Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | SIFT CAKES AND COOKIES NYC DOB building permits | 7 | Plumbing · FILING TO ADD WATER CLOSET AND LAVATORY. No product keyword matched | 0 | Dec 12, 2025 |
| C | IMPRESSIVE RESTORATION NYC DOB building permits | 7 | General Construction · Construction work for renovation and addition to house to refile application # 401532579 and Obtain new Certificate of Occupancy. |
| 0 |
| Dec 12, 2025 |
| C | CRYSTAL REAL ESTATE MANAGEMENT INC. NYC DOB building permits | 7 | Structural · WOOD FLOOR JOIST FRAMING REPAIRS IN APARTMENT 3D, NO CHANGE IN, USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Dec 12, 2025 |
| C | ACS Networking NYC DOB building permits | 7 | Suspended Scaffold · Alpha and Gamma sector location inspection No product keyword matched | 0 | Dec 12, 2025 |
| C | HUNGRY CATERPILLARS NYC DOB building permits | 7 | Plumbing · Proposed Plumbing Work for the Installation of a new Mop Sink and a New Pantry Sink. No change of use, egress, or occupancy under this application No product keyword matched | 0 | Dec 12, 2025 |
| C | RALPH LOPEZ NYC DOB building permits | 7 | General Construction · MINOR FACADE REPAIR TO ADDRESS VIOLATION # 39163978P. No product keyword matched | 0 | Dec 12, 2025 |
| C | GFX SITE DEVELOPMENT INC NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION TO INCLUDE NEW PARTITIONS AND FINISHES. NEW PLUMBING FIXTURES AT LOCKER ROOMS AND BATHROOMS. PLUMBING WORK TO BE FILED UNDER A LAA APPLICATION. NO CHANGES TOOCCUPANCY USE OR EGRESS. No product keyword matched | 0 | Dec 12, 2025 |
| C | TASCA DON PEDRO NYC DOB building permits | 7 | General Construction · PROPOSED INTERIOR RENOVATION AT EXISTING 1st FLOOR COMMERCIAL SPACE. DEMOLITION OF THE EXISTING NON-BEARING INTERIOR WALLS AND PARTITIONS. No product keyword matched | 0 | Dec 12, 2025 |
| C | METROPOLITYAN MUSEUM OF ART NYC DOB building permits | 7 | General Construction · Roof and limited masonry repairs related to roof work and flashing as per drawings. No change in use, egress or occupancy is involved under this application. No product keyword matched | 0 | Dec 12, 2025 |
| C | TD NAILS LOUNGE INC NYC DOB building permits | 7 | General Construction · Propose to install awning. No change in use, egress, or occupancy. No product keyword matched | 0 | Dec 12, 2025 |
| C | APN BUILDERS LLC NYC DOB building permits | 7 | Mechanical Systems · HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR CANYON COFFEE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 12, 2025 |
| C | PENELOPE 91 LLC NYC DOB building permits | 7 | Mechanical Systems · FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH BUILDING RENOVATION AS PER PLANS. No product keyword matched | 0 | Dec 12, 2025 |
| C | 752 E 53DR STREET GROUP LLC NYC DOB building permits | 7 | General Construction · CONVERT EXISTING (3) THREE DWELLING UNITS (3 STORY BUILDING) TO (6)SIX DWELLING UNITS (4 STORY W/BULKHEAD). PROPOSED 1 FLOOR VERTICAL EXTENSION OF NEW 4TH FLOOR W/BULKHEAD. OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Dec 12, 2025 |
| C | RL MECHANICAL SERVICES NYC DOB building permits | 7 | Mechanical Systems · Mechanical application for two (2) new condensing units two (2) new hoods, Pot wash and other related mechanical work as per plans filed herewith. No product keyword matched | 0 | Dec 12, 2025 |
| C | RUBELLCO NYC DOB building permits | 7 | Structural · FACADE REPAIR AS PER PLANS. FILED FOR FACADE WORK PERMIT ONLY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 12, 2025 |
| C | RAJESH PATEL LIBERTY MEDICAL PLAZA NYC DOB building permits | 7 | Construction Fence · Install temporary construction fence in conjunction with NB 421461769 No product keyword matched | 0 | Dec 12, 2025 |
| C | DSA MANAGEMENT CO., INC. NYC DOB building permits | 7 | Structural · REPLACE SIDEWALK AND STEEL BEAM FOR EXISTING VAULT No product keyword matched | 0 | Dec 12, 2025 |
| C | SABORDECOLOMBIA 2 RESTAURANT & BAKE NYC DOB building permits | 7 | Plumbing · INSTALLATION OF KITCHEN GAS COOKING EQUIPMENT AND PLUMBING FIXTURES No product keyword matched | 0 | Dec 12, 2025 |
| C | A C INTERIOR GROUP INC NYC DOB building permits | 7 | General Construction · Select interior renovation of existing school. No change in use, egress or occupancy. No product keyword matched | 0 | Dec 12, 2025 |
| C | BKLYN 11201 LLC NYC DOB building permits | 7 | Construction Fence · Herewith filing a construction fence in conjunction with New Building # 320911741 No product keyword matched | 0 | Dec 12, 2025 |
| C | A1 STONE CONSTRUCTION INC NYC DOB building permits | 7 | General Construction · Proposed interior renovation at 1st floor commercial space of eating & drinking establishment with partitions work and finish work as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | Dec 12, 2025 |
| C | 3320 WPR LLC NYC DOB building permits | 7 | Plumbing · Plumbing work in conjunction with alteration type 1 to convert basement into a class a dwelling unit. And to address plumbing aspect of related violations quoted under alteration type 1 application #X01033777. No product keyword matched | 0 | Dec 12, 2025 |
| C | GREENWICH ASSOCIATES NYC DOB building permits | 7 | Mechanical Systems · REPLACEMENT (3) GAS ROOFTOP UNITS AND (6) CONDENSER SYSTEMS. NO CHANGE USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 12, 2025 |
| C | Golden Steer NYC DOB building permits | 7 | Plumbing · INSTALLATION OF NEW PLUMBING FIXTURES AND RELATED PIPING IN CELLAR AND AT FIRST FLOOR IN CONJUNCTION WITH INSTALLATION OF COMMERCIAL COOKING SYSTEM IN 1ST FLOOR KITCHEN AS INDICATED ON FLOOR PLANS. No product keyword matched | 0 | Dec 12, 2025 |
| C | REALITY CONSTR INC (SCA) NYC DOB building permits | 7 | General Construction · HEREBY FILING GENERAL CONSTRUCTION WORK AT CELLAR LEVEL OF EXISTING ONE FAMILY DWELLING AS PER PLANS No product keyword matched | 0 | Dec 12, 2025 |
| C | MERLO CONSTRUCTION INC NYC DOB building permits | 7 | General Construction · Interior Renovation only for Apt#33H. No change of use, egress or occupancy under this application. No product keyword matched | 0 | Dec 12, 2025 |
| C | HOME OWNERS NYC DOB building permits | 7 | Construction Fence · Temporary plywood construction No product keyword matched | 0 | Dec 12, 2025 |
| C | SIGNATURE AUDIO DESIGN LLC NYC DOB building permits | 7 | Construction Fence · Temporary construction fence No product keyword matched | 0 | Dec 12, 2025 |
| C | DISCOVER.GREEN RENEWABLE NYC DOB building permits | 7 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 0 | Dec 11, 2025 |
| C | 663 VANDERBILT AVENUE LLC NYC DOB building permits | 7 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH WITH COMMERCIAL TENANT FITOUT FOR SMALL 1ST FLOOR WINE BAR. INSTALL PLUMBING FIXTURES AND PIPING AT 1ST FLOOR AND CELLAR. No product keyword matched | 0 | Dec 11, 2025 |
| C | EMPOWER CES LLC NYC DOB building permits | 7 | Solar · Installation of roof mounted solar panels. No change in use, egress, and occupancy No product keyword matched | 0 | Dec 11, 2025 |
| C | 100 PARK TERRACE WEST OWNERS CORP. NYC DOB building permits | 7 | General Construction · CONSTRUCT TENANT LAUNDRY ROOM ON THE 1st FLOOR TO COMPLY WITH ECB VIOLATIONS: 39137774Y, 39137776H & 39137775X No product keyword matched | 0 | Dec 11, 2025 |
| C | CONEY ISLAND REALTY NY, LLC NYC DOB building permits | 7 | General Construction · Construction of one story storage area (ROOF ONLY) as horizontal extension of one story existing Motor Vechcle Repair and Welding and Crafting facility (as per CoO 218507); no heating, cooling, electical lighting, plumbing in the proposed storage. No product keyword matched | 0 | Dec 11, 2025 |
| C | PREMINGER LAND LLC NYC DOB building permits | 7 | General Construction · DRIVEWAY RAMP APPLICATION SERVING 600 & 580 CROWN ST INDOOR PARKING IN CONJUNCTION WITH NB JOB #B00608472 JOB #301828048 No product keyword matched | 0 | Dec 11, 2025 |
| C | Zara USA Inc NYC DOB building permits | 7 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Dec 11, 2025 |
| C | 49 WEST 12TH TENANTS CORP NYC DOB building permits | 7 | Suspended Scaffold · File-SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FAADE RESTORATION AND INSPECTION. No product keyword matched | 0 | Dec 11, 2025 |
| C | Roberrt E Hill Inc NYC DOB building permits | 7 | Suspended Scaffold · OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 11, 2025 |
| C | Atlantic Remica Holdings, LLC NYC DOB building permits | 7 | General Construction · Installation of 1 new ceiling mounted gas unit heater and 3 existing ceiling mounted gas unit heaters to remain. Secure Certificate of Compliance for all mechanical units. No change in use, egress or occupancy. No product keyword matched | 0 | Dec 11, 2025 |
| C | J.V.S. CONTRACTING GROUP NYC DOB building permits | 7 | General Construction · Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy No product keyword matched | 0 | Dec 11, 2025 |
| C | H.M. HUGHES CO. INC NYC DOB building permits | 7 | Mechanical Systems · Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. No product keyword matched | 0 | Dec 11, 2025 |
| C | NEW HORIZON COUNSELING CENTER NYC DOB building permits | 7 | General Construction · INSTALLATION OF PARTITION SHAFT WALLS FOR ELEVATOR AND REPAIRS TO EXISTING ROOF AS SHOWN ON DRAWINGS FILED HEREWITH. No product keyword matched | 0 | Dec 11, 2025 |
| C | NORTHFIELD BANK NYC DOB building permits | 7 | Mechanical Systems · DIRECT REPLACEMENT OF (1) ROOFTOP HVAC SINGLE PACKAGE UNIT ONTO EXISTING ROOF CURB. No product keyword matched | 0 | Dec 11, 2025 |
| C | MEYER REALTY MGMT NYC DOB building permits | 7 | General Construction · INSTALLATION OF COMMERCIAL ENTRANCE RAMP AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 11, 2025 |
| C | FRANKO DESIGN LLC NYC DOB building permits | 7 | General Construction · Remove Existing 25'-0 high non load bearing wall and install a 19'-0 high non load bearing wall. on an 8 thick CMU wall 6'-0 high 2 hour Fire Rated partition above. No change in use or occupancy or egress No product keyword matched | 0 | Dec 11, 2025 |
| C | COAST BUILDING MANAGEMENT NYC DOB building permits | 7 | Mechanical Systems · INSTALLATION OF HVAC No product keyword matched | 0 | Dec 11, 2025 |
| C | 171 TENANTS CORP. NYC DOB building permits | 7 | Plumbing · Replace plumbing fixtures in kitchen and bathrooms. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 11, 2025 |
| C | 153 grand llc NYC DOB building permits | 7 | General Construction · Interior renovation at existing ground floor commercial space only. No change in use, occupancy and egress. No product keyword matched | 0 | Dec 11, 2025 |
| C | WESTBETH CORP. HDFC INC. NYC DOB building permits | 7 | General Construction · REMOVE FUEL OIL TANK. No product keyword matched | 0 | Dec 11, 2025 |
| C | LOYAL CONSTRUCTION INC NYC DOB building permits | 7 | General Construction · REPAIR OUTER FOUNDATION WALL AT XP 1 & 4 AS PER COMPLAINT #2414751. WORK INCLUDES REMOVAL OF DETERIORATED CMU BLOCKS AND LOOSE MORTAR, REPLACEMENT WITH NEW MASONRY UNITS OF MATCHING SIZE AND STRENGTH, RE-POINTING OF CRACKED OR MISSING JOINTS, AND SEALING No product keyword matched | 0 | Dec 11, 2025 |
| C | MID COUNTY MECHANICAL COR NYC DOB building permits | 7 | Mechanical Systems · INSTALL VENTILATION SYSTEM FOR TWO STORAGE ACETYLENE ROOMS ON THE FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 11, 2025 |