Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | UNIVERSAL CONSTRUCTION IN NYC DOB building permits | 8 | General Construction · APPLICATION FILE TO INTERIOR RENOVATION AS REMOVE & INSTALL PARTITION, CEILING, FLOOR TILES, COUNTER AND STORE FRONT AT 1st FLOOR. PLUMBING AND MECHANICAL WORK NOT UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 3, 2026 |
| B |
| 35 MT. MORRIS PARK WEST HDFC NYC DOB building permits |
| 8 |
General Construction · FACADE REPAIRS TO ADDRESS LOCAL LAW No product keyword matched |
| 0 |
| Mar 3, 2026 |
| B | 2323 DEVELOPMENT CORP NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AT COMMERCIAL SPACE AT 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Mar 3, 2026 |
| B | LEBNON DELI NYC DOB building permits | 8 | Plumbing · 136/25 CREATE A COMMERCIAL KITCHEN IN DELI STORE No product keyword matched | 0 | Mar 3, 2026 |
| B | YAPOR DENTAL PC NYC DOB building permits | 8 | Boiler Equipment · INSTALLATION OF NEW BOILER IN EXISTING MECHANICAL ROOM. REMOVING OLD BOILER NOT IN USE. NO CHANGE OF USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 3, 2026 |
| B | NEW LINK CONSTRUCTION I* NYC DOB building permits | 8 | Mechanical Systems · THIS PAA IS TO SHOW NEW INTERIOR LAYOUT IN ALL FLOORS AND NEW BOILER ROOM IN CELLAR No product keyword matched | 0 | Mar 3, 2026 |
| B | ABHH HOLDINGS LLC NYC DOB building permits | 8 | Plumbing · PROPOSED TO ADDITION COMMERCIAL KITCHEN EQUIPMENT AT 1ST FLOOR EXISTING COMMERCIAL KITCHEN AREA WITH EXISTING GAS LINE. No product keyword matched | 0 | Mar 3, 2026 |
| B | ZUN PROSPECT 228, LLC NYC DOB building permits | 8 | Mechanical Systems · HEREWITH FILE TO RENOVATE EXIST. 2-APARTMENT UNITS. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY No product keyword matched | 0 | Mar 2, 2026 |
| B | EMJ Healthcare Clinic NYC DOB building permits | 8 | Plumbing · SUBSEQUENT FILING FOR PLUMBING WORK No product keyword matched | 0 | Mar 2, 2026 |
| B | DHI RENOVATION INC NYC DOB building permits | 8 | General Construction · Demolition and construction as required to combine Coop Apt.1 at basement and cellar with Coop Apt.2 at 1st Floor. Removal of 1 kitchen. No change to Use Egress or Occupancy. No change to C of O required as per Local Law 77 of 1968 and TPPN 3/97. No product keyword matched | 0 | Mar 2, 2026 |
| B | COMMUNITY LEAGUE OF THE HEIGHTS. IN NYC DOB building permits | 8 | Solar · Installation of 6.23 kw solar energy system on roof. No change of occupancy, use or egress. No product keyword matched | 0 | Mar 2, 2026 |
| B | CRESCENT PROPERTIES, INC. NYC DOB building permits | 8 | Mechanical Systems · FILING FOR REPLACEMENT GAS-FIRED HVAC ROOFTOPUNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Mar 2, 2026 |
| B | Cengo Consulting NP LLC NYC DOB building permits | 8 | General Construction · INTERIOR DEMOLITON OF NON-LOAD BEARING INTERIOR PARTITIONS, AND RELATED FIXTURES ON FIRST FLOOR No product keyword matched | 0 | Mar 2, 2026 |
| B | ASH MGMT NYC DOB building permits | 8 | Construction Fence · FILING FOR CONSTRUCTION FENCE No product keyword matched | 0 | Mar 2, 2026 |
| B | CHEALSEA HOTEL OWNER LLC NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK FOR SPA SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | CRAFT DESIGN CONSTR CORP NYC DOB building permits | 8 | Mechanical Systems · MODIFICATIONS & REPLACEMENT TO EXISTING HVAC SYSTEM THROUGHOUT BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | KODRA. CONSTRUCTION CORP NYC DOB building permits | 8 | Construction Fence · Construction Fence needed for NB and Demolition filed under FD #X01265371-I1 No product keyword matched | 0 | Mar 2, 2026 |
| B | 221 East 60th Street Realty LLC NYC DOB building permits | 8 | General Construction · Proposed Interior renovation of existing apartment 3C on Third floor associated with minor plumbing work (under separate permit).No change in use ,occupancy or means of egress. No product keyword matched | 0 | Mar 2, 2026 |
| B | BERGEN PROPERTY 2025 CORP NYC DOB building permits | 8 | Plumbing · FILING FOR PLUMBING WORK No product keyword matched | 0 | Mar 2, 2026 |
| B | First Church of Christ, Science NYC DOB building permits | 8 | Mechanical Systems · Installation of new exhaust fan and associated duct work and specialties. No product keyword matched | 0 | Mar 2, 2026 |
| B | CARA MANAGEMENT GROUP LLC NYC DOB building permits | 8 | General Construction · REPLACE 5 BROKEN WOOD JOIST DUE TO WATER DAMAGE AT RESIDENTIAL GARAGE, FILING TO RESOLVE VIOLATION#34322383J. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | 730 BROADWAY SONIC CORP NYC DOB building permits | 8 | Structural · SUBSEQUENT FILING OF MINOR STRUCTURAL WORK, IN CONJUNCTION WITH GC FILING# X01338040-I1 FOR A REINFORCING EXISTING ROOF BEAMS. NO CHANGE INUSE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | DESIGN 2 BUILD NEW YORK I NYC DOB building permits | 8 | General Construction · REMOVAL OF SELECT NON-BEARING PARTITIONS AS PER PLAN. ADDITIONAL WORK TO INCLUDED No product keyword matched | 0 | Mar 2, 2026 |
| B | Alo Yoga NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIEP SCAFFOLD OF THE TOP OF THE SIDEWALK SHED AT WOSSTER ST AND SPRING ST ELEVATIONS. No product keyword matched | 0 | Mar 2, 2026 |
| B | N+ pro salon NYC DOB building permits | 8 | General Construction · Interior renovation No product keyword matched | 0 | Mar 2, 2026 |
| B | GREENACRE MANAGEMENT NYC DOB building permits | 8 | General Construction · APPLICATION FILE FOR INTERIOR RENOVATION WORK INSIDE THE COMMERCIAL SPACE AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 2, 2026 |
| B | RAINES OPTICAL COMPANY LLC NYC DOB building permits | 8 | Mechanical Systems · subsequent filing MECH work for the optical store at 001 , no change in use, egress or occupancy No product keyword matched | 0 | Mar 2, 2026 |
| B | EXPRESS PL SWR & WTR A NYC DOB building permits | 8 | Plumbing · Plumbing work to replace kitchen fixtures with new in existing locations and install new stacked washer/electric condensing dryer in unit 4A. No change in egress use or occupancy. No product keyword matched | 0 | Mar 2, 2026 |
| B | FISHER REALTY CORP NYC DOB building permits | 8 | General Construction · RESTORATION OF FACADE ELEMENTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | 3318 Corona Corp. NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF AN EXISTING ONE-FAMILY DWELLING TO RESOLVE OATH/ECB VIOLATIONS# 34574889H AND #34574890P. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | 4710 CHURCH AVENUE LLC NYC DOB building permits | 8 | Construction Fence · Fence work filed in conjunction to alt1 job No product keyword matched | 0 | Mar 2, 2026 |
| B | MARIA'S NYC DOB building permits | 8 | Construction Fence · New 8'-0 Construction Wood Fence No product keyword matched | 0 | Mar 2, 2026 |
| B | 467-469 GRAND DEVELOPMENT LLC NYC DOB building permits | 8 | General Construction · Herewith filing temporary shoring plans at cellar, 1st , 2nd and 3rd floor of the building, to relieve load on the undermined party wall along exposure 2. Party wall is between 467 & 469 Grand Street. No product keyword matched | 0 | Mar 2, 2026 |
| B | STYLE RENOVATIONS AND DEC NYC DOB building permits | 8 | Mechanical Systems · The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat, since it was disconnected to perform repair work in the building. No product keyword matched | 0 | Mar 2, 2026 |
| B | J & A INTERIORS INC NYC DOB building permits | 8 | General Construction · Filing herewith for the interior renovations to existing unit #3c. Modifications to existing plumbing systems. There is no change to use, egress, or occupancy. No product keyword matched | 0 | Mar 2, 2026 |
| B | RMZ CONTRACTING INC. NYC DOB building permits | 8 | General Construction · PROPOSED REPAIR OF STONE LINTELS TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 2, 2026 |
| B | JED 74 LLC NYC DOB building permits | 8 | Curb Cut · INSTALL NEW 18' CONCRETE CURB CUT No product keyword matched | 0 | Mar 2, 2026 |
| B | ROSAS CO NYC DOB building permits | 8 | Mechanical Systems · PROPOSED MECHANICAL WORK ONLY ON 1ST FLOOR EXISTING COMMERCIAL STORE AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | RIDGE CONTRACTING CORP NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF NEW HVAC SPLIT UNIT FOR APT. 2A OF EXISTING FOUR STORY RESIDENTIAL BUILDING. NO CHANGE IN OCCUPANCY, USE, OR EGRESS. No product keyword matched | 0 | Mar 2, 2026 |
| B | NORTHERN STRAR REALTY NYC DOB building permits | 8 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 2, 2026 |
| B | JOSEPH GLORIA NYC DOB building permits | 8 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |
| B | 275 BLEECKER ST LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APT 8 ON 3rd FL. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.MECHANICAL AND PLUMBING WORK FILED UNDER SEPARATE APPLICATION No product keyword matched | 0 | Mar 2, 2026 |
| B | ROBERT CURTIS NYC DOB building permits | 8 | General Construction · APPLICATION FILED FOR THE EMERGENCY REMOVAL OF EXISTING BRICK VENEER EXTERIOR CLADDING AND REPLACEMENT WITH VINYL SIDING ON NORTH-WEST ELEVATION OF EXISTING 2 STORY, 1 FAMILY BUILDING. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Mar 2, 2026 |
| B | PROTO PROPERTY SERVICES LLC NYC DOB building permits | 8 | Suspended Scaffold · Hands-on inspection for FISP No product keyword matched | 0 | Mar 2, 2026 |
| B | 69-12 53RD AVE OWNERS LLC NYC DOB building permits | 8 | General Construction · PROPOSE A NEW THREE STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O. No product keyword matched | 0 | Mar 2, 2026 |
| B | BNF CONTRACTORS INC NYC DOB building permits | 8 | General Construction · Minor renovation to existing bank branch including partial removal of non-load bearing, new partition work, new lighting at ceiling and associated finish work. No change in use, egress or occupancy. No product keyword matched | 0 | Mar 2, 2026 |
| B | 896 E 167 ST LLC NYC DOB building permits | 8 | Construction Fence · NEW TEMPORARY CONSTRUCTION FENCE FOR NEW 4-STORY RESIDENTIAL BUILDING. No product keyword matched | 0 | Mar 2, 2026 |
| B | MANHATTAN VALLEY DEVELOPMENT CORPOR NYC DOB building permits | 8 | Boiler Equipment · REPLACE BOILER AND OIL BURNER. No product keyword matched | 0 | Mar 2, 2026 |
| B | VINESKI-MAY PLBG & HTG LL NYC DOB building permits | 8 | Plumbing · Installation of new plumbing fixtures, equipment and piping associated with the interior renovation of a three story and cellar three family dwelling. PAA P2 filed for the clarification to the drawings for the underground plumbing in the cellar. No product keyword matched | 0 | Mar 2, 2026 |
| B | CHUNG PAK LDC NYC DOB building permits | 8 | General Construction · WINDOW REMOVAL AND REPLACEMENT. THROUGH WALL AC SLEEVE REMOVAL AND INFILL, NEW MECHANICAL SHAFTS. NEW 13TH FL SOLARIUM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 2, 2026 |