Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | AKAM MANAGEMENT NYC DOB building permits | 8 | Suspended Scaffold · OUTRIGGERS SYSTEM INSTALLATION , MATERIAL HOIST AND INSPECTION FOR FACADE REPAIRS. No product keyword matched | 0 | Mar 19, 2026 |
| B | 260 PARK AVENUE SOUTH CONDOMINIUM NYC DOB building permits |
| 8 |
Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE & BARRICADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 0 |
| Mar 19, 2026 |
| B | SHIMUNOV LAW FIRM NYC DOB building permits | 8 | Construction Fence · temporary construction fence, 8' high No product keyword matched | 0 | Mar 19, 2026 |
| B | Frances NYC DOB building permits | 8 | Solar · INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 11 MODULES, 4.51 KW No product keyword matched | 0 | Mar 19, 2026 |
| B | ARC ELECTRICAL&MECHANICAL CONTRACTO NYC DOB building permits | 8 | Construction Fence · installation of construction fence to protect site, during full demolition No product keyword matched | 0 | Mar 19, 2026 |
| B | DEENA REALTY NYC DOB building permits | 8 | Structural · FILING GC/ST FOR FACADE AND SLAB REPAIR, INCLUDING REPLACEMENT OF CRACKED AND SPALLED BRICK AND PATCHING AND SORING OF CELLAR CEILING No product keyword matched | 0 | Mar 19, 2026 |
| B | TERMINAL WAREHOUSE NYC DOB building permits | 8 | General Construction · INSTALL (1) SCHEDULE 40 INSULATED STEEL EXHAUST FLUE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. ALL STRUCTUAL DETAILS, ENCLOSURE FILED UNDER ALT. 123490070,M00483643. No product keyword matched | 0 | Mar 19, 2026 |
| B | LEVELS UPP SOLUTION CORP NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION IN EXISTING 4-FAMILY 2-STY, RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 0 | Mar 19, 2026 |
| B | CORNER STONE ARCHITECT NYC DOB building permits | 8 | Plumbing · INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 19, 2026 |
| B | Brooklyn Troy LLC NYC DOB building permits | 8 | General Construction · PROPOSED INTERIOR RENOVATION AND REPLACE WINDOWS No product keyword matched | 0 | Mar 19, 2026 |
| B | FENGYET PROPERTY LLC NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK FOR EXHAUST HOOD AND HVAC SYSTEM IN EXISTING EATING & DRINKING ESTABLISHMENT ON THE FIRST FLOOR. No product keyword matched | 0 | Mar 19, 2026 |
| B | CAPITOL AWNING CO INC NYC DOB building permits | 8 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING APPROVED UNDER NYC LANDMARK PRESERVATION COMMISSION DOCKET# 26-06266 - MANDELLI. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 19, 2026 |
| B | BERN COMPANIES INC NYC DOB building permits | 8 | General Construction · INTERIOR DEMOLITION OF NON-LOADING PARTITIONS ON THE 3RD FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 19, 2026 |
| B | PAZMINO CONCRETE & CONST NYC DOB building permits | 8 | General Construction · FILING HEREWITH PLANS AND APPLICATION TO REPAIR DAMAGE CAUSED BY FIRE, THROUGH OUT CELLAR, FIRST, SECOND FLOORS AND ATTIC. RESTORE PROPERTY BACK TO LEGAL 2-FAMILY DWELLING. NO CHANGE IN USE/EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 19, 2026 |
| B | 7h Realty LLC NYC DOB building permits | 8 | General Construction · REPAIR OF GARAGE. No product keyword matched | 0 | Mar 19, 2026 |
| B | STANLEY LEWIS P & H CORP NYC DOB building permits | 8 | Sprinklers · PLUMBING AND SPRINKLER WORK TYPES IN CONJUNCTION WITH ALT 1 JOB# 321588126 No product keyword matched | 0 | Mar 19, 2026 |
| B | TOTAL RENOVATION & MANAGE NYC DOB building permits | 8 | General Construction · interior renovation for dwelling unit #2 in existing residential building. no change in bulk , use, occupancy or egress of building is proposed under this application. No product keyword matched | 0 | Mar 19, 2026 |
| B | ELITE CONTRACTING & DESIGN LLC NYC DOB building permits | 8 | General Construction · APPLICATION FILE TO EXTERIOR FACADE REPAIR AS STUCCO WORK IN FRONT OF BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 19, 2026 |
| B | GREAT GOLD SUMMIT LLC. NYC DOB building permits | 8 | Construction Fence · Install temporary construction fence in conjunction with NB 220704995. No change to use, occupancy or egress. No product keyword matched | 0 | Mar 19, 2026 |
| B | ALMONTE HEIGHTS FOOD CORP NYC DOB building permits | 8 | Structural · STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION DOBNOW#B00518982-I1 No product keyword matched | 0 | Mar 19, 2026 |
| B | TWINS ELECTRIC OF NY INC NYC DOB electrical permits | 8 | reinstate application for T Mobile sign 1 of 2 , T Mobile is not a tenant at the premises any more ; the signs is no longer there and space is vacant No product keyword matched | 0 | Mar 19, 2026 |
| B | LC ELECTRICAL POWER CORP NYC DOB electrical permits | 8 | Main Electrical Work for Service, power and lighting No product keyword matched | 0 | Mar 19, 2026 |
| B | MPS PLUMBING & HEATING IN NYC DOB building permits | 8 | Plumbing · APPLICATION HEREWITH FILED TO PROPOSE RELOCATE 3PC BATHROOM IN 1ST FLOOR, NEW 2 PC BATHROOM IN CELLAR, NEW HWH, NEW MOP SINK, No product keyword matched | 0 | Mar 18, 2026 |
| B | C&A realty holdings LLC NYC DOB building permits | 8 | Structural · NEW 2 STORY ADDITION ON LEFT SIDE AND MEZZANINE IN EXISTING AUTO REPAIR SHOP No product keyword matched | 0 | Mar 18, 2026 |
| B | HOLLISWOOD 2AVE LLC NYC DOB building permits | 8 | General Construction · INSTALLATION OF TEMPORARY ROOFTOP MOCKUP FOR LANDMARKS (LPC) REVIEW. No product keyword matched | 0 | Mar 18, 2026 |
| B | SITE ENTER INC NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF NEW DUCTED AND CASSETTE UNIT HEAT PUMP SYSTEM FOR KITCHEN, DINING AREA, LOCKER ROOM AND SPA AREA WITH ALL DUCT DISTRIBUTION AND AIR OUTLETS. No product keyword matched | 0 | Mar 18, 2026 |
| B | S&H PLUMBING,INC NYC DOB building permits | 8 | Plumbing · plumbing work associated wth the interior renovation of the apartment as shown on plans filed herewith. No change to use, egress, or occupancy. No product keyword matched | 0 | Mar 18, 2026 |
| B | FSC D&C LLC NYC DOB building permits | 8 | General Construction · WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. No product keyword matched | 0 | Mar 18, 2026 |
| B | SHOWCASE DESIGNS CORP NYC DOB building permits | 8 | Plumbing · HEREWITH FILE TO CAP AND REMOVE 1 WATER CLOSETS, 1 LAVS, 1 WALL-MOUNT FOUNTAIN, 2 HAND SINK, 2 FLOOR DRAIN, 1 DISHWASHER AND 1 PERP SINK NO CHANGE TO USE, EGRESS OR OCCUPANY. No product keyword matched | 0 | Mar 18, 2026 |
| B | GMP ENTERPRISES INC. NYC DOB building permits | 8 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022. No product keyword matched | 0 | Mar 18, 2026 |
| B | Studio Romi NYC DOB building permits | 8 | Mechanical Systems · Mechanical work in conjunction with renovation No product keyword matched | 0 | Mar 18, 2026 |
| B | CHPE LLC NYC DOB building permits | 8 | Mechanical Systems · Proposed mechanical units and related duct work within building, all as per plan. No change to use, occupancy or egress. No product keyword matched | 0 | Mar 18, 2026 |
| B | STANLEY RUTH CO LLC NYC DOB building permits | 8 | Mechanical Systems · Proposed installation of new perimeter terminal air conditioning and heating units (PTAC) at living room and bedrooms. No change in use, occupancy or egress under this application. No product keyword matched | 0 | Mar 18, 2026 |
| B | FOREST CITY JAY STREET ASSOCIATES, NYC DOB building permits | 8 | Plumbing · Installation of the (1) 6 domestic backflow device. No change in use egress or occupancy. No product keyword matched | 0 | Mar 18, 2026 |
| B | John Fleming Inc. NYC DOB building permits | 8 | General Construction · THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING DELI AND INSTALL NEW COMMERCIAL KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR FIRE SYSTEM . NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Mar 18, 2026 |
| B | 8030 Realty LLC NYC DOB building permits | 8 | Plumbing · SUBSEQUENT FILING FOR PLUMBING WORK AT CELLAR AND 2ND FLOOR OF EXISTING TWO STORY BUILDING WITH EXISTING COMMERCIAL SPACE & PROPOSED 2 FAMILY. SPRINKLER WORK AT 2ND FLOOR (RESIDENTIAL) ONLY. No product keyword matched | 0 | Mar 18, 2026 |
| B | NH EXPEDITING AND CONSULTING LLC NYC DOB building permits | 8 | Plumbing · PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION CONVERTING AN EXISTING TWO-FAMILY DWELLING TO A SINGLE-FAMILY RESIDENCE. No product keyword matched | 0 | Mar 18, 2026 |
| B | PLRS RESTORATION LLC NYC DOB building permits | 8 | Structural · PROPOSED FIRE DAMAGE REPAIR. WINDOW REPLACEMENT, MINOR INTERIOR CLEAN-UP & PAINTING. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK. No product keyword matched | 0 | Mar 18, 2026 |
| B | J & R BRONX REALTY LLC NYC DOB building permits | 8 | Sign · Propose to install non-advertising sign. No change in use, egress, or occupancy. No product keyword matched | 0 | Mar 18, 2026 |
| B | TRANSMISSION DEVELOPERS NYC DOB building permits | 8 | Mechanical Systems · Proposed HVAC units within auxiliary enclosures with associate piping and duct work. No change of use, egress or occupancy. No product keyword matched | 0 | Mar 18, 2026 |
| B | THE BROOKLYN STANDARD III NYC DOB building permits | 8 | Plumbing · PLUMBING WORK AS PER PLAND FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Mar 18, 2026 |
| B | NEW YORK H&Y CONSTRUCTION INC NYC DOB building permits | 8 | Solar · Installation of Solar panels on existing roof structure, No change in use, egress or occupancy. No product keyword matched | 0 | Mar 18, 2026 |
| B | CPEOA, LIMITED PARTNERSHIP NYC DOB building permits | 8 | Structural · APPLICATION BEING FILED FOR STRUCTURAL WORK TO PROPOSE FIRST FLOOR ROOF TOP DUNNAGE FOR MAKEUP AIR UNIT. No product keyword matched | 0 | Mar 18, 2026 |
| B | EDGAR BAYRAMI LLC NYC DOB building permits | 8 | Mechanical Systems · Mechanical work performed in conjunction with Interior Renovations of Apartment Unit 10C. No Change to Use, Egress or Occupancy under this application. No product keyword matched | 0 | Mar 18, 2026 |
| B | MASJID NUR AL ISLAM, INC NYC DOB building permits | 8 | General Construction · NEW EIGHT (8) STORY AND CELLAR COMMUNITY FACILITY BUILDING (HOUSE OF WORSHIP / SEMINARY / RECTORY) No product keyword matched | 0 | Mar 18, 2026 |
| B | KK LION CONSTRUCTION INC NYC DOB building permits | 8 | Curb Cut · Proposed work filed for Expansion of the width of an existing curb cut serving a shared driveway along the property frontage, 10' 0' including splays to improve vehicular access at 319 E 235 Street No product keyword matched | 0 | Mar 18, 2026 |
| B | NTT Properties LLC NYC DOB building permits | 8 | General Construction · Facade repairs to include masonry, pointing, sills, terracotta units, and partial parapet reconstruction. No product keyword matched | 0 | Mar 18, 2026 |
| B | Vista Tower Condominium NYC DOB building permits | 8 | Suspended Scaffold · CD5 RENEWAL No product keyword matched | 0 | Mar 18, 2026 |
| B | FACADE RES GROUP LLC NYC DOB building permits | 8 | Structural · PARAPET REPAIR WORK AS PER PLANS TO COMPLY WITH VIOLATION # V062125CCER01DY; AND ECB VIOLATION # 35667908N. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Mar 18, 2026 |
| B | Sura nyc llc NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF EXISTING STORE No product keyword matched | 0 | Mar 18, 2026 |