Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Brooklyn Society for Ethical Cultur NYC DOB building permits | 8 | Sprinklers · Sprinkler plans filed herewith to show relocation of existing sprinkler heads for tenant fit-out space. No change to use, egress, or occupancy. No product keyword matched | 0 | Mar 11, 2026 |
| B | PALM TREE CONSTRUCTION CO |
| 8 |
Mechanical Systems · MECHANICAL WORK AS PER PLANS FILED HEREWITH No product keyword matched |
| 0 |
| Mar 11, 2026 |
| B | HTC CONSTRUCTION MANAGEMENT INC. NYC DOB building permits | 8 | Supported Scaffold · Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Mar 11, 2026 |
| B | K GROUP MGMT INC. NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF EXHAUST HOOD & DUCT AT EXISTING STORE (001). NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 11, 2026 |
| B | Mamun Bhuiyan NYC DOB building permits | 8 | Solar · Installation of 5.67 kw solar energy system on roof. No change of occupancy, use or egress. No product keyword matched | 0 | Mar 11, 2026 |
| B | RUBIN DEVELOPMENT AND CONSTRUCTION NYC DOB building permits | 8 | Construction Fence · INSTALL TEMPORARY CONSTRUCTION FENCE FOR ALT FILED UNDER DOB # Q01007637-I1 No product keyword matched | 0 | Mar 11, 2026 |
| B | EMPOWER GC INC NYC DOB building permits | 8 | General Construction · conversion exist 2-fam to 3-fam inside existing building footprint, no change to yards or bulk proposed under this application No product keyword matched | 0 | Mar 11, 2026 |
| B | SAFEGUARD INSTALLATION IN NYC DOB building permits | 8 | Suspended Scaffold · Installation of outrigger for facade repair & inspection. No product keyword matched | 0 | Mar 11, 2026 |
| B | MR. G PAINTING CORP NYC DOB building permits | 8 | General Construction · Renovation of existing Kitchen including removal of existing flooring, strip walls down to studs, remove existing ceiling, install new GWB new tile on floors, tile backsplash, cabinets, shelving and appliances. No product keyword matched | 0 | Mar 11, 2026 |
| B | HRT LLC NYC DOB building permits | 8 | General Construction · 1. AMENDMENT CERTIFICATE OF OCCUPANCY OF EXISTING 4-STORY MIX USED BUILDING (EXISTING C/O#3018440) 2. HEREWITH FILE TO AMEND USE GROUP AND TOTAL OCCUPANTS AND MINOR INTERIOR CONSTRUCTION WORK IN 1st FLOOR. NO BUILDING EXTENSION AND ENLARGEMENT. No product keyword matched | 0 | Mar 11, 2026 |
| B | 46-5334686 NYC DOB building permits | 8 | Plumbing · renovation of single-family home including modification of water, gas, and sanitary from existing services No product keyword matched | 0 | Mar 11, 2026 |
| B | MASTERCRAFT MULTICOLOR NYC DOB building permits | 8 | Sprinklers · INSTALL NEW WET PIPE SPRINKLER SYSTEM IN CELLAR, 1ST. AND 2ND. FLOORS. No product keyword matched | 0 | Mar 11, 2026 |
| B | 39TH ST LLC NYC DOB building permits | 8 | Plumbing · PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO #B00898676-I1 No product keyword matched | 0 | Mar 11, 2026 |
| B | BAHALS CUSTOM HOMES INC NYC DOB building permits | 8 | General Construction · HORIZONTAL ENLARGEMENT OF EXISTING 2-STORY 2-FAMILY HOUSE WITH INTERIOR RENOVATION No product keyword matched | 0 | Mar 11, 2026 |
| B | NINA DAYCARE NYC DOB building permits | 8 | General Construction · Application filed for a conversion of a two-family dwelling into a one family dwelling with 1 accessory Open Parking No product keyword matched | 0 | Mar 11, 2026 |
| B | BIX BUILDERS INC NYC DOB building permits | 8 | Construction Fence · Install 8' high construction fence around the property No product keyword matched | 0 | Mar 11, 2026 |
| B | BROSNA CONSTRUCTION CORPO NYC DOB building permits | 8 | General Construction · HEREWITH FILING FOR INTERIOR RENOVATION OF APT. 20G AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Mar 11, 2026 |
| B | PLATINUM PLUMBING HEATING & MECHANI NYC DOB building permits | 8 | Foundation · CONSTRUCT AN ACCESSORY DETACHED ONE CAR GARAGE IN CONJUNCTION WITH TWO FAMILY RESIDENCE No product keyword matched | 0 | Mar 11, 2026 |
| B | Philip Blessinger NYC DOB building permits | 8 | General Construction · Propose to extend the term of the Board of Standards and Appeals Variance and secure New Certificate of Occupancy. There is No Work Proposed under this application. No product keyword matched | 0 | Mar 11, 2026 |
| B | L.A.G CPONSTRUCTION INC NYC DOB building permits | 8 | General Construction · RENOVATION OF APARTMENT 3KS WITH MINOR PARTITION CHANGES AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 11, 2026 |
| B | The Muse New York NYC DOB building permits | 8 | Standpipe · REPLACEMENT OF EXISTING SPRINKLER SERVICE FIRE PUMP IN KIND CAPACITY. No product keyword matched | 0 | Mar 11, 2026 |
| B | 770 FOREST ASSETS NYC DOB building permits | 8 | General Construction · REPAIR / RESTORATION OF EXISTING PARTITIONS IN KIND AS OF LAYOUT BUILT IN 2008, NO CHANGE TO ROOM SIZES, DWELLING UNITS, OR MEANS OF EGRESS. TO INSTALL NEW SHEETROCK IN EXISTING PARTITIONS & CEILING AS OF WATER DAMAGE. PLUMBING TO REMAIN NO CHANGE IN BULK No product keyword matched | 0 | Mar 11, 2026 |
| B | 86 ST NY LLC NYC DOB building permits | 8 | Construction Fence · Herewith to propose a 8'ft temporary 8' high wood construction fence. No changes in occupancy, use group, or egress under this application. No product keyword matched | 0 | Mar 11, 2026 |
| B | EDEL FAMILY MANAGEMENT CORP NYC DOB building permits | 8 | Plumbing · Proposed accessory tenant laundry at cellar floor. Scope to include minor renovation. Also filing to address violation. no change in use, egress or occupancy. No product keyword matched | 0 | Mar 11, 2026 |
| B | MULBERRY RESTORATION INC NYC DOB building permits | 8 | General Construction · Interior renovation of apartment 4E No product keyword matched | 0 | Mar 11, 2026 |
| B | C&B.ELITEHOLDINGS NYC DOB building permits | 8 | General Construction · To address Bldg violation working without a permitNew 2-pc toilet at cellar; Interior renovation to include drop ceilings drywall, finishes, wall hung condenser plumbing filed subsequent filing, as per plan, no change in egress or occupancy No product keyword matched | 0 | Mar 11, 2026 |
| B | P HENDEL PRODUCTS- MCDONALD'S NYC DOB building permits | 8 | Mechanical Systems · Direct replacement of (3) condensing units on roof. No product keyword matched | 0 | Mar 11, 2026 |
| B | 413 REALTY NY LLC NYC DOB building permits | 8 | Mechanical Systems · HEREWITH FILING FOR INTERIOR RENOVATION. GENERAL CONSTRUCTION JOB NO. M00913255-I1 No product keyword matched | 0 | Mar 11, 2026 |
| B | C&L Trading USA NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION TO 2ND FLOOR AND 1ST FLOOR ENTRY TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Mar 11, 2026 |
| B | NORTHEAST ELEC'L CONTR'S NYC DOB electrical permits | 8 | Upgrade of a 400 amp service to 800 amps to combine meters into one. No product keyword matched | 0 | Mar 11, 2026 |
| B | WISE ELECTRIC SOLUTIONS NYC DOB electrical permits | 8 | APT#4R; NEW PANEL, NEW BEDROOM AC CKT, NEW D/W CKT, REPACING EXISTING OUTLETS, SWITCHES AND LIGHTS No product keyword matched | 0 | Mar 11, 2026 |
| B | LAILNYCINC NYC DOB building permits | 8 | Mechanical Systems · INSTALL NEW COMMERCIAL KITCHEN HOOD SYSTEM FOR COMMERCIAL STORE ON THE 1ST FLOOR , NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Mar 10, 2026 |
| B | JP GENERAL CONTRACTOR & NYC DOB building permits | 8 | Structural · SUBSEQUENT FILING FOR STRUCTURAL WORK. No product keyword matched | 0 | Mar 10, 2026 |
| B | A.M. SAGE PLG & HTG LLC NYC DOB building permits | 8 | Plumbing · INTERIOR ALTERATIONS TO A 2 FAMILY DWELLING. REPLACE HOT WATER HEATERS AND BOILERS IN CELLAR. REPLACE FIXTURES ON EXISTING ROUGHING IN BATHROOMS IN BASEMENT, FIRST THRU THIRD FLOORS. INSTALL NEW KITCHEN SINK AT BASEMENT. REMOVE SINK AND STOVE ON 3RD FL. No product keyword matched | 0 | Mar 10, 2026 |
| B | MARYMOUNT MANHATTAN COLLEGE NYC DOB building permits | 8 | Sprinklers · filing sprinkler application No product keyword matched | 0 | Mar 10, 2026 |
| B | DIN FUNG FLUSHING ESTATE 14066 LLC NYC DOB building permits | 8 | Boiler Equipment · PROPOSE TO INSTALL NEW BOILERS FOR THE NEW BUILDING. No product keyword matched | 0 | Mar 10, 2026 |
| B | 2838 HARDING AVE LLC NYC DOB building permits | 8 | General Construction · APPLICATION FILED TO RESTORE CELLAR TO PRIOR LEGAL CONDITIONS AS PER CO# 25449 AND TO RESOLVE ECB VIOLATIONS #35172380J, 35172381L AND 39137932K ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Mar 10, 2026 |
| B | 8515 GRAND REALTY LLC NYC DOB building permits | 8 | Plumbing · SUBSEQUENT FILING FOR PLUMBING & SPRINKLER WORK OF A PROPOSED 4 STORY MIXED USE RESIDENTIAL & COMMERCIAL BUILDING. No product keyword matched | 0 | Mar 10, 2026 |
| B | HUANG FAMILY PROPERTIES LLC NYC DOB building permits | 8 | Plumbing · PLUMBING WORK OF EXISTING 4-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 10, 2026 |
| B | JNR PLUMBING INC DBA NYC DOB building permits | 8 | Boiler Equipment · Installation of new boilers. emergency shut off switches and associated ventilation. No changes to use, occupancy or egress. No product keyword matched | 0 | Mar 10, 2026 |
| B | AMERICAN QUALITY CONSTRUC NYC DOB building permits | 8 | Full Demolition · FILING TO FULLY DEMOLISH THE DETACHED BUILDING BY HAND No product keyword matched | 0 | Mar 10, 2026 |
| B | NATURE MARKET 2 NYC DOB building permits | 8 | Plumbing · Subsequent filing to add plumbing work type to install new plumbing sanitary fixtures at 1st FL commercial space (1) three compartment sink, (2) hand-wash sinks, and (1) floor drain. Also, install (1) grease trap at cellar fl. Work as per plans. No product keyword matched | 0 | Mar 10, 2026 |
| B | CAPRI MANAGEMENT INC NYC DOB building permits | 8 | Boiler Equipment · REPLACE BOILER AND REINSTALL EXISTING GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 10, 2026 |
| B | BOTA PROPERTY MANAGEMENT LLC NYC DOB building permits | 8 | Plumbing · HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. ALT 1 SHOWING ROOM FILED UNDER BIS APPLICATION # 123724078. THIS APP DOES NOT REQUIRE A NEW OR AMENDED C. OF O. No product keyword matched | 0 | Mar 10, 2026 |
| B | INDUSTRIAL COOLING TCH IN NYC DOB building permits | 8 | Structural · STRUCTURAL WORK RELATED TO THE REPLACEMENT OF ONE (1) NEW COOLING TOWER AND FILTRATION SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 10, 2026 |
| B | HOMES FOR THE HOMELESS NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK TO BE DONE ON CELLAR,1ST AND 13TH FLOOR OF EXISTING 15 STORY BUILDING ONLY.NO CHANGE IN USE,MEANS OF EGRESS,OR OCCUPANCY. No product keyword matched | 0 | Mar 10, 2026 |
| B | 211 PROPERTY LLC NYC DOB building permits | 8 | Antenna · Modification to existing Verizon site. Replace 6 RRH units and replace the existing equipment platform including 2 new equipment cabinets and the relocation of 1 equipment cabinet on the roof. Replace 6 antennas, install 2 GPS units. Replace ships ladder No product keyword matched | 0 | Mar 10, 2026 |
| B | TOWER BUIDING GROUP INC NYC DOB building permits | 8 | General Construction · EXISTING 14 STORIES WITH PENTHOUSE REDIENTIAL FIREPROOF STEEL BUILDING. PROPOSED TO REPLACE EXISTING STAIRCASE AT PENTHOUSE C AS PER PLAN No product keyword matched | 0 | Mar 10, 2026 |
| B | SESSA'S LICENSED PLB&HTG NYC DOB building permits | 8 | Plumbing · APPLICATION IS FILED FOR PLUMBING WORK ASSOCIATED WITH INTERIOR ALTERATION OF EXISTING 2 STORY 1 FAMILY DWELLING. ALL WORK AS PER PLANS SUBMITTED HEREWITH. THIS APP WILL SUPERSEDE PLUMBING APP # B00883112-S1. No product keyword matched | 0 | Mar 10, 2026 |
| B | ALG NY MANAGEMENT NYC DOB building permits | 8 | General Construction · MINOR INTERIOR RENOVATION TO THE FIRST FLOOR COMMERCIAL SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 10, 2026 |