Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 166 new drop Ln NYC DOB building permits | 8 | Mechanical Systems · Installation of a split-type air conditioner for the existing store as per plan. No change to use, egress or occupancy under this application. No product keyword matched | 0 | Feb 23, 2026 |
| B | CORNERSTONE ARCHITECTS |
| 8 |
Suspended Scaffold · Installation of suspended scaffold for facade inspection/ Repair. No product keyword matched |
| 0 |
| Feb 23, 2026 |
| B | NY CITY CONSTRUCTION* NYC DOB building permits | 8 | General Construction · Minor renovations to existing single family dwelling. No change to use, egress or occupancy. No product keyword matched | 0 | Feb 23, 2026 |
| B | QB & SON LLC NYC DOB building permits | 8 | General Construction · FILE TO ADDRESS VIOLATIONS#339158446H,#39158445X,AND #39158444Y FOR ILLEGAL HABITABLE USE OF CELLAR. PROPOSED WORK INCLUDES REMOVAL OF PARTITIONS, FIXTURES, AND FINISHES TO ELIMINATE RESIDENTIAL USE AND RESTORE CELLAR TO LEGAL STORAGE USE. No product keyword matched | 0 | Feb 23, 2026 |
| B | THE WHITING-TURNER CONTRA NYC DOB building permits | 8 | General Construction · Removal and renovation of non-load bearing partitions. No change in use, egress or occupancy. No product keyword matched | 0 | Feb 23, 2026 |
| B | N STAR CONSTRUCTION II CO NYC DOB building permits | 8 | General Construction · General Construction to renovate existing apt. #14AB at the 14th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application. No product keyword matched | 0 | Feb 23, 2026 |
| B | GUNTHER DEVELOPMENT TODT HILL, LLC NYC DOB building permits | 8 | Antenna · MODIFICATION TO EXISTING COMMUNICATIONS SITE IN EXISTING LIGHTHOUSE REMOVE 5 CABINET INSTALL 1 CABINETS. . REMOVE 6 ANTENNAS INSTALL 3 ANTENNAS AND 3 RRHE.. PROJECT IS AN ELLIGIBLE FACILITIES REQUEST PERSUANT TO SEC 6409(A) OF THE SPECTRUM ACT SEE 47 CF No product keyword matched | 0 | Feb 23, 2026 |
| B | HOG SUNNYSIDE MULTIFAMILY HOLDING L NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AT EXISTING HOTEL LOBBY ON 1ST FLOOR AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Feb 23, 2026 |
| B | UNITED CONTRACTING & NYC DOB building permits | 8 | General Construction · ALTERATION - INTERIOR RENOVATION OF A ONE BEDROOM, TWO BATHROOM DWELLING UNIT TO CREATE A TWO BEDROOM, TWO BATHROOM DWELLING UNIT. NO CHANGE TO OCCUPANCY, OR EGRESS REQUIRED. NO CHANGE TO THE EXISTING PLUMBING BUILDING RISERS. No product keyword matched | 0 | Feb 23, 2026 |
| B | E&E GENERAL CONTRACTORS NYC DOB building permits | 8 | General Construction · Interior alteration of Apartment #3G. Including renovation of kitchen, refinishing flooring, new appliances, etc... No change to existing use, occupancy or egress. No product keyword matched | 0 | Feb 23, 2026 |
| B | Trotti Family Trust NYC DOB building permits | 8 | Plumbing · REGISTER GAS APPLIANCES. No product keyword matched | 0 | Feb 23, 2026 |
| B | K-FOUR CONSTRUCTION CORP NYC DOB building permits | 8 | General Construction · Minor interior demolition. No change in occupancy or egress. No product keyword matched | 0 | Feb 23, 2026 |
| B | ALTHEA HEYWARD NYC DOB building permits | 8 | Construction Fence · APPLICATION IS FILED FOR THE INSTALLATION OF ~63'-4 LONG, 8'-0 HIGH TEMPORARY CONSTRUCTION FENCE IN RESPONSE TO VIOLATION V 021026IMEGNCY19980 No product keyword matched | 0 | Feb 23, 2026 |
| B | PUNCHDOWN ELECL & CONTLS NYC DOB electrical permits | 8 | Electrical Power and Lighting Alteration No product keyword matched | 0 | Feb 23, 2026 |
| B | FRITZMARTIN ELECTRIC INC. NYC DOB electrical permits | 8 | Removing and installing new lighting fixture. removing and installing new devices in existing locations. Wiring new HVAC System No product keyword matched | 0 | Feb 22, 2026 |
| B | 11 CARMINE HOGO LLC NYC DOB building permits | 8 | Plumbing · Application filed in association with renovation of existing commercial space. No product keyword matched | 0 | Feb 20, 2026 |
| B | 50 BOWERY HOLDINGS LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF THE COMMERICAL SPACE IN CELLAR. NO CHNGAE OF USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Feb 20, 2026 |
| B | DAVIS STREET DEVELOPMENT LLC NYC DOB building permits | 8 | General Construction · PROPOSED RENOVATION OF A NEW RESTAURANT AT CELLAR AND BASEMENT AS PER PLAN. No product keyword matched | 0 | Feb 20, 2026 |
| B | HAYDEN ON THE HUDSON CONDOMINIUM NYC DOB building permits | 8 | Plumbing · To alter plumbing fixtures and gas appliances as per plan. Apts 3E & 3F. No product keyword matched | 0 | Feb 20, 2026 |
| B | SHUN HE LLC. NYC DOB building permits | 8 | General Construction · ENCLOSE 1ST FLOOR EXISTING PORCH AT THE REAR YARD AND VERTICAL EXTENT ONE STORY ON IT. AND CONVERT EXISTING ONE FAMILY INTO TWO FAMILY. REQUIRED NEW C OF O FOR TWO FAMILY No product keyword matched | 0 | Feb 20, 2026 |
| B | P.I. MECHANICAL CORP NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AT 2ND FLOOR RELATED TO CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS AND CEILING AS INDICATED ON PLANS FILED HEREWITH, NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 0 | Feb 20, 2026 |
| B | N.W. MANAGEMENT INC NYC DOB building permits | 8 | Structural · STRUCTURAL REINSFORCMENT FILED IN CONJUNCTION WITH ANTENNA APPLICATION # Q01280314-I1 No product keyword matched | 0 | Feb 20, 2026 |
| B | KIMCO PAINTING AND CONSTR NYC DOB building permits | 8 | General Construction · Removal of partitions at cellar level. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Feb 20, 2026 |
| B | Charter Communications NYC DOB building permits | 8 | Mechanical Systems · Installation of (1) 8 ton air-cooled split system with ACCU on 2nd floor roof. AHU installed in the 1st floor IT room. No product keyword matched | 0 | Feb 20, 2026 |
| B | 10M157Huron LLC NYC DOB building permits | 8 | Construction Fence · CONSTRUCTION OF FENCE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | 339-347 EAST 12TH STREET INVESTOR, NYC DOB building permits | 8 | General Construction · EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | PEAK NYC DOB building permits | 8 | Plumbing · PLUMBING WORK TO RENOVATE UNITS #1L and 1R @ 1ST FLOOR, 3L and 3R @ 3RDFLOOR & CELLAR .NO CHANGE TO USE, EGRESS OR OCCUPANR No product keyword matched | 0 | Feb 20, 2026 |
| B | S.GOOLCHARAN CONSTRUCTION NYC DOB building permits | 8 | General Construction · Structural Repairs, Fireproofing Restoration, and Electrical Upgrades on 1st No product keyword matched | 0 | Feb 20, 2026 |
| B | 365 W. 20TH STREET APARTMENT CORP. NYC DOB building permits | 8 | Suspended Scaffold · Installation of outriggers for facade repair and inspection No product keyword matched | 0 | Feb 20, 2026 |
| B | Borek QOZ Fund LLC NYC DOB building permits | 8 | Mechanical Systems · Mechanical modifications to take place on the roof as shown on plans submitted herewith. No change in use, egress or occupancy. No product keyword matched | 0 | Feb 20, 2026 |
| B | GALICIA CONTRACTING OF NJ NYC DOB building permits | 8 | General Construction · GENERAL CONSTRUCTION FOR A ROOFING WATERPROOF MEMBRANE AND INSULATION TO BE REPLACED. No product keyword matched | 0 | Feb 20, 2026 |
| B | quality care physical NYC DOB building permits | 8 | General Construction · ERECT NEW AWNING WITH COPY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | YMCA NYC NYC DOB building permits | 8 | Mechanical Systems · WORK TYPE FILED FOR REPLACEMENT OF 4 AC UNIT AT EXISTING ROOF BUILDING ON NEW STEEL CURB CONNECTING TO EX. DUCT SYSTEM AND PIPING. APPLICATION FILED TO OBTAIN CERTIFICATE OF COMPLIANCE(EQUIPMENT USE PERMIT)NO CHANGE TO USE EGRESS AND/OR OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | POSITIVE WORKFORCE, INC. NYC DOB building permits | 8 | Structural · APPLICATION HEREWITH FILE FOR RENOVATIONS AT FIRST FLOOR AND CURE VIOLATIONS 39518909L AND 39518905Y. NO CHANGE TO OCCUPANCY USE, EGRESS, OR BULK No product keyword matched | 0 | Feb 20, 2026 |
| B | BEACH BAY REALTY MANAGEMENT LLC NYC DOB building permits | 8 | General Construction · CONVERT THE FRONT PART OF 1ST FLOOR OF AN EXISTING 4-STORY COMMERCIAL BUILDING TO PLACE OF WORSHIP. OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | HOME CRAFTS, INC NYC DOB building permits | 8 | General Construction · INSTALL (1) NEW GAS FIRED DIRECT VENT FIREPLACE WITH DOUBLEWALL FLUE AND HORIZONTAL POWERVENT IN CONJUNCTION WITH NB 122132110. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | Georgian Bread House LLC NYC DOB building permits | 8 | Plumbing · Installation of commercial dishwasher at 1st floor in addition to replacement of (3) commercial kitchen cooking appliances to existing gas supply lines at 1st floor kitchen. No product keyword matched | 0 | Feb 20, 2026 |
| B | JG41 E 20TH STREET LLC NYC DOB building permits | 8 | General Construction · Architectural modifications to 2nd floor as per plans. No changes in use, egress or occupancy. No product keyword matched | 0 | Feb 20, 2026 |
| B | MOLONEY NYC DOB building permits | 8 | Structural · Installation of temporary shoring to support the sidewalk vault framing prior to their reinforcement, repair or replacement.. No change in use egress or occupancy. No product keyword matched | 0 | Feb 20, 2026 |
| B | AFCO DEV NYC DOB building permits | 8 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 20, 2026 |
| B | S REMODELING CORP NYC DOB building permits | 8 | General Construction · interior renovation to unit 4H as indicated on the dwg's including kitchen alteration, bathroom, powder room reno & replacement of washer/dryer , new flooring throughout. there will be no change to use, occupancy and egress under this application No product keyword matched | 0 | Feb 20, 2026 |
| B | CIMGROUP NYC DOB building permits | 8 | Plumbing · Plumbing work as shown on plans. No product keyword matched | 0 | Feb 20, 2026 |
| B | MATISON PLBG & HTG CO INC NYC DOB building permits | 8 | Plumbing · Interior renovation of existing apartment on the 6th floor with new plumbing fixtures in kitchen, bedroom, main bedroom, and existing bathroom No product keyword matched | 0 | Feb 20, 2026 |
| B | FEB GENERAL CONTRACTOR CO NYC DOB building permits | 8 | General Construction · FILING TO SHOW A RENOVATION IN AN EXISTING STORE No product keyword matched | 0 | Feb 20, 2026 |
| B | ALL BALANCED ELECTRICAL I NYC DOB electrical permits | 8 | General Wiring HVAC HEAT PUMP WATER HEATER .Main Panel Replacement . No product keyword matched | 0 | Feb 20, 2026 |
| B | Pink Pistacio NYC DOB electrical permits | 8 | dcfsdfsdf No product keyword matched | 0 | Feb 20, 2026 |
| B | Micosoft 3650 NYC DOB electrical permits | 8 | fgdhgfjk No product keyword matched | 0 | Feb 20, 2026 |
| B | 30 EAST NINTH STREET CONDOMINIUM NYC DOB building permits | 8 | Plumbing · Herewith file plumbing plans for Apt. 4N, filed in conjunction with general construction. (areas of plumbing work guest bathroom is 52 sf master bathroom is 70 sf) No product keyword matched | 0 | Feb 19, 2026 |
| B | LIDL US NYC DOB building permits | 8 | Plumbing · LIDL W - FILING HEREWITH FOR PLUMBING WORK RELATED TO THE RENOVATION OF THE EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. No product keyword matched | 0 | Feb 19, 2026 |
| B | 1256 Teller Ave Properties, LLC NYC DOB building permits | 8 | Mechanical Systems · Filing Mechanical drawings subsequent to job number X01231821-I1. No product keyword matched | 0 | Feb 19, 2026 |