Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ILLKM UPTOWN NYC DOB building permits | 8 | Mechanical Systems · Modifications to HVAC system in single family dwelling. New units and duct modifications. No product keyword matched | 0 | Mar 6, 2026 |
| B | RELIANCE CONSTRUCTION NY NYC DOB building permits |
| 8 |
Structural · PROPOSED STRUCTURAL REPAIR WORK FOR THE EXISTING REAR YARD CONCRETE SLAB. No product keyword matched |
| 0 |
| Mar 5, 2026 |
| B | C26 DEVELOPMENT LLC NYC DOB building permits | 8 | Plumbing · THIS APPLICATION IS FILED TO ADD A NEW PLUMBING WORK TYPE IN CONJUNCTION WITH A NEW BUILDING APPLICATION No product keyword matched | 0 | Mar 5, 2026 |
| B | MINRAV DEVEOPMENT INC NYC DOB building permits | 8 | Mechanical Systems · Mechanical work as per plans filed in conjunction with NB # M00479953 No product keyword matched | 0 | Mar 5, 2026 |
| B | LITTLE NECK COMMONS LL NYC DOB building permits | 8 | Sprinklers · PROPOSED FILING FOR SPRINKLER WORK IN CONJUNCTION WITH DOB NOW APPLICATION #Q00795113. No product keyword matched | 0 | Mar 5, 2026 |
| B | QUALITY CONTROL MECH LLC NYC DOB building permits | 8 | Mechanical Systems · Herewith file mechanical plans for Apt #7F to remove existing fan coil units, locate 2 new condensers, provide indoor air handlers and new toilet exhaust systems, remove existing TX grille & replace with new TX registers, filed in conj w/ GC No product keyword matched | 0 | Mar 5, 2026 |
| B | 922 LLC NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 5, 2026 |
| B | JOVIAN MANAGEMENT CO INC NYC DOB building permits | 8 | General Construction · THE PURPOSE OF THIS FILING IS TO REFURBISH EXISTING COMMERCIAL SPACE AS PER DRAWINGS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Mar 5, 2026 |
| B | 420 East 75 Street LLC NYC DOB building permits | 8 | Construction Fence · Install 8' temporary construction fence. No product keyword matched | 0 | Mar 5, 2026 |
| B | ACS MECHANICS INC NYC DOB building permits | 8 | Mechanical Systems · Bathroom exhaust & HVAC system in conjunction with construction as per the plans filed herewith No product keyword matched | 0 | Mar 5, 2026 |
| B | KODRA NYC CONTRACTING, INC NYC DOB building permits | 8 | General Construction · FILING FOR 2ND FLOOR EXTENSION PLAN APPROVAL, RESCIND THE STOP WORK ORDER, AND COMPLETE THE WORK. NO CHANGE IN USAGE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Mar 5, 2026 |
| B | HVAC EXPERTS, INC NYC DOB building permits | 8 | Mechanical Systems · Proposed Alteration for the Mechanical work in conjunction with general GC DOB#M0113989-I1 for the renovation of a residential unit on the 5th Floor of a 6-story mixed-use building. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Mar 5, 2026 |
| B | SWE DEVELOPMENT CORP NYC DOB building permits | 8 | Structural · FILING FOR STRUCTURAL WORK TYPE IN CONJUNCTION WITH ALT 1 JOB# Q00861973-I1. No product keyword matched | 0 | Mar 5, 2026 |
| B | ACE MAINTENANCE USA LLC NYC DOB building permits | 8 | Supported Scaffold · Filing for the installation of pump jack scaffolds. No product keyword matched | 0 | Mar 5, 2026 |
| B | DELMAR MANAGEMENT SERVICES NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF EXISTING FIRE DAMAGED APARTMENTS B1, 2, 8 AND 12 ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Mar 5, 2026 |
| B | DITMAS PARK RENOVATIONS NYC DOB building permits | 8 | General Construction · Interior renovation on an existing eating/drinking establishment. No change in use, occupancy or exit. C of O # 218750 Sept. 15, 1980. No product keyword matched | 0 | Mar 5, 2026 |
| B | George Karayanis NYC DOB building permits | 8 | General Construction · Installation of interior partitions at the ground floor No product keyword matched | 0 | Mar 5, 2026 |
| B | VESTA CONSTRUCTION, INC NYC DOB building permits | 8 | Structural · New framing for proposed stair opening at 1st Floor of existing two-story rear extension. No product keyword matched | 0 | Mar 5, 2026 |
| B | 6302 REALTY CORP NYC DOB building permits | 8 | Construction Fence · TO FILE EQ FENCE PERMIT IN CONJUNCTION WITH NB JOB #B00654655. No product keyword matched | 0 | Mar 5, 2026 |
| B | ADVANCED FACADE SOLUTION* NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 0 | Mar 5, 2026 |
| B | Sense Spa-wellness & scalp care NYC DOB building permits | 8 | Plumbing · Install plumbing fixtures. No change occupancy, use, or means egress. No product keyword matched | 0 | Mar 5, 2026 |
| B | EAST COAST NYC DOB building permits | 8 | Construction Fence · INSTALL TEMPORARY FENCE FOR THIS NEW BUILDING APPLICATION. No product keyword matched | 0 | Mar 5, 2026 |
| B | NEST & ROOST REALTY, INC. NYC DOB building permits | 8 | Suspended Scaffold · INITIAL CD5: INSPECTION & FISP REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 5, 2026 |
| B | CHAO SHENG DEVELOPMENT LLC NYC DOB building permits | 8 | General Construction · THIS FILING SUPERSEDES PRIOR BIS JOB #421083954 FOR FIRE AND WATER DAMAGE REPAIRS. INTERIOR REPAIRS LIMITED TO DAMAGED AREAS AT FRONT DWELLING UNITS ONLY ON CELLAR, FIRST, SECOND AND THIRD FLOORS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Mar 5, 2026 |
| B | W TIMES SQUARE HOTEL NYC DOB building permits | 8 | General Construction · Repair of exterior masonry and architectural concrete, installation of railing as per drawings filed herewith. No change to use, egress, or occupancy. No product keyword matched | 0 | Mar 5, 2026 |
| B | 4322442718 NYC DOB building permits | 8 | General Construction · APPLICATION FILING TO REMOVE WINDOW, DOOR AND NON BEARING PARTITION TO RESTORE EXISTING PARKING TO CONFORM CO#99814, DATED 01/20/41 TO ADDRESS ECB VIO#39171573R & 391171574Z AS PER PLAN AT BSMT FLOOR. NO CHANGE OF USE, EGRESS AND OCCUPANCY No product keyword matched | 0 | Mar 5, 2026 |
| B | EASTCHESTER-ASTOR, LLC NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK-TYPE ONLY TO LEGALIZE EXISTING HVAC UNITS. No product keyword matched | 0 | Mar 5, 2026 |
| B | FIRMDALE HOTELS NYC DOB building permits | 8 | General Construction · Obtain DOB approval for the addition of (3) awnings. Scope of work: general construction. No change in use, egress, or occupancy. No product keyword matched | 0 | Mar 5, 2026 |
| B | NEW LIFE FELLOWSHIP NYC DOB building permits | 8 | Sprinklers · Herewith filing new partial sprinkler system installation. Filed in conjunction with Alt 1- BIS application# 410021854. No change of use, egress, or occupancy. No product keyword matched | 0 | Mar 5, 2026 |
| B | LET ME BUILD, LLC NYC DOB building permits | 8 | General Construction · INTERIOR DEMOLITION OF ALL NON LOAD-BEARING PARTITIONS AS SHOWN ON THE DEMOLITION PLANS. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH APPLICABLE NYC DOB CODES AND REGULATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 5, 2026 |
| B | PRIVATE HOMEOWNER, BRONX NYC DOB building permits | 8 | Solar · SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS. No product keyword matched | 0 | Mar 5, 2026 |
| B | Casa Bottega LLC NYC DOB building permits | 8 | Mechanical Systems · Filing to install first floor store new kitchen exhaust system, hood and ductwork as per plans. No change in use, egress or occupancy. No product keyword matched | 0 | Mar 5, 2026 |
| B | AIMBRIDGE/HGI NY W 35TH NYC DOB building permits | 8 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus DecolaNO QEWI: FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Mar 5, 2026 |
| B | SRISTIENVONG INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF FINISHES FOR EXISTING EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 5, 2026 |
| B | NEW YORK PLUMBING-HEATING NYC DOB building permits | 8 | General Construction · It is proposed to demise a single retail tenant space into multi tenant spaces and change existing Use Group 10 to Use Group 6 as shown on plans. All tenant work to be filed under separate applications. No product keyword matched | 0 | Mar 5, 2026 |
| B | Myrtle Realty Group LLC NYC DOB building permits | 8 | Plumbing · Install New Plumbing fixtures @ cel and Cap and removal of fixtures (on 1st fl) No product keyword matched | 0 | Mar 5, 2026 |
| B | 143 WEST 87TH STREET TRUST NYC DOB building permits | 8 | Plumbing · Alterations to include renovations to the plumbing systems which include the installation of (1) new domestic hot water tank, new constant pressure set, sewage ejector pump, and new plumbing systems on all floors No product keyword matched | 0 | Mar 5, 2026 |
| B | BTM DEVELOPMENT PARTNERS NYC DOB building permits | 8 | Sprinklers · It is proposed to install plumbing and cooking equipment, and modify existing sprinkler system as shown on plans. no change to use, egress or occupancy. No product keyword matched | 0 | Mar 5, 2026 |
| B | fullcirclewellnes.com NYC DOB building permits | 8 | General Construction · NEW GROUND FLOOR LAYOUT No product keyword matched | 0 | Mar 5, 2026 |
| B | MARTINIQUE CURIO BY HILTON NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF 166 TON CAPACITY SPLIT SYSTEM FROM FLOOR 003 TO FLOOR 018, AS WELL AS A 25 TON COOLING TOWER ON THE ROOF. NO CHANGE TO ERGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Mar 5, 2026 |
| B | VAN NEST ASSEMBLY OF GOD NYC DOB building permits | 8 | Construction Fence · CONSTRUCTION OF TEMPORARY CONSTRUCTION FENCE No product keyword matched | 0 | Mar 5, 2026 |
| B | LOCUS CONSTRUCTION INC NYC DOB building permits | 8 | Structural · Structural work filed in conjunction with Alt-1 application #121206630 No product keyword matched | 0 | Mar 5, 2026 |
| B | CREATIVE CABLNG & BERTRAM NYC DOB electrical permits | 8 | Installing (1) 60 amp Service switch for Solar system No product keyword matched | 0 | Mar 5, 2026 |
| B | KEY FOODS NYC DOB building permits | 8 | Mechanical Systems · The interior renovation of existing 3 family dwelling units on the 2nd, 3rd and 4th floors in an existing four story building. No product keyword matched | 0 | Mar 4, 2026 |
| B | DICAMILLO PARTNERSHIP LP NYC DOB building permits | 8 | Boiler Equipment · REGISTER TWO (2) RESIDENTIAL BOILERS IN CELLAR. No product keyword matched | 0 | Mar 4, 2026 |
| B | CONSTRUXIVE CONTRAC INC NYC DOB building permits | 8 | Mechanical Systems · INSTALL ELECTRIC HVAC UNITS FOR 1 FAMILY DWELLING WITH ASSOCIATED DUCTS AS PER PLANS. No product keyword matched | 0 | Mar 4, 2026 |
| B | LUCKY K. CONTRACTING CO NYC DOB building permits | 8 | General Construction · CONVERT EX. 1 FAMILY DWELLING TO 2 FAMILY DWELLING & REPAIR DAMAGES INCLUDING GENERAL CONSTRUCTION INCLUDING COSMATIC FINISHES AS PER PLAN TO OBTAIN CERTIFICATE OF OCCUPANCY (CO). No product keyword matched | 0 | Mar 4, 2026 |
| B | BRIGHTON 4TH CONDO LLC NYC DOB building permits | 8 | Mechanical Systems · Installation of new HVAC system throughout New residential building No product keyword matched | 0 | Mar 4, 2026 |
| B | PLATINUM CONSTRUCTION GR NYC DOB building permits | 8 | General Construction · CHANGE OF USE IN CELLAR TO S-1, MODERATE HAZARD STORAGE OCCUPANCY ASPER PLAN. INSTALL NEW EGRESS STAIR AS PER PLAN. No product keyword matched | 0 | Mar 4, 2026 |
| B | JAMES EQUITIES LLC NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 4, 2026 |