · Modification of partitions, floors, doors and related work as shown on plans. REPLACEMENT OF EXISTING LIGHTING & ADDITIONAL NEW LIGHT FIXTURES AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 0 | Dec 8, 2025 |
| C | S.R.K CONTRUCTION INC NYC DOB building permits | 7 | General Construction · ALT- CO FILED TO OBTAIN A CERTIFICATE OF OCCUPANCY WITH REAR EXTENSION. No product keyword matched | 0 | Dec 8, 2025 |
| C | CITIWIDE REALTY LLC NYC DOB building permits | 7 | General Construction · ALTERATION HEREWITH FILED FOR A FIRE RESTORATION WORK FOR AN EXISTING THREE-FAMILY, THREE-STORY WITH A CELLAR FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 8, 2025 |
| C | RAYMOND DELANEY NYC DOB building permits | 7 | Construction Fence · CONSTRUCTION WOOD FENCE FILED FOR 140.00 LINEAR FOOT No product keyword matched | 0 | Dec 8, 2025 |
| C | BUZ REAL ESTATE CO NYC DOB building permits | 7 | Plumbing · PROPOSING PLUMBING WORK TYPE TO EXISTING TWO FAMILY DWELLING IN CONJUNCTION WITH ALT 2 APPLICATION 421728633 No product keyword matched | 0 | Dec 8, 2025 |
| C | CASELLA HOUSE HDFC NYC DOB building permits | 7 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTY DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Dec 8, 2025 |
| C | HEADQUARTERS MECH INC NYC DOB building permits | 7 | Standpipe · Installation of Temporary Dry Standpipe in conjunction with NB # B00645411. No product keyword matched | 0 | Dec 8, 2025 |
| C | I.M.HOME IMPROVEMANT NYC DOB building permits | 7 | Construction Fence · TEMPORARY FENCE No product keyword matched | 0 | Dec 8, 2025 |
| C | CORE ELEC & COMMUNICATION NYC DOB electrical permits | 7 | INTERIOR RENOVATION OF MIESTER HALL, NEW LIGHT, HEAT, POWER AND FIRE PROTECTION No product keyword matched | 0 | Dec 8, 2025 |
| C | POSITIVE CONNECTIONS ELEC NYC DOB electrical permits | 7 | Upgrades - Installation of new wiring for Apt. # 1B No product keyword matched | 0 | Dec 8, 2025 |
| C | M&R MANAGEMENT CO. INC NYC DOB building permits | 7 | Sprinklers · INSTALLATION OF WASHER AND DRYERS FOR ACCESSORY USE TENANT'S LAUNDRY AT CELLAR. WORK ALSO INCLUDES NEW SPRINKLER HEADS OFF EXISTING AUTOMATIC SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPNACY No product keyword matched | 0 | Dec 5, 2025 |
| C | Union & Utopia HJ LLC NYC DOB building permits | 7 | Plumbing · A STORMWATER MANAGEMENT SYSTEM REPAIR / REPLACEMENT-IN-KIND IS PROPOSED FOR THE EXISTING PARKING LOT LOCATED AT THE PROJECT SITE. THE SYSTEM IS COMPRISED OFSUB-SURFACE RETENTION & INFILTRATION SYSTEM. No product keyword matched | 0 | Dec 5, 2025 |
| C | 232ND LLC NYC DOB building permits | 7 | Plumbing · LEGALIZE REPALCEMENT OF PLUMBING FIXTURES No product keyword matched | 0 | Dec 5, 2025 |
| C | DAVID FONT NYC DOB building permits | 7 | Foundation · HEREWITH FILING FOR A NEW SINGLE-FAMILY RESIDENCE. V(A) CONSTRUCTION, PODIUM BUILD No product keyword matched | 0 | Dec 5, 2025 |
| C | NEXTSPHERE HOLDINGS LLC NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION OF MULI RESIDENTIAL UNITS INCLUDING REMOVAL AND INSTALLATION OF NON-BEARING PARTITIONS, DOORS, AND LIGHTING FIXTURES. AND NEW STAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Dec 5, 2025 |
| C | OUR LADY OF THE BLESSED SACRAMENT C NYC DOB building permits | 7 | General Construction · Proposed playground, no change to use, egress, occupancy, or bulk. No product keyword matched | 0 | Dec 5, 2025 |
| C | East Hawk, LLC NYC DOB building permits | 7 | General Construction · Create a new convenience stair and combine 3 apartments on floors 1 and 2 into 1 duplex apartment. No product keyword matched | 0 | Dec 5, 2025 |
| C | BERNARD CLARE NYC DOB building permits | 7 | General Construction · Job filed to remove partitions to remove violation #34214775K No product keyword matched | 0 | Dec 5, 2025 |
| C | ROCK OF NYC CONSTR LLC NYC DOB building permits | 7 | General Construction · Superseding old Alt-1 application 103169615; change of use from commercial to residential 1-family. No product keyword matched | 0 | Dec 5, 2025 |
| C | HARROW CONSTRUCTION & MA* NYC DOB building permits | 7 | Foundation · VERTICAL AND HORIZONTAL EXTENSION TO EXISTING 1-FAMILY HOUSE, AND WITH AN ADU. FILED TO MEET NEW BUILDING REQUIREMENTS. No product keyword matched | 0 | Dec 5, 2025 |