Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | E-Z PERMIT NY, LLC NYC DOB building permits | 8 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 16, 2026 |
| B |
| CHRISTIAN KUBEK DESIGN NYC DOB building permits |
| 8 |
Mechanical Systems · FILING HEREWITH FOR THE RENOVATION OF AN EXISITNG SINGLE FAMILY THREE STORY BUILDING .THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Mar 16, 2026 |
| B | THE WEBSTER APARTMENTS NYC DOB building permits | 8 | Plumbing · CONNECT REPLACEMENT GAS-FIRED BOILERS TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Mar 16, 2026 |
| B | 5110 OCEANVIEW LLC NYC DOB building permits | 8 | General Construction · EXISTING 2 FAMILY BUILDING WITH INTERIOR RENOVATION ON PARTITION WORK ON THE BASEMENT, 1ST & 2ND FLOORS TO REMOVE DOB VIOLATION #061324C24-01570. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | IDS MANAGEMENT L.L.C. NYC DOB building permits | 8 | Foundation · Structural, foundation, and earthwork plans filed in conjunction with NB application No product keyword matched | 0 | Mar 16, 2026 |
| B | 328 12TH ST DEVELOPMENT LLC NYC DOB building permits | 8 | Construction Fence · INSTALLATION OF PLYWOOD CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Mar 16, 2026 |
| B | NEW AGE PLUMBING MECHANIC NYC DOB building permits | 8 | Plumbing · PROPOSE PLUMBING WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | JABCO MANAGEMENT NYC DOB building permits | 8 | General Construction · Garage repair No product keyword matched | 0 | Mar 16, 2026 |
| B | 119-84 APARTMENTS CORPORATION NYC DOB building permits | 8 | Plumbing · RENOVATION OF EXISTING 2 BEDROOM APARTMENT. RECONFIGURATION OF KITCHEN. MINOR RECONFIGURATION OF INTERIOR NON-RATED PARTITIONS. RENOVATION OF TWO BATHROOMS. NO CHANGE TO EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | WESTERN WATERPROOFING COM NYC DOB building permits | 8 | General Construction · General Construction filing for removal and replacing material of all related parapet work as per drawings, No change of Egress, use or Occupancy. No product keyword matched | 0 | Mar 16, 2026 |
| B | 36-16 24TH AVENUE, LLC NYC DOB building permits | 8 | Plumbing · Installing three (3) new Navien boilers and one (1) hot water heater in the cellar. No product keyword matched | 0 | Mar 16, 2026 |
| B | Xincheng realty llc NYC DOB building permits | 8 | Mechanical Systems · JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 16, 2026 |
| B | Paleewong Realty Corp NYC DOB building permits | 8 | Plumbing · PLUMBING WORK IN APT 3D, FILED IN CONJUNCTION WITH GC APPLICATION M01308757-I1 No product keyword matched | 0 | Mar 16, 2026 |
| B | MAKKOS EQUITIES, LLC NYC DOB building permits | 8 | Structural · FILING STRUCTURAL WORK FOR SIDEWALK VAULT REPAIR. WORK TO INCLUDE NEW STEEL BEAMS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Mar 16, 2026 |
| B | ALDO 57 MANAGEMENT LLC NYC DOB building permits | 8 | Sign · INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (PAULIE GEE'S SLICE SHOP) No product keyword matched | 0 | Mar 16, 2026 |
| B | GREG ROTHSTEIN NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APT 3B ON THE THIRD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | ROBK & ROSA GROUP INC. DBADREAM BUI NYC DOB building permits | 8 | Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Mar 16, 2026 |
| B | ROMAN CATHOLIC CHURCH OF SAINT ANSE NYC DOB building permits | 8 | General Construction · FILING HEREWITH NO WORK APPLICATION TO UPDATE METES AND BOUNDS FOR ZONING LOT TO INCLUDE NEWLY CREATED TAX LOT 64. THE ZONING LOT BOUNDRY HASN'T CHANGED. SUBDIVISION APPLICATION 220212892 AND NB APPLICATION X00695344. No product keyword matched | 0 | Mar 16, 2026 |
| B | NEW YORK INSTITUTE SPECIAL EDUCATIO NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF ROOFTOP HVAC UNIT WITH A 10 TON CAPACITY. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | DOUGLAS HASSEBROEK AIA NYC DOB building permits | 8 | Plumbing · Relocations of plumbing vents, Plumbing fixtures for 2nd and 3rd floors only. No change of use, egress, or occupancy under this application. No product keyword matched | 0 | Mar 16, 2026 |
| B | Lost Borough Ice Cream NYC DOB building permits | 8 | Plumbing · Proposed plumbing work for a new ice cream store within an existing commercial space. Work limited to plumbing modifications only. No change to use, egress, or occupancy. No product keyword matched | 0 | Mar 16, 2026 |
| B | RANGER PROPERTIES NYC DOB building permits | 8 | Curb Cut · New 12'-0 curb cut including 2 - 1'-6 splays, to parking garage at Cellar for 86 cars, located on Fulton Street, 180'-1 1/2 east of Grand Avenue. No product keyword matched | 0 | Mar 16, 2026 |
| B | NORTHSIDE ARTS INDUSTRIES CONDOMINI NYC DOB building permits | 8 | General Construction · Repair and replace existing exterior building entrance stair No product keyword matched | 0 | Mar 16, 2026 |
| B | ANSTAT LLC NYC DOB building permits | 8 | General Construction · RENOVATION OF CELLAR, BASEMENT, FIRST, SECOND & THIRD FLOOR - 4 APARTMENTS WITH 1 BATHROOM, KITCHEN, LAUNDRY. NON-STRUCTURAL PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | CORJI CONTRACTING LLC NYC DOB building permits | 8 | General Construction · installation of new awning No product keyword matched | 0 | Mar 16, 2026 |
| B | EDGECOMBE PARC CONDOMINIUM NYC DOB building permits | 8 | General Construction · Facade repairs including pinning, hung lintel replacement, and aluminium cladding as per plans; no change to use, egress, or occupancy. No product keyword matched | 0 | Mar 16, 2026 |
| B | CITY COOL AIR INC NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH RESIDENTIAL INTERIOR REMODEL OF UNIT B-1B AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | ACROPOLIS RENOVATIONS LLC NYC DOB building permits | 8 | General Construction · Repairs to exterior wall finishes. No change to use, egress, or occupancy. No product keyword matched | 0 | Mar 16, 2026 |
| B | HORIZON CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · Interior Alteration - Replacing doors, cabinets, lighting, partitions and finishes throughout the office spaces. Removing and installing new walls, adding new ducts throughout. No change in use, egress or occupancy. No product keyword matched | 0 | Mar 16, 2026 |
| B | COLONNADE DINER INC. NYC DOB building permits | 8 | Plumbing · Remove existing gas piping from roof to floors 1-2 to cellar to grade. No change in use, egress, or occupancy. No product keyword matched | 0 | Mar 16, 2026 |
| B | QUENTIN AUTO CENTER NYC DOB building permits | 8 | Plumbing · NEW STORM AND SEWER CONNECTION TO EXISTING COMMERCIAL BUILDING No product keyword matched | 0 | Mar 16, 2026 |
| B | Donavan & Arlene Assoc LLC NYC DOB building permits | 8 | General Construction · FILING FOR MINOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 16, 2026 |
| B | CT SPORTS BAR INC NYC DOB building permits | 8 | Mechanical Systems · Register roof a/c condenser connected to existing utilities and equipment. No product keyword matched | 0 | Mar 16, 2026 |
| B | ROSE & STONE CONSTRUCTION NYC DOB building permits | 8 | General Construction · THIS APPLICATION IS TO CONVERT EXISTING 2 FAMILY RESIDENCE TO SINGLE FAMILY & INCLUDES REMOVAL OF BASEMENT REAR EXTENSION, WORK TO FRONT & REAR FACADE & INTERIOR RENOVATION. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Mar 16, 2026 |
| B | EM-PRO ELECTRIC INC NYC DOB electrical permits | 8 | General wiring of new kitchen area and new A/C split systemReplacing of electrical panels in the same locationsNo other work No product keyword matched | 0 | Mar 16, 2026 |
| B | TEAM H ELECTRIC LLC NYC DOB electrical permits | 8 | Store General Wiring 1st floor and Basement No product keyword matched | 0 | Mar 16, 2026 |
| B | TRIBOROUGH ELECTRIC, INC NYC DOB electrical permits | 8 | Single family house, general wiring. No product keyword matched | 0 | Mar 16, 2026 |
| B | AMPOL ELEC'L CONT. INC. NYC DOB electrical permits | 8 | general wiring 2nd floor No product keyword matched | 0 | Mar 14, 2026 |
| B | The Gilbert Condo NYC DOB building permits | 8 | General Construction · Refiling of application M00772881-I1, replace railing, and patch roof as necessary. No product keyword matched | 0 | Mar 13, 2026 |
| B | 1604 RAFFAELA L.L.C. NYC DOB building permits | 8 | Construction Fence · Construction fence filed for 35.00 linear feet. No product keyword matched | 0 | Mar 13, 2026 |
| B | RIVER CITY BUILDERS LLC NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold drops and change in height of outrigger frame No product keyword matched | 0 | Mar 13, 2026 |
| B | MDB DEVELOPMENT CORP NYC DOB building permits | 8 | General Construction · Repairs to the building North, East and West facade. No change in use, egress or occupancy. No product keyword matched | 0 | Mar 13, 2026 |
| B | GS 505 PARK LLC NYC DOB building permits | 8 | General Construction · Demolition of Existing Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on Part of 2nd Floor. No Change to Occupancy, Use or Egress is Proposed No product keyword matched | 0 | Mar 13, 2026 |
| B | C & A IRON WORKS NYC DOB building permits | 8 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 13, 2026 |
| B | K BUILDERS INC. NYC DOB building permits | 8 | Construction Fence · INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE. No product keyword matched | 0 | Mar 13, 2026 |
| B | BELMONT REALTY LLC NYC DOB building permits | 8 | General Construction · APP HEREWITH FILED, AS PER TPPN#3/97, TO COMBINE 8 APT. INTO 4 APT. AT 1ST FLOOR, LOCATED AT 2505 LORILLARD PLACE, BRONX NY. GENERAL CONSTRUCTION TO INCLUDE NEW OPENINGS AND MINOR INTERIOR WORK. NO CHANGE IN OCCUPANCY, USE EGRESS OR BULK. No product keyword matched | 0 | Mar 13, 2026 |
| B | ZSN DEVELOPMENT INC NYC DOB building permits | 8 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY HEAVY DUTY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 13, 2026 |
| B | S & N bhuiyan corp NYC DOB building permits | 8 | Plumbing · APPLICATION FILED FOR MINOR INTERIOR PLUMBING WORK, CONSISTING OF INSTALLATION OF TWO (2) NEW 4 FLOOR DRAINS, RELOCATION OF TWO (2) EXISTING FIXTURES, AND REMOVAL OF ONE (1) EXISTING FIXTURE. No product keyword matched | 0 | Mar 13, 2026 |
| B | D&F PLUMBING MECHANICAL I NYC DOB building permits | 8 | General Construction · RENOVATION AT EXISTING RESTAURANT. INSTALLING NEW BAR, NEW COUNTERTOPS, NEW FLOORING, NEW INTERIOR FINISHES AND NEW BATHROOM FRAMING. PLUMBING TO BE FILED SEPARATELY. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 13, 2026 |
| B | DETAIL RENOVATIONS INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APARTMENT 6A. NEW FIXTURES, FINISHES, AND PARTITIONS PER PLANS. No product keyword matched | 0 | Mar 13, 2026 |