Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Noir Bar NYC DOB building permits | 8 | Plumbing · Plumbing work type filing to renovate existing restaurant space. no change to existing use, egress or occupancy. No product keyword matched | 0 | Mar 23, 2026 |
| B | J. PHELAN CONSTRUCTION CO NYC DOB building permits |
| 8 |
General Construction · GENERAL CONSTRUCTION ON THE CELLAR (Concourse marketing floor), 1ST AND 2ND FLOORS AS PLANS FILED FOR HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Mar 23, 2026 |
| B | JSD CONSTRUCTION GROUP IN NYC DOB building permits | 8 | General Construction · APPLICATION FOR MINOR INTERIOR RENOVATION AT APT 14N INCLUDING NEW PARITIONS, CABINETS, PAINTING AND FINISHES. NO CHANGE TO USE, EGRESS OF OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | Hellfire Hot Chicken llc NYC DOB building permits | 8 | General Construction · APPLICATION FOR MINOR INTERIOR RENOVATION FOR EXIST. COMMERCIAL SPACE AS PER PLAN. IT INCLUDES MECHANICAL EXHAUST HOODS AND DUCTS FOR COMMERCIAL KITCHEN AND MINI-SPLITS. FIRE SUPPRESSION FILED TO FDNY. PLUMBING IN DOB NOW. NO CHANGE IN USE EGRESS OR OCCUP No product keyword matched | 0 | Mar 23, 2026 |
| B | BRINKS INC. NYC DOB building permits | 8 | Foundation · FOUNDATION WORK FOR SLAB ON GRADE REPLACEMENT AND NEW PILES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | Eye D Bayside, LLC NYC DOB building permits | 8 | General Construction · Propose renovation at 1st Floor of existing commercial space with partition work and finish work as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | Mar 23, 2026 |
| B | DYNAMIC CONSTRUCTION OF NYC DOB building permits | 8 | General Construction · RENOVATION OF TWO-FAMILY RESIDENTIAL DWELLING. WORK INCLUDES RELOCATION OF NON-BEARING PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Mar 23, 2026 |
| B | SIGMA MAINTENANCE AND RESTORATION C NYC DOB building permits | 8 | Construction Fence · Herewith filed for an 8 ft plywood construction fence No product keyword matched | 0 | Mar 23, 2026 |
| B | AMORELLI REALTY NYC DOB building permits | 8 | Mechanical Systems · Install 2 HVAC systems in the basement and condenser units on the roof. No change in use, egress, or occupancy. No product keyword matched | 0 | Mar 23, 2026 |
| B | A&R CONSTRUCTION GROUP OF NYC DOB building permits | 8 | General Construction · ROOF PARAPET REPAIR No product keyword matched | 0 | Mar 23, 2026 |
| B | 11TH ST WORKSHOP.COM NYC DOB building permits | 8 | General Construction · Install temporary structure-greenhouse. No alteration to existing structures. TPA Permit not required. Producer responsible to monitor safety & implement HWAP. No product keyword matched | 0 | Mar 23, 2026 |
| B | BASILE INC NYC DOB building permits | 8 | Structural · HEREWITH FIING THE PROPOSED WORK INCLUDES REPAIRES TO THE CORRODED COMPOSITE METAL DECK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | YESHIVAS NOVOMINSK NYC DOB building permits | 8 | Antenna · Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 2 GPS antennas and 1 equipment platform with cabinets. Related conduits on the facade and service connection in the cellar. No product keyword matched | 0 | Mar 23, 2026 |
| B | An Excelsior Elevator, Corp. NYC DOB building permits | 8 | Plumbing · FILING HEREWITH PLANS AND APPLICATION TO INSTALL 2 PC BATHROOM ( LAV, TOILET ) AND NEW LAUNDRY AREA ( 2 WASHER, 1 GAS DRYER ) (1 HWH & 1 HEATER ) ON FIRST FLOOR. AND REPLACE WALL MOUNTED BOILER ON SECOND FLOOR. No product keyword matched | 0 | Mar 23, 2026 |
| B | PARADISE CONSTRCTION NYC DOB building permits | 8 | Protection and Mechanical Methods · APPLICATION FILE TO 1NSTALLATION OF DEBRIS CHUTE AT FRONT ELEVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 23, 2026 |
| B | MASTER BUILDING IMPROVE NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AT CELLAR TO RESOLVE VIOLATION AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Mar 23, 2026 |
| B | 3225 REALTY CORP NYC DOB building permits | 8 | Curb Cut · it is proposed to install curb cut located on the south side of Van Courtlandt 94.4 feet from corner. No product keyword matched | 0 | Mar 23, 2026 |
| B | TwoTwoFour Hall LLC NYC DOB building permits | 8 | General Construction · ERECTION OF TEMPORARY STRUCTURE FOR LPC REVIEW No product keyword matched | 0 | Mar 23, 2026 |
| B | 2980 RICHMOND TERRACE LLC NYC DOB building permits | 8 | General Construction · INSTALLATION OF NEW STUCCO FINISH ON FRONT (NORTH) ELEVATION FOR 1 STORY BUILDING. NO CHANGE IN USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 23, 2026 |
| B | BOOMERANG DEVELOPMENT GROUP CORP NYC DOB building permits | 8 | Plumbing · install plumbing fixtures and related piping as per plans No product keyword matched | 0 | Mar 23, 2026 |
| B | IMRAN ALAM NYC DOB building permits | 8 | General Construction · removal and installation of interior non load bearing partitions No product keyword matched | 0 | Mar 23, 2026 |
| B | TONGS MANAGEMENT CORP. NYC DOB building permits | 8 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | APF Syndicate Corporation NYC DOB building permits | 8 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | OPTIMUM BUILDING RESTORA NYC DOB building permits | 8 | Suspended Scaffold · SUSPENDED SCAFFOLD FOR FACADE RESTORATION AS SHOWN ON PLANS No product keyword matched | 0 | Mar 23, 2026 |
| B | BOLT BUILDS INC NYC DOB building permits | 8 | General Construction · General Construction taking place on the 1st Floor as per plans filed herewith. No change in Use, Egress, or Occupancy. No product keyword matched | 0 | Mar 23, 2026 |
| B | TRIARCH MANAGEMENT INC. NYC DOB building permits | 8 | Plumbing · PL SCOPE: INTERIOR RENOVATION OF UNITS: LB, 1A, 1B+1C, 1F+1G, 1G+1H, 1L+1M, 1M+1N, 2C+2D, 2D+2E, 2F+2G, 2L+2M, 3B+3C, 3C+3D, 4F+4G, 4H+4J, 5A+5B, 5B+5C, 5E+5F, 5D+5E, 5H+5J, 5M+5N, 6E+6F, 6F+6G, 6K+6J, 6M+6N No product keyword matched | 0 | Mar 23, 2026 |
| B | W PRODUCT & SUPPLIES CORP NYC DOB building permits | 8 | General Construction · Install an aluminum frame fiberglass canopy at front of building. No change in use, occupancy or egress. No product keyword matched | 0 | Mar 23, 2026 |
| B | CHAMPION HOME REMODELING NYC DOB building permits | 8 | General Construction · REMOVE SELECT INTERIOR NON-BEARING PARTITIONS, DOOR, AND FINISHES WITHIN EXISTING LAUNDRY AND HALF-BATH AREA. CONSTRUCT NEW NON-LOAD-BEARING PARTITIONS. INSTALL NEW WALL-MOUNTED CABINETS AND CUSTOM SHELVING IN LAUNDRY AREA. No product keyword matched | 0 | Mar 23, 2026 |
| B | ALEX' 33RD ST LAUNDROMAT INC NYC DOB building permits | 8 | Plumbing · INSTALLATION OF NEW GAS 2 LINE IN SLEEVE FROM METER TO NEW LAUNDROMAT SEVEN (7) DOUBLE STACK DRIERS. INSTALLATION OF NEW WATER HEATER No product keyword matched | 0 | Mar 23, 2026 |
| B | METROPOLITAN TOWER CONDOMINIUM NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF THE RESIDENTIAL COOLING TOWER AND CONDENSER WATER PIPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | STUDIO PUBLIC LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT. REMOVE AND INSTALL NON-STRUCTURAL PARTITIONS AND FINISHES. REPLACE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 23, 2026 |
| B | The Terrace Lounge NYC DOB building permits | 8 | Plumbing · Plumbing work in conjunction to GC application X01081190-I1 for the interior renovation of exist. commercial space to accommodate new bar & lounge. Exist. men's toilet to be relocated and exist. kitchen fixtures to be replaced and add new. No product keyword matched | 0 | Mar 23, 2026 |
| B | AARCO CONTRACTOR, LLC NYC DOB building permits | 8 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Mar 23, 2026 |
| B | SPIRALWORLD NYC DOB building permits | 8 | General Construction · HEREWITH FILE ALTERATION TYPE ONE IN ORDER TO DEMOLISH AND ERECT INTERIOR PARTITIONS, TO ADD & REMOVE STAIRCASE, TO ADD NEW BATH IN BASEMENT/1ST FL AND TO REPLACE PLUMBING FIXTURES IN EXISTING TWO STORY & BASEMENT BRICK BUILDING AND OBTAIN AN AMENDED C.O. No product keyword matched | 0 | Mar 23, 2026 |
| B | SUNKEEPER SOLAR LLC NYC DOB electrical permits | 8 | Install (42) Solar Panels, 17KW AC System No product keyword matched | 0 | Mar 23, 2026 |
| B | ICAS ELECTRICAL SVCS INC NYC DOB electrical permits | 8 | Replace Main Panel No product keyword matched | 0 | Mar 23, 2026 |
| B | THE PIANO FACTORY CORPORATION NYC DOB building permits | 8 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE INSPECTION. No product keyword matched | 0 | Mar 22, 2026 |
| B | A. J. CARUSO ELECTRICAL I NYC DOB electrical permits | 8 | GENERAL WIRING OF NEW 2 FAMILY HOME - PERMIT IS supercede OF 1456 CASTLETON No product keyword matched | 0 | Mar 22, 2026 |
| B | SHIN-YANG CONSTRUCTION IN NYC DOB building permits | 8 | General Construction · THE ALTERATION OF ROOM LAYOUT AT 1ST FLOOR OF AN EXISTING 1.5-STORY SINGLE FAMILY HOUSE WITH CELLAR. NO NEW CERTIFICATE OF OCCUPANCY IS REQUIRED. No product keyword matched | 0 | Mar 20, 2026 |
| B | A R W HOME IMPROVEMENTS * NYC DOB building permits | 8 | General Construction · FILING TO ADDRESS VIOLATION #39056535M TO INSTALL THE STAIRCASE FROM 1ST FLR TO BSMT TO REMOVE, REPLACE SUBFLR, FINISH FLOORING, REMOVAL, REPLACEMENT OF FRAMED PARTITIONS, REMOVAL, REPLACEMENT OF KITCHEN CABINETS. STRUCTURAL SYSTEM WILL NOT BE ALTERED. No product keyword matched | 0 | Mar 20, 2026 |
| B | F.I. LANDSCAPING CORP D/B/A F. I. C NYC DOB building permits | 8 | Mechanical Systems · RENOVATION OF EXISTING TRIPLEX APARTMENT. THIS ALTERATION WILL CONSIST OF THE RENOVATION OF BATHROOMS AND GENERAL PARTITION WALLS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 20, 2026 |
| B | 337 E 18 St NYC DOB building permits | 8 | Mechanical Systems · Installation of mechanical system in conjunction with alteration application # M01317557-I1. No product keyword matched | 0 | Mar 20, 2026 |
| B | U.S. CREMATION/COLUMBARIUM & FRESH NYC DOB building permits | 8 | General Construction · REPLACEMENT OF EXISTING CREMATION CHAMBERS WITH NEW INSTALLATION OF NEW CREMATOR STACKS UP TO ROOF. NO CHANGE OF USE, EGRESS AND OCCUPANCY No product keyword matched | 0 | Mar 20, 2026 |
| B | Fergs LLC NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH PROPOSED RENOVATION IN EXISTING COMMERCIAL SPACE TO BE USED AS EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NEW HEATING SYSTEM AND KITCHEN EXHAUST SYSTEM. No product keyword matched | 0 | Mar 20, 2026 |
| B | MILLER PLUMBING & HTG INC NYC DOB building permits | 8 | Sprinklers · Hereby filing to install new sprinkler heads and related piping for corridor outside the townhouses as shown on plans filed herewith. NO change to use, occupancy or egress. No product keyword matched | 0 | Mar 20, 2026 |
| B | HARLEY CONTRACTING INC NYC DOB building permits | 8 | General Construction · PROPOSED LEGALIZATION OF RENOVATION TO AN EXISTING CONCRETE STEPS @ EXPOSURE #4, NEW CONCRETE PATIO@ 3XPOSURE #3 AND NEW CONCERETE DRIVEWAY @ EXPOSURE #1 OF AN EXISTING 2 FAMILY DWELLING AND REMOVAL OF STOP WORK ORDER AND ECB VIOLATION #39153188L No product keyword matched | 0 | Mar 20, 2026 |
| B | MTA NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. THE PIPE SCAFFOLD FROM THE TOP OF THE SIDEWALK SHED TO PAST THE MAIN ROOF PARAPET No product keyword matched | 0 | Mar 20, 2026 |
| B | CONTELLO TOWERS NO# 2 NYC DOB building permits | 8 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 0 | Mar 20, 2026 |
| B | ENTERLINE TRUST NYC DOB building permits | 8 | Plumbing · Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application. No product keyword matched | 0 | Mar 20, 2026 |
| B | ST JOSEPH OF THE HOLY FAMILY NYC DOB building permits | 8 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. No product keyword matched | 0 | Mar 20, 2026 |