Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,518
Tier S19
New this week155
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
B220 Riverside Blvd at Trump Place
NYC DOB building permits
8
Plumbing · PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 35D ON THE 35TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Mar 26, 2026
BMEGA CONSTRUCTION SVCS IN
Seer chat
NYC DOB building permits
8
Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
No product keyword matched
0
Mar 26, 2026
B451 CLASSON REALTY CORP.
NYC DOB building permits
8
General Construction · FILING TO ADDRESS ECB VIOLATION# 39072412M, LEGALIZING REAR DECK, REPLACE CEILING JOIST AT 3RD FLOOR APT# 3R, INSTALL MINOR PARTITION TO ENLARGE BOILER RM AT CELLAR FL, INTERIOR FINISHES THROUGHOUT CELLAR.
No product keyword matched
0Mar 26, 2026
BOSMAN REALTY LLC
NYC DOB building permits
8
Suspended Scaffold · INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
No product keyword matched
0Mar 26, 2026
BHERMIS REALTY ASSOC
NYC DOB building permits
8
Mechanical Systems · REPLACEMENT OF EXHAUST HOOD & DUCT AT CELLAR KITCHEN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0Mar 26, 2026
BCKS CONSTRUCTION INC
NYC DOB building permits
8
General Construction · INTERIOR CRACK REPAIRS AROUND THE WINDOWS AND CEILING SPALL REPAIRS ON 5TH AND 6TH FLOORS AND EXTERIOR FACADE BRICK POINTING AND MINOR CRACK REPAIRS.
No product keyword matched
0Mar 26, 2026
B3 QUINCY CORP
NYC DOB building permits
8
General Construction · REPAIR OF A DAMAGED SECTION OF THE PARAPET WALL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
No product keyword matched
0Mar 26, 2026
Bmcdonalds
NYC DOB building permits
8
Mechanical Systems · REPLACEMENT OF [2] 20TON ROOF UNITS ON THE ROOF OF AN EXISITING 1 STORY COMMERCIAL BUILDING
No product keyword matched
0Mar 26, 2026
BAG CONSTRUCTION GROUP INC
NYC DOB building permits
8
Mechanical Systems · Installation of mechanical HVAC system, including heating & cooling equipment, ventilation duct work, fans and mechanical piping.
No product keyword matched
0Mar 26, 2026
BMoishe Gruber
NYC DOB building permits
8
Solar · FILING HEREWITH APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Mar 26, 2026
BSEGA RENOVATION INC.
NYC DOB building permits
8
General Construction · REPAIR MULTIPLE CRACKS AND MISSING MORTAR AT EXPOSURE #1, ELM PLACE (RIGHT SIDE OFBUILDING) TO COMPLY ECB VIOLATION #35719351R. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
No product keyword matched
0Mar 26, 2026
BFamous Distributions USA
NYC DOB building permits
8
Curb Cut · New curb cut to comply ECB violation & stop work order, no change use, egress, and occupancy.
No product keyword matched
0Mar 26, 2026
BPARK HILL DESIGN INC.
NYC DOB building permits
8
Structural · REPAIR AND SISTERED EXISTING SAGGED WOOD JOISTS UNIT 1R, KITCHEN AND BATHROOM FLOOR AREAS ARE CAVING IN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
No product keyword matched
0Mar 26, 2026
BWeber Realty Management LLC
NYC DOB building permits
8
Structural · Overhead cellar ceiling repair.
No product keyword matched
0Mar 26, 2026
BESTUDIO ESMERO ARCHITECTURE PLLC
NYC DOB building permits
8
General Construction · PROPOSED INTERIOR RENOVATION OF UNIT 16D. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Mar 26, 2026
BUS SHELTECH INC
NYC DOB building permits
8
Boiler Equipment · FILING FOR NEW BOILERS
No product keyword matched
0Mar 26, 2026
BEXCLUSIVE RESTORATION & DEVELOPMENT
NYC DOB building permits
8
Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0Mar 26, 2026
BKaled Management Corp.
NYC DOB building permits
8
General Construction · HEREWITH FILING FOR THE REPLACEMENT OF AN EXISTING NON-STRUCTURAL 4-INCH CONCRETE SLAB LOCATED IN THE FRONT YARD, DIRECTLY FRONTING MANTON STREET AND WATERPROOFING AROUND BRICK WALL AS PER PLANS.
No product keyword matched
0Mar 26, 2026
BLIU AND JIANG 340 LLC
NYC DOB building permits
8
General Construction · REMOVE AND ERECT PARTIAL PARTITION WALL AND INTERIOR RENOVATION ON CEL, BAS, 1ST & 2ND FLOOR. NO CHANGE IN USE GROUP, EGRESS AND OCCUPANCY. (TOTAL: EXSITING TWO FAMILY DWELIING UNITS UNDER CO # 121138/1948)
No product keyword matched
0Mar 26, 2026
BMAVEN CONSTRUCTION CORP.
NYC DOB building permits
8
General Construction · TEMPORARY TENT INSTALLATION
No product keyword matched
0Mar 26, 2026
BJRM 250 REALTY LLC
NYC DOB building permits
8
General Construction · Adding a lift at the exterior of the building from floor 1-3, No change in occupancy, egress or use.
No product keyword matched
0Mar 26, 2026
BDANANG TEA HOUSE
NYC DOB building permits
8
Mechanical Systems · INTERIOR RENOVATION OF STORE INCLUDING A COMMERCIAL KITCHEN WITH KITCHEN HOOD AND DUCT WORK ON 1ST FLOOR
No product keyword matched
0Mar 26, 2026
BLLDP REALTY CO
NYC DOB building permits
8
Sign · PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING Haagen - Dazs
No product keyword matched
0Mar 26, 2026
B268 W REALTY INC.
NYC DOB building permits
8
Sign · FILING TO LEGALIZE ILLUMINATED WALL SIGN (MONA LISA BAKERY)
No product keyword matched
0Mar 26, 2026
BSILVER STAR IMPROVEMENTS
NYC DOB building permits
8
General Construction · PROPOSED INTERIOR RENOVATION TO EXISTING MEDICAL OFFICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
No product keyword matched
0Mar 26, 2026
BPLUS ELECTRIC INC
NYC DOB electrical permits
8
PSK 721 - BROOKLYN OCCUPATIONAL TRAINING CENTER - LIGHTING RETROFIT - SUSTAINABLE ENERGY
No product keyword matched
0Mar 26, 2026
BAA SAFETY ELECTRIC INCORP
NYC DOB electrical permits
8
Job # QOI360203-1I WIRE A SING AT THE SHOP.SIGN SHOP INSPECTION DIMENSION 12.33"" X 3.5""=43.15 SF.
No product keyword matched
0Mar 26, 2026
BVANGUARD MAINTENANCE &
NYC DOB electrical permits
8
Installation of current sensors in apartment panels to monitor KEFs and DEFs
No product keyword matched
0Mar 26, 2026
BALESSANDRO PLUMBING, INC
NYC DOB building permits
8
Plumbing · REMOVE GAS STOVE AND ASSOCIATED GAS PIPING, LEGALIZE BATHTUB
No product keyword matched
0Mar 25, 2026
BTIFFANY & CO
NYC DOB building permits
8
General Construction · Install of temp scenic partitions and elements, no alt to exist structures, for Tiffany Exhibit. TPA not required, TUP filed as needed. Producer is responsible to monitor site safety. All prod equip removed upon event completion
No product keyword matched
0Mar 25, 2026
BLOWER EAST SIDE COALITION HOUSING D
NYC DOB building permits
8
Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
No product keyword matched
0Mar 25, 2026
BFORTE CONSTRUCTION CORP
NYC DOB building permits
8
Construction Fence · Proposed fence work in conjunction with Alteration CO DOB# M08022861 and as required to resolve violation 39522878J
No product keyword matched
0Mar 25, 2026
BLANE REFRIGERATION CO.,IN
NYC DOB building permits
8
Mechanical Systems · DEMOLISH EXISTING SPLIT UNIT, AND PROVIDE NEW VRF STSTEM TO EXISTING OFFICE SPACE.
No product keyword matched
0Mar 25, 2026
BGRGS3 LLC
NYC DOB building permits
8
Plumbing · Installation of new gas fired equipment and plumbing fixtures file in conjunction with ALT CO #B01286184-I1
No product keyword matched
0Mar 25, 2026
BMEDIDENTAL GROUP LLC
NYC DOB building permits
8
Plumbing · PLUMBING FIXTURES AS PER PLANS FOR DENTAL OFFICE AT FIRST FLOOR.
No product keyword matched
0Mar 25, 2026
BHEAVY DUTY BUILDERS LLC
NYC DOB building permits
8
General Construction · APPLICATION IS FILED FOR INTERIOR DEMOLITION ANDRENOVATION IN CELLAR THAT DOESN'T AFFECT USE, EGRESS OROCCUPANCY OF THE SPACE, AND THEREFORE, NO NEW OR AMENDEDCERTIFICATE OF OCCUPANCY IS REQUIRED
No product keyword matched
0Mar 25, 2026
BRESCUE MINISTRIES CHURCH
NYC DOB building permits
8
Plumbing · Plumbing Application in conjunction with G.C. Application.
No product keyword matched
0Mar 25, 2026
BPARK CONSTRUCTION CORP
NYC DOB building permits
8
Plumbing · Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
No product keyword matched
0Mar 25, 2026
BCAPA SONS GENERAL CONSTRUCTION INC
NYC DOB building permits
8
General Construction · legalization of horizontal and vertical enlargement of existing 1 family house , structural repair to remove violation for unsafe building
No product keyword matched
0Mar 25, 2026
BCP OF UES, INC.
NYC DOB building permits
8
Plumbing · FILING FOR PLUMBING WORK FOR TENANT FITOUT - CLUB PILATES
No product keyword matched
0Mar 25, 2026
B75 Lewis Avenue LLC
NYC DOB building permits
8
General Construction · Tenant Protection Plan filed in conjunction with Alt1# 321595190.
No product keyword matched
0Mar 25, 2026
BHALAL & HOLY NY
NYC DOB building permits
8
Plumbing · DUE TO NEW TENANT EXISTING INTERIOR RENOVATION WORK INCLUDING KITCHEN SETUP REPAIR .WORK WILL TAKE PLACE ONLY AT 1ST FLOOR. NO CHANGE USE EGRESS OR OCCUPANCY.
No product keyword matched
0Mar 25, 2026
BNEW ROC INTERIORS, LLC
NYC DOB building permits
8
Structural · Structural work associated with the upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
No product keyword matched
0Mar 25, 2026
BMotto by Hilton New York Times Squa
NYC DOB building permits
8
Sign · ERECT ILLUMINATED ACCESSORY BUSINESS DOUBLE -FACED BLADE WALL SIGN B
No product keyword matched
0Mar 25, 2026
BROBERT A. LENAHAN ARCHITECT PC
NYC DOB building permits
8
Suspended Scaffold · FACADE REPAIRS, SCAFFOLD INSPECTIONS, 3 MEN LETTER
No product keyword matched
0Mar 25, 2026
BDWECK FAMLY LP
NYC DOB building permits
8
General Construction · NO CHANGE EXISTING FIRST FLOOR COMMERCIAL SPACE. EXISTING VACANT SECOND-FLOOR SPACE CONVERT USE FROM 2 DWELLING UNITS TO AMEND CERTIFICATE OF OCCUPANCY.
No product keyword matched
0Mar 25, 2026
BLAKEWOOD INTERIOR INC
NYC DOB building permits
8
Mechanical Systems · Mechanical work in conjunction with apartment renovation.
No product keyword matched
0Mar 25, 2026
BPALADINO CONSTRUCTION ENT
NYC DOB building permits
8
General Construction · INTERIOR FRAMING REPAIRS FOR VAULT AT SUB-CELLAR LEVEL AS PER PLANS. WORK UNDER THIS APPLICATION IS FOR VAULT INTERIOR ONLY, NO WORK AT SIDEWALK OR ROADWAY ABOVE. NO CHANGE IN USE EGRESS OR OCCUPANCY.
No product keyword matched
0Mar 25, 2026
BOUR LADY OF SORROWS CHURCH
NYC DOB building permits
8
Structural · DOME FRAMING REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Mar 25, 2026
BBALKAN INC
NYC DOB building permits
8
General Construction · Interior renovation proposed in existing unit #2C on the 2nd and 3rd floor. Subsequent plumbing application to be filed. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
No product keyword matched
0Mar 25, 2026
Showing 15,451–15,500 of 16,520
PreviousNext