Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,518
Tier S19
New this week155
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BDBA: JOSEPH LOPARDO ESQ.
NYC DOB building permits
8
Curb Cut · Installation of New Curb Cut Associated with NB Filing S00953409-I1
No product keyword matched
0Apr 2, 2026
B753 CLASSON AVENUE HOUSING COMPANY
NYC DOB building permits
8
Seer chat
Structural · Structural work to accommodate facade repair including framing and replacement of concrete balconies as per plans.
No product keyword matched
0
Apr 2, 2026
B891 Development LLC
NYC DOB building permits
8
Earth Work · Foundation work in conjunction with a NB
No product keyword matched
0Apr 2, 2026
BTHE AJD BUILDING
NYC DOB building permits
8
Sprinklers · modification of existing sprinkler systems. no change in use to egress or exits under this appliactaion.
No product keyword matched
0Apr 2, 2026
BSKYHIGH MURALS - COLOSSAL
NYC DOB building permits
8
Suspended Scaffold · Suspended Scaffold for Painting as Shown on Plans
No product keyword matched
0Apr 2, 2026
BDOWNTOWN FAMILY ADVISORS
NYC DOB building permits
8
General Construction · Main Roof Replacement, 7th Floor Terrace Roof Replacement, Mezzanine Roof Replacement, Localized Facade Cladding General Repairs
No product keyword matched
0Apr 2, 2026
BGUARD GENERAL MERCHANDISE CO. INC.
NYC DOB building permits
8
Structural · STRUCTURAL MODIFICATIONS & NEW ROOFTOP STEEL DUNNAGE AS PER THE DRAWINGS FILED HEREIN.
No product keyword matched
0Apr 2, 2026
BO'MALLEY INTERIORS INC
NYC DOB building permits
8
General Construction · HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 5N LOCATED ON THE FIFTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
No product keyword matched
0Apr 2, 2026
BIBK PARTNERS INC
NYC DOB building permits
8
Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH ALT-2 INTERIOR RENOVATION APPLICATION #B00788055-I1 IN EXISTING 3-FAMILY 3-STORY. RESIDENTIAL BUILDING WITH BASEMENT & CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
No product keyword matched
0Apr 2, 2026
BYES BROTHERS GROUP LLC
NYC DOB building permits
8
General Construction · EXTERIOR RENOVATION OF AN EXIST. COMMERCIAL BUILDING WITH REMOVING AND INSTALLING A NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BPETALUMA LLC
NYC DOB building permits
8
Foundation · Herewith filing underpinning work, as per plans submitted. Filed in conjunction with ALT 1#: 121330327 and SOE#: M00852650.
No product keyword matched
0Apr 2, 2026
BWALDRON STREET OWNER LLC
NYC DOB building permits
8
General Construction · Propose facade repairs. Scope of application to include: Brick, Sill, Lintel replacements, Mortar Repointing, and shelf angle replacement with waterproofing.
No product keyword matched
0Apr 2, 2026
BLADIES MILE LLC
NYC DOB building permits
8
Plumbing · Proposed to add (1) sink on each 3rd and 4th floors. No changes to use, occupancy, or use.
No product keyword matched
0Apr 2, 2026
BPrimorja Center LLC
NYC DOB building permits
8
General Construction · REPLACED EXTERIOR WALL EFFECTED BY CAR ACCIDENT
No product keyword matched
0Apr 2, 2026
BGAHC3 BRONX NY MOB LLC
NYC DOB building permits
8
Plumbing · Modification of an existing Verizon site. Replace natural gas service from basement gas meter to generator replacement on roof filed under DOB application no. X00802727-I1. All work in conformance with TPPN 5/98. No change in use, egress, or occupancy.
No product keyword matched
0Apr 2, 2026
BMMG
NYC DOB building permits
8
General Construction · INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE. NEW INTERIOR PARTITIONS, DOORS, FINISHES, AND STOREFRONT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BALEKS KALAJ
NYC DOB building permits
8
General Construction · New 6 Story Residential Building.
No product keyword matched
0Apr 2, 2026
B46-13 188 LLC
NYC DOB building permits
8
Plumbing · CAP AND REMOVE ILLEGAL SHOWER, GAS DRYER. INSTALL BACK 2PC BATHROOM. REMEDY ECB VIOLATIONS 39169157P;35677005L;35677006N;35665964Z;35665963R. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BSPL 889 LLC
NYC DOB building permits
8
General Construction · INTERIOR RENOVATION OF EXISTING 4-FAMILY DWELLING UNITS, ON CELLAR 1ST FL AND 2ND FL, NEW PARTITION WALL AS PER PLAN. PLUMBING WORK WILL BE FILED SEPARATE APPLICATION, NO CHANGE OF USE ,EGRESS OR OCCUPANCY
No product keyword matched
0Apr 2, 2026
BDEDE K CONTRACTING GRP LL
NYC DOB building permits
8
General Construction · GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BSPIREPLAST, CORP
NYC DOB building permits
8
General Construction · Renovate Apt 50/5 fl;, Work includes general construction, removal & construction of interior non-load bearing partitions & related finishes; total apt sf is 940, areas of work is 315 sf. Sub Doc filed for PL. No change to use, egress or occupancy.
No product keyword matched
0Apr 2, 2026
BEAGLE VISION CONSTRUCTION
NYC DOB building permits
8
General Construction · Fire damaged repairs &restoration to extg. Basement, 1st Floor& Attic Floor interiors in Existing 2 Story 1Family Dwelling due to building fire on 12-24-2025. Remove&replace all fire,smoke& water damaged interiors, Restore all gyp.bd.wall & floor finishes
No product keyword matched
0Apr 2, 2026
B331 Smith Street LLC
NYC DOB building permits
8
Structural · Filing herewith installation of new cornice above first floor, repair 1st floor framing, joists at cellar ceiling. No change in use, egress or occupancy under this application.
No product keyword matched
0Apr 2, 2026
BCOHEN EQUITIES
NYC DOB building permits
8
Mechanical Systems · Installation of a 5 ton, water cooled, Climatemaster A/C unit with a single line supply air duct layout, ceiling return air grilles, and condenser water supply & return piping and condensate drain on the first floor MRI Suite .
No product keyword matched
0Apr 2, 2026
BGOWANUS87 LLC
NYC DOB building permits
8
Mechanical Systems · REGISTER SPLIT HEAT PUMP SYSTEM.
No product keyword matched
0Apr 2, 2026
BNICHOLSON & GALLOWAY, INC
NYC DOB building permits
8
Structural · APPLICATION FILE FOR ROOFING REPLACEMENT AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED.
No product keyword matched
0Apr 2, 2026
B31 W 11 CONDOMINIUM
NYC DOB building permits
8
General Construction · INTERIOR RENOVATION OF EXISITING APARTMENT INCLUDING THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW WALL FINISHES, & KITCHEN CABINETS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE TO USE, OCCUPANCY OR EGRESSS UNDER THIS APPLICATION.
No product keyword matched
0Apr 2, 2026
BBEYERS HOME IMPROVEMENT I
NYC DOB building permits
8
Foundation · ALT CO APPLICATION PROPOSED HORIZONTAL & VERTICAL EXISTING TO EXISITNG (1-1/2) STORY RESIDENCE. INCREASE IN FLR AREA FROM 2203.61 SF TO 2457.76 SF. ADDITION OF FULL SECOND FLR & NEW ROOF.
No product keyword matched
0Apr 2, 2026
BSTL KINGS PROPERTY LLC
NYC DOB building permits
8
Solar · INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BEDI CONSTRUCTION INC
NYC DOB building permits
8
General Construction · INTERIOR RENOVATION AS PER PLANS: MINOR PARTITIONS. PLUMBING FILED AS SUBSEQUENT TO OT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BPHILIPS INTERNATIONAL AS AGENT
NYC DOB building permits
8
Suspended Scaffold · Installation of suspended scaffold during facade inspection/repair.
No product keyword matched
0Apr 2, 2026
BCOMFORT ZONE MECHANICAL
NYC DOB building permits
8
Mechanical Systems · Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched
0Apr 2, 2026
BLN NY SERVICING INC
NYC DOB building permits
8
General Construction · PROPOSED BEAUTY SALON AT FIRST FLOOR OF AN EXISTING MIXED USE BUILDING. A SEPARATE CERTIFICATE OF OCCUPANCY APPLICATION IS BEING FILED FOR THE CHANGE OF USE GROUP.
No product keyword matched
0Apr 2, 2026
BJPC CONTRACTING INC
NYC DOB building permits
8
General Construction · Minor general construction work on the 8th and 10th floors as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
No product keyword matched
0Apr 2, 2026
BAP MECHANICAL LLC
NYC DOB building permits
8
Mechanical Systems · 8904-MH Disconnecting 2 existing RTUs and replacing units for future tenant as per plan. No new gas piping all work done after Gas shutoff valve. No change in egress use group or occupancy group. Professional certification requested.
No product keyword matched
0Apr 2, 2026
BJIMMY GC CORP
NYC DOB building permits
8
General Construction · HEREBY FILING FOR THE RENOVATION OF 2 FAMILY DWELLING. FILING TO ADDRESS VIOLATIONS 39153884P, 39153886Z AND 39153883N. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Apr 2, 2026
BEMCON GROUP INC
NYC DOB building permits
8
General Construction · Tenant fit out interior renovation to accommodate new layout Installation of non-bearing partitions and interior doors, etc.
No product keyword matched
0Apr 2, 2026
BMIKOMA ELECTRIC LLC
NYC DOB electrical permits
8
General wiring for ac units in auditorium
No product keyword matched
0Apr 2, 2026
BYT ELECTRIAL SERVICES INC
NYC DOB electrical permits
8
Removal of Federal Pacific panel and 200 AMP Panel Upgrade. Installation of 16 additional dedicated lines
No product keyword matched
0Apr 2, 2026
BNUKIS COMPANY CORP
NYC DOB building permits
8
General Construction · INTERIOR RENOVATION AT APARTMENT #40B TO CONVERT 2 BEDROOM APARTMENT INTO A 3 BEDROOM APARTMENT IN RESPONSE TO VIOLATION 39153937J. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Apr 1, 2026
BFIFTH AVE PRESBYTERIAN CHURCH
NYC DOB building permits
8
Plumbing · Plumbing work as shown on plans
No product keyword matched
0Apr 1, 2026
BDECOR HOME REMODELING CON
NYC DOB building permits
8
General Construction · Lehalizing partitions in the Basement.
No product keyword matched
0Apr 1, 2026
BRED APPLE REALTY LLC
NYC DOB building permits
8
Structural · PROPOSED STRUCTURAL WORK FOR FIRST FLOOR TO ROOF FOR 1-FAMILY DWELLING.
No product keyword matched
0Apr 1, 2026
BREBUILDING RESTORATION CO
NYC DOB building permits
8
Suspended Scaffold · ROPE ACCESS INSTALLATION FOR REAR FACADE ACCESS AND INSPECTIONS
No product keyword matched
0Apr 1, 2026
BCOLOSSAL MEDIA
NYC DOB building permits
8
Sign · Filing for changeable copy hand-painted advertising wall sign painted on side of existing building
No product keyword matched
0Apr 1, 2026
BTHE KNICKERBOCKER CLUB
NYC DOB building permits
8
Plumbing · PLUMBING SCOPE ASSOCIATED WITH RENOVATION/ REPAIR OF EXISTING ELEVATOR SHAFT.
No product keyword matched
0Apr 1, 2026
B53 WEST 53RD STREET CONDOMINIUM
NYC DOB building permits
8
General Construction · INTERIOR RENOVATION OF APT. 55A WITH MINOR DEMOLITION. REMOVE & RELOCATE NON LOAD BEARING PARTITIONS & CEILINGS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE IS INVOLVED UNDER THIS APPLICATION.
No product keyword matched
0Apr 1, 2026
BLove of Design
NYC DOB building permits
8
Plumbing · Remove existing 3-compartment sink. No change to use, egress, or occupancy.
No product keyword matched
0Apr 1, 2026
BROCKALL CONSTRUCTION CORP
NYC DOB building permits
8
Construction Fence · erect temporary construction fence in conjunction with new building construction
No product keyword matched
0Apr 1, 2026
B1275 EAST 10TH STREET LLC
NYC DOB building permits
8
Plumbing · SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB - B01134622-I1.
No product keyword matched
0Apr 1, 2026
Showing 15,251–15,300 of 16,520
PreviousNext