Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Staten Island University Hospital NYC DOB building permits | 8 | Mechanical Systems · REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, AC UNITS AND RELATED MECHANICAL PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 1, 2026 |
| B | 240 BROADWAY PROPERTY LLC |
| 8 |
General Construction · INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE TO RESTAURANT WITH ACCESSORY STORAGE. No product keyword matched |
| 0 |
| Apr 1, 2026 |
| B | RED SNAPPER LATIN CUISINE LLC NYC DOB building permits | 8 | Plumbing · TO INSTALL TWO ADDITIONAL COOKING EQUIPMENT WITH GAS PIPING AND TO RELOCATE TWO PLUMBING FIXTURES ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Apr 1, 2026 |
| B | HSH124 INC. NYC DOB building permits | 8 | Mechanical Systems · Mechanical work in conjunction with ot filing # B00693050-I1 No product keyword matched | 0 | Apr 1, 2026 |
| B | Heavenly market & deli NYC DOB building permits | 8 | Sign · ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 1, 2026 |
| B | CHRIST CHURCH NYC DOB building permits | 8 | Mechanical Systems · the installation of a 4 ton Mitsubishi City Multi split AC system (ACC1 outdoor unit connected to all 3 indoor units) No product keyword matched | 0 | Apr 1, 2026 |
| B | SAHAI DEVELOPMENT CORP NYC DOB building permits | 8 | Construction Fence · INSTALLATION OF 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE FOR PROPOSED ALTERATION FILED UNDER APPLICATION NUMBER Q00934209 No product keyword matched | 0 | Apr 1, 2026 |
| B | 132-05 LIBERTY AVE CORP NYC DOB building permits | 8 | Construction Fence · Installation of temporary construction fences as per plan. No product keyword matched | 0 | Apr 1, 2026 |
| B | Lakeview Owners NYC DOB building permits | 8 | General Construction · This filing supersedes expired Application No. 310074040 (2008) for the purpose of obtaining final sign-off. No additional work is proposed. All previously completed work under Application 310074040 is resubmitted herein for review and closure. No product keyword matched | 0 | Apr 1, 2026 |
| B | Z-CAR-D CORP NYC DOB building permits | 8 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - ZARA. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 1, 2026 |
| B | AMC REALTY HOLDINGS LLC NYC DOB building permits | 8 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 1, 2026 |
| B | HUNTERS POINT SO HOUSING DEVELOP NYC DOB building permits | 8 | Suspended Scaffold · INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE AND LOCAL LAW INSPECTION No product keyword matched | 0 | Apr 1, 2026 |
| B | BRUTUS 10517 LLC NYC DOB building permits | 8 | Plumbing · installation of unit heater and gas service and gas meter installation. No product keyword matched | 0 | Apr 1, 2026 |
| B | VIN-RAY PLUMBING & HEATIN NYC DOB building permits | 8 | Plumbing · CAP AND REMOVE ILLEGAL PLUMBING FIXTURES IN CELLAR TO RESTORE TO LEGAL CONDITION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 1, 2026 |
| B | THE BERKELEY CARROLL SCHOOL NYC DOB building permits | 8 | Mechanical Systems · Filing for mechanical work at the 1st floor. No change to use, egress, or occupancy. No product keyword matched | 0 | Apr 1, 2026 |
| B | 1041 ELDER AVENUE LLC NYC DOB building permits | 8 | Structural · INSTALLATION OF NEW CONCRETE FOOTINGS, WOOD/STEEL COLUMNS & BEAMS TO REPAIR DAMAGED EXISTING WOOD STUD PARTITION WALLS IN THE CELLAR OF EXISTING 2-STORY BUILDING TO RESOLVE VIOL. #39126055Y. NO ENLARGEMENTS OR REMOVAL OF EXISTING FLOORS PROPOSED. No product keyword matched | 0 | Apr 1, 2026 |
| B | Fordham Hill Owners Corp. NYC DOB building permits | 8 | Sprinklers · HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE SUB-CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCPY. No product keyword matched | 0 | Apr 1, 2026 |
| B | MARQUIS PLUMBING & HEATING CO., INC NYC DOB building permits | 8 | Plumbing · Minor plumbing work related to minor renovation to existing bath in apt 27C. No change to use, egress or occupancy. No product keyword matched | 0 | Apr 1, 2026 |
| B | RUTTURA & SONS CONSTRUCTI NYC DOB building permits | 8 | Protection and Mechanical Methods · Use of telehandler for site servicing during building constructions. This application is filed in conjunction with NB Q01002920-S1 No product keyword matched | 0 | Apr 1, 2026 |
| B | ZTECH BUILDING SOLUTIONS INC NYC DOB building permits | 8 | General Construction · FACADE REPAIR, INCLUDES RECONSTRUCTION OF FRONT PARAPET WALL. No product keyword matched | 0 | Apr 1, 2026 |
| B | BELLET CONSTRUCTION CO.IN NYC DOB building permits | 8 | General Construction · FACADE REPAIR No product keyword matched | 0 | Apr 1, 2026 |
| B | CMN PAINTING&RENOVATION* NYC DOB building permits | 8 | General Construction · Partial demolition of non-load bearing partitions, doors, floor & wall finishes. New work is new doors, flooring, remodeled Kitchen & Bathroom finishes, hard wired SD/CO detectors. Plumbing to be filled under an LAA. No change to use, egress or occupancy. No product keyword matched | 0 | Apr 1, 2026 |
| B | c/o Seth P. Markowitz , P.C. NYC DOB building permits | 8 | General Construction · Tenant fit-out for Jersey Mike's Subs at this location. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Apr 1, 2026 |
| B | MEDCO ELECTRICAL CONTRACTING, INC. NYC DOB electrical permits | 8 | ELECTRICAL PERMIT TO INSTALL [49] 590 WATT PANELS OF MULTIPLE STRINGS OF RANGING NUMBER OF PANELS, SIZE 10 FEEDERS CONNECTING TO [2] SMA 13,000 WATT INVERTERS. INVERTER OUTPUTS COMBINED IN COMBINER BOX WITH TWO 3POLE 40 AMP BREAKERS SIZE 6 FEEDERS CONNECTING TO 3POLE 100AMP UNFUSED DISCONNECT, SIZE #1 SERVICE ENTRANCE CONDUCTORS CONNECTING TO 100A BREAKER IN MAIN SERVICE PANEL. No product keyword matched | 0 | Apr 1, 2026 |
| B | EMMAR LLC NYC DOB building permits | 8 | Curb Cut · PROPOSED 18' CURB CUT. No product keyword matched | 0 | Mar 31, 2026 |
| B | ECOSYSTEM ENERGY SERVICES NYC DOB building permits | 8 | Mechanical Systems · MODIFICATIONS & REPLACEMENT TO EXISTING HVAC SYSTEM THROUGHOUT BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Mar 31, 2026 |
| B | KNIGHTS INTERIORS INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION ON APARTMENT 4E ON 4TH FLOOR INCLUDING NON-STRUCTURAL DEMOLITION AND INSTALLATION OF INTERIOR WALLS AND FINISHES AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Mar 31, 2026 |
| B | MEDITERRANEAN MARBLE&TIL* NYC DOB building permits | 8 | General Construction · HEREWITH FILED FOR MINOR INTERIOR RENOVATION TO APT 3F AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 31, 2026 |
| B | 141 S 5TH LLC NYC DOB building permits | 8 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Mar 31, 2026 |
| B | PAMELA DELORME NYC DOB building permits | 8 | Antenna · Modification of existing Verizon site. Replace 9 antennas and 3 RRH units on the roof. Remove 4 RRHs and install 4 RRHs and install 1 equipment rack in existing shelter on roof. No product keyword matched | 0 | Mar 31, 2026 |
| B | NAVILLUS CONTRACTING NYC DOB building permits | 8 | Protection and Mechanical Methods · Installation and use of temporary telehandlers as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 0 | Mar 31, 2026 |
| B | EMPIRE MANAGEMENT & CON* NYC DOB building permits | 8 | Construction Fence · TEMPORARY CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCUPPANCY UNDER THIS APPLICATION No product keyword matched | 0 | Mar 31, 2026 |
| B | M&R HOTEL MANAGEMENT NYC DOB building permits | 8 | General Construction · FACADE REPAIRS NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 0 | Mar 31, 2026 |
| B | SLSCO,LTD NYC DOB building permits | 8 | Mechanical Systems · Mechanical modifications taking place on 1st floor as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 0 | Mar 31, 2026 |
| B | NYC BAR ASSOCIATION NYC DOB building permits | 8 | Plumbing · MODIFICATION TO EXISTING PLUMING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY/ No product keyword matched | 0 | Mar 31, 2026 |
| B | BORREGO NYC DOB building permits | 8 | General Construction · Installation of ESS (Battery energy Storage system) units No product keyword matched | 0 | Mar 31, 2026 |
| B | ARYEH REALTY CORP. NYC DOB building permits | 8 | General Construction · PROPOSED INTERIOR RENOVATION ON 1ST FLOOR(APT. #2). CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 31, 2026 |
| B | QUALITY & RUSKIN APTS CORP. NYC DOB building permits | 8 | General Construction · Restoration existing parking garage including garage roof replacement as per plans submitted. No changes to the egress, use or occupancy under this application. No product keyword matched | 0 | Mar 31, 2026 |
| B | 302 WEST 13TH ST LLC NYC DOB building permits | 8 | Foundation · Foundation work No product keyword matched | 0 | Mar 31, 2026 |
| B | SATELLITE EAST PLBG. INC NYC DOB building permits | 8 | Sprinklers · MODIFICATION TO AN EXISTING SPRINKLER SYSTEM FOR COMPLIANCE WITH LOCAL LAW 26/04. NO CHANGE OF USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 31, 2026 |
| B | SAJIUN ELECTRIC INC. NYC DOB electrical permits, NYC DOB building permits | 8 | General Wiring No product keyword matched | 0 | Mar 31, 2026 |
| B | PARADISE COURT LLC NYC DOB building permits | 8 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Mar 31, 2026 |
| B | STERLING GROUP CAPITAL LLC NYC DOB building permits | 8 | General Construction · EXISTING 6 STORY RESIDENTIAL BUILDING. PROPOSED INTERIOR RENOVATION AT APARTMENT 3D. NO CHANGE IN OCCUPANCY, BULK, OR EGRESS. No product keyword matched | 0 | Mar 31, 2026 |
| B | FLUX FACTORY, INC. NYC DOB building permits | 8 | Sprinklers · INTERIOR ALTERATIONS TO SPRINKLER SYSTEM IN GROUND FL UNIT, INCLUDING NEW SPRINKLER BRANCH LINES AND HEADS AND RELOCATIONS OF EXISTING SPRINKLER BRANCHES/HEADS, RELATED AND SUBSEQUENT TO Q01178190-I1 No product keyword matched | 0 | Mar 31, 2026 |
| B | WEISS REALTYLLC NYC DOB building permits | 8 | Plumbing · Job filed as Subsequent filing for job#X01262649-I1(GC) to Legalize WORK WITHOUT A PERMIT for Plumbing work at: APT#4E On existing Apartments Building in order to remove ECB violation #39129743L and The Partial stop work order as for plans submitted No product keyword matched | 0 | Mar 31, 2026 |
| B | SILVER RAIL ASSOC INC NYC DOB building permits | 8 | General Construction · Renovation of existing unit PHA to include removal & installation of partitions and stair. No change in use, egress, or occupancy No product keyword matched | 0 | Mar 31, 2026 |
| B | Delphi Plumbing Heating Inc NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF SYSTEM SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Mar 31, 2026 |
| B | SOLOMON EQUITIES NYC DOB building permits | 8 | Sign · ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Mar 31, 2026 |
| B | TIPTOP REALTY MANAGEMENT CORP. NYC DOB building permits | 8 | General Construction · Job application filed to address Violations FEU40502BS & FEU40501BS indicating work completed under DOB application # Q08046521-I1. No change of use, egress or occupancy. No product keyword matched | 0 | Mar 31, 2026 |
| B | PHIL VALENZA CONTRACTING NYC DOB building permits | 8 | Structural · PROPOSE TO ENLARGE EXISTING ONE CAR GARAGE No product keyword matched | 0 | Mar 31, 2026 |