Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MADISON HOME IMPROVEMENT NYC DOB building permits | 8 | General Construction · Combining apartments 8E and 8F on the 8th floor - create a doorway between the units, replace kitchen in smaller unit with washer/dryer No product keyword matched | 0 | Apr 6, 2026 |
| B | ESH MANAGEMENT LLC |
| 8 |
General Construction · ALT 2 APPLICATION HEREBY FILED FOR INTERIOR RENOVATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched |
| 0 |
| Apr 6, 2026 |
| B | GOGO GAO 58 RD LLC NYC DOB building permits | 8 | Sprinklers · FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#Q00964899 No product keyword matched | 0 | Apr 6, 2026 |
| B | MIDDLETON'S EARLY LEARNING CENTER NYC DOB building permits | 8 | Mechanical Systems · INSTALL SPLIT HVAC SYSTEM. No product keyword matched | 0 | Apr 6, 2026 |
| B | SIMLEKA REALTY LLC NYC DOB building permits | 8 | Plumbing · INTERIOR PLUMBING WORK. REMOVAL OF ALL GAS METERS SERVICING 26 APTS AND PIPING , THE SYSTEM WILL BE TRANSFORMED FROM EACH EXISTING APT GAS METERS TO INDIVIDUAL METER LOCATED IN THE BASEMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 6, 2026 |
| B | The Lorge School NYC DOB building permits | 8 | Solar · SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS No product keyword matched | 0 | Apr 6, 2026 |
| B | FALCON PACIFIC CONSTRUCT* NYC DOB building permits | 8 | General Construction · Removal of existing ceiling finishes only. No change in use, egress or occupancy. No product keyword matched | 0 | Apr 6, 2026 |
| B | DYNAMIC INSTALLATION CORP NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 6, 2026 |
| B | KWONG FAI TRAVEL AGENCY NYC DOB building permits | 8 | Antenna · Modification to Verizon site. Remove 2 antennas, replace 2 antennas, install 7 antennas, remove 4 RRH units, relocate 2 GPS antennas and install 2 GPS antennas, remove cabinet, install new platform with related dunnage. No product keyword matched | 0 | Apr 6, 2026 |
| B | AUTO-TECH ELECTRIC CORP NYC DOB electrical permits | 8 | Wiring for entire house. No product keyword matched | 0 | Apr 6, 2026 |
| B | BLUE LINE ELECT CONT CORP NYC DOB electrical permits | 8 | supercede A311911 No product keyword matched | 0 | Apr 4, 2026 |
| B | AYAT INC NYC DOB building permits | 8 | General Construction · Interior renovation in existing commercial space U.G. 6 on partial first floor. Replace store front as per plan. No change in use, egress, occupancy, lot coverage, bulk or metes and bounds. No product keyword matched | 0 | Apr 3, 2026 |
| B | NU-WAY HEATING & COOLING NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF HVAC AND VENTILATION EQUIPMENT AS PER THE PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 3, 2026 |
| B | HOME BUILDERS 1 L.P NYC DOB building permits | 8 | Solar · Installation of roof mounted pv solar energy system. No change of use, egress, or occupancy. No product keyword matched | 0 | Apr 3, 2026 |
| B | LONGIN CERKEVICH NYC DOB building permits | 8 | Plumbing · ALT APPLICATION FOR A TWO (2) STORY ADDITION TO REAR OF AN EXISTINGTWO-STORY ONE FAMILY DETACHED RESIDENCE.SECOND FL: REPLACE (3) EXISTING FIXTURES/INSTALL (1) NEW STALL SHOWERFIRST FL: INSTALL (4) NEW FIXTURES (STALL SHOWER, LAV, WATER CLOSET,TUB) No product keyword matched | 0 | Apr 3, 2026 |
| B | EAST END BUILDERS AND AS NYC DOB building permits | 8 | Mechanical Systems · Perform selective removal work, provide new HVAC equip & assoc ductwork, piping, controls, accessories, etc. Protect & reuse existing equipment as shown on plans. Application filed in conjunction with M01276888-I1 (GC) & M01276888-S2 (PL). No product keyword matched | 0 | Apr 3, 2026 |
| B | 544 WARRICK STREET LLC NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF 50 PSF MEDIUM PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 3, 2026 |
| B | J HOYLER CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · Alterations to existing apartment No product keyword matched | 0 | Apr 3, 2026 |
| B | GLENWOOD NYC DOB building permits | 8 | General Construction · Structural alterations including new footings to the cellar, 1st floor, and roof, as required for installation of a MRI machine related to architectural application filed under application M0048276. No product keyword matched | 0 | Apr 3, 2026 |
| B | V'S PRIME MECHANICAL, LLC NYC DOB building permits | 8 | Sprinklers · Filing herewith drawings indicating the replacement of a Sprinkler Fire Department Siamese connection. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Apr 3, 2026 |
| B | PAWEL F URDOMINSKI NYC DOB building permits | 8 | General Construction · INTERIOR NON-STRUCTURAL DEMOLITION AND GENERAL CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH AT UNIT 6A. SCOPE OF WORK INCLUDES INTERIOR PARTITION, MILLWORK INSTALLATION, LIGHTING REPLACEMENT, AND REFINISHING; NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 3, 2026 |
| B | FRESH MEADOWS HOME NYC DOB building permits | 8 | Foundation · 2 STORY REAR ADDITION TO EXISTING ONE FAMILY DWELLING, CELLAR, FIRST AND SECOND FLOOR ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Apr 3, 2026 |
| B | THE DERMOT COMPANY NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 0 | Apr 3, 2026 |
| B | YMCA OF GREATER NEW YORK NYC DOB building permits | 8 | Mechanical Systems · MH MODIFICATIONS ON CEL FLR INCLUDING REDISTRIBUTING SUPPLY, EXHAUST TO NEW DIFFUSERS TO ADJUSTED FAMILY LOCKER ROOM &INSTALLING 6 THREADED SCHEDULE 40 STEEL PIPE FROM THE CEL METER ROOM TO BUILDING FAC ON ML. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | 1133 FIFTH AVENUE CORPORATION NYC DOB building permits | 8 | Mechanical Systems · NSTALLATION OF FOUR AC UNITS No product keyword matched | 0 | Apr 3, 2026 |
| B | DI FIORE & SONS CUSTOM WO NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APARTMENT 2G/H AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | A EAGLE CONSTRUCTION CORP NYC DOB building permits | 8 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORKS AT 67-30 CLYDE STREETQUEENS, NY 11375 No product keyword matched | 0 | Apr 3, 2026 |
| B | 4012 MAIN STREET LLC NYC DOB building permits | 8 | Mechanical Systems · INSTALL HVAC SYSTEMS FOR EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | 534 WEST 42ND STREET CONDOMINIUM NYC DOB building permits | 8 | General Construction · Facade repairs to include masonry replacement, repointing and crack repairs, concrete crack and patch repair. No change in use, egress or occupancy. No product keyword matched | 0 | Apr 3, 2026 |
| B | RENRUT PROPERTIES NYC DOB building permits | 8 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH JOB # 340773407. PLUMBING WORK LIMITED TO CELLAR AND 1ST FLOOR No product keyword matched | 0 | Apr 3, 2026 |
| B | OZ AIR CONDITIONING, INC NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF HVAC SYSTEM ON FLOOR 002 AND ROOF WITH A TOTAL CAPACITY OF 7 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | MAGIC ROCK CONSTRUCTION I NYC DOB building permits | 8 | General Construction · Application herewith filed to remove deck @ rear of building and install stairs and landing to cure violation #2073786. no change in occupancy, use, egress or bulk. work performed after 1987. no original building material to disturbed. No product keyword matched | 0 | Apr 3, 2026 |
| B | Choice NY NYC DOB building permits | 8 | Mechanical Systems · INSTALL NEW CHIMNEY LINER. NO CHANGE TO USE, OCCUPANCY OR EGRESS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Apr 3, 2026 |
| B | TEA TWO TEA INC. NYC DOB building permits | 8 | Plumbing · MINOR PLUMBING WORK RELATED TO DOB JOB# M01373733. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | NY PRO DESIGN CORP NYC DOB building permits | 8 | General Construction · In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy. No product keyword matched | 0 | Apr 3, 2026 |
| B | 356 West 21 LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APT 2, 3, AND 4. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Apr 3, 2026 |
| B | GRAYSON HOTEL NYC DOB building permits | 8 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Apr 3, 2026 |
| B | VECTOR MEDIA HOLDING CORP. NYC DOB building permits | 8 | General Construction · Propose to refurbish sign structure. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 3, 2026 |
| B | SKS CONTRACTING INC NYC DOB building permits | 8 | General Construction · APPLICATION FILED HEREWITH TO ERECT PARTITIONS FOR 3 PIECE BATH AND INSTALL CELLAR ENTRY AT SIDE OF RESIDENCE. PLUMBING WORK FILED UNDER SEPARATE APPLICATION. No product keyword matched | 0 | Apr 3, 2026 |
| B | JVM ARCHITECT NYC DOB building permits | 8 | Foundation · NEW TWO FAMILY RESIDENCE No product keyword matched | 0 | Apr 3, 2026 |
| B | TRI HILL NYC DOB building permits | 8 | General Construction · FISP REPAIRS TO INCLUDE BROWNSTONE REPLACEMENT, BRICK REPLACEMENT, BRICK REPOINTING, WINDOW LIMIT STOP REPLACEMENT, SILL REPAIR, LINTEL RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | krave delicatessen & supermarket pl NYC DOB building permits | 8 | General Construction · FILE CONSTRUCTION WORK AT PROPOSED DELI STORE TO INSTALL NEW PARTITIONS AND INTERIOR FINISHES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | P&L MANAGEMENT NYC DOB building permits | 8 | General Construction · FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 3, 2026 |
| B | STRONG Pilates NYC DOB building permits | 8 | Structural · NEW STRUCTURAL FRAMING INSIDE AN EXISTING STRUCTURE FOR THE ACOUSTICALLY ISOLATED FITNESS STUDIO SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Apr 3, 2026 |
| B | ROYAL RANCH DEVELOPERS LLC NYC DOB building permits | 8 | General Construction · Interior renovation/ modification of existing tenant space (use group 6) on first floor to include removal of waiting area walls, relocate pantry and laundry to new room. Painting and new flooring. No change to use egress or occupancy. No product keyword matched | 0 | Apr 2, 2026 |
| B | EB PROPERTY MANAGEMENT LLC NYC DOB building permits | 8 | Sprinklers · EXISTING SPRINKLER SYSTEM TO BE MODIFIED WITH REMOVAL OF EXISTING SPRINKLER HEADS AND ADDITION OF NEW SPRINKLER HEADS WITH RELATED PIPING WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 2, 2026 |
| B | ARTWORKS CONSTRUCTION LLC NYC DOB building permits | 8 | Mechanical Systems · Mechanical work as shown on plans for Apt 5A as well as mechanical closet. No product keyword matched | 0 | Apr 2, 2026 |
| B | CROSSTOWN MANAGEMENT CORP. NYC DOB building permits | 8 | General Construction · Masonry Repair and Roof Repair. No change of use, egress, or occupancy under this application. No product keyword matched | 0 | Apr 2, 2026 |
| B | RICKY & SONS CONSTRUCTION NYC DOB building permits | 8 | Plumbing · HEREWITH FILING FOR PLUMBING MODIFICATIONS AS PER PLANS. No product keyword matched | 0 | Apr 2, 2026 |
| B | LOMOND LLC NYC DOB building permits | 8 | Foundation · Underpinning in conjunction with M01041803. No product keyword matched | 0 | Apr 2, 2026 |