Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ICON CONTRACTING GROUP NYC DOB building permits | 8 | General Construction · PROPOSED OF GRINDING AND POINTING, BRICK REPLACEMENT AND PARAPET WALL AS NEEDED AS PER PLANS. THERE IS NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 8, 2026 |
| B | Savino Capital LLC / LeTish Coffee |
| 8 |
Mechanical Systems · renovation of existing coffee shop to make bathroom accisble and change bar layout No product keyword matched |
| 0 |
| Apr 8, 2026 |
| B | 228 W 17TH ST HDFC NYC DOB building permits | 8 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Apr 8, 2026 |
| B | New Museum of Contemporary Art NYC DOB building permits | 8 | Structural · Fabrication of the 4th floor armature and 3rd floor support per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 0 | Apr 8, 2026 |
| B | 1711 Fulton Redevelopment Company NYC DOB building permits | 8 | Suspended Scaffold · INSTALL BETA-MAX HOIST AND RGC HOIST HS2000 TO LIFT MATERIAL FOR EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. No product keyword matched | 0 | Apr 8, 2026 |
| B | Amiee Lynn, Inc. NYC DOB building permits | 8 | Mechanical Systems · MODIFICATIONS TO EXISTING HVAC SYSTEM TO MATCH NEW TENANT FIR OUT No product keyword matched | 0 | Apr 8, 2026 |
| B | kuo sheng llc NYC DOB building permits | 8 | Plumbing · PLUMBING WORK FOR EXISTING 2 FAMILY, 2 STORY W/ CELLAR RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | YD E29 REALTY LLC NYC DOB building permits | 8 | Plumbing · PLUMBING WORK OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166514K. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | 28 NOMAD INC NYC DOB building permits | 8 | Plumbing · INSTALL NEW KITCHEN EQUIPMENTS AND PLUMBING FIXTURES ON THE EXISTING KITCHEN AT CELLAR. No product keyword matched | 0 | Apr 8, 2026 |
| B | RAF GENERAL CONTRACTING C NYC DOB building permits | 8 | Mechanical Systems · Proposed 3-story (BC) 2-story (ZR) one family semi-detached residence with cellar (ZR) on one tax lot comprised of one zoning lot. No product keyword matched | 0 | Apr 8, 2026 |
| B | INLINE REALTY NYC DOB building permits | 8 | General Construction · REPLACE EXISTING STOREFRONT WITH NEW, INTERIOR ALTERATION ON THE FIRST FLOOR RETAIL SPACE. No product keyword matched | 0 | Apr 8, 2026 |
| B | A-LINE CONSTRUCTION CORP NYC DOB building permits | 8 | General Construction · Renovation to existing apartment at cellar level. Replace windows and door. Partition, finish, fixture work. Replace HVAC system. No change to use, egress or occupancy. No product keyword matched | 0 | Apr 8, 2026 |
| B | SKYWAY RESTORATION SERVICES INC NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION. No product keyword matched | 0 | Apr 8, 2026 |
| B | YND CONSTRUCTION INC NYC DOB building permits | 8 | Construction Fence · INSTALL 8' HTS. TEMPORARY CONSTRUCTION FENCE No product keyword matched | 0 | Apr 8, 2026 |
| B | Luigi's Pizza NYC DOB building permits | 8 | General Construction · 2 COMMERCIAL SPACES ON THE FIRST FLOOR ARE TO BE JOINED BY A HALLWAY. RESIDENTIAL PORTION OF INGRESS AND EGRESS IS TO BE INDEPENDENT. INSTALL PARTITONS IN THE NEW KITCHEN AND ADD 2 NEW TOILET ROOMS. No product keyword matched | 0 | Apr 8, 2026 |
| B | 105 REALTY CORP NYC DOB building permits | 8 | Mechanical Systems · OBTAIN CERT. OF COMPLIANCE FOR EXISTING ROOFTOP HVAC UNIT(S) FOR APT 5AB, AS PER PLANS AND SPECS FILED HEREWITH, IN ACCORDANCE WITH APPROVED -LPC PERMIT CNE LPC-26-07406 DATED 03-05-2026. SEE COMMENTS FOR ADDITIONAL INFORMATION No product keyword matched | 0 | Apr 8, 2026 |
| B | SEVENS BUILDING MANAGEMEN NYC DOB building permits | 8 | General Construction · install non bearing partitions to create storage room, enclose boiler and hot water heater room and create bathroom with w.c. and lav only. no change in use, egress or occupancy. plumbing to be filed under subsequent application. No product keyword matched | 0 | Apr 8, 2026 |
| B | Bitcoin New York Steakhouse NYC DOB building permits | 8 | General Construction · REMOVAL OF NON-BEARING TENANT DEMISING WALL TO COMBINE TWO (2) EXISTING EATING AND DRINKING ESTABLISHMENTS AS PER PLANS FILED HEREWITH. USE AND OCCUPANCY FILED UNDER BIS ALTERATION 121772616. PLACE OF ASSEMBLY TO BE FILED UNDER SUBSEQUENT APPLICATION. No product keyword matched | 0 | Apr 8, 2026 |
| B | Alpha Generation NYC DOB building permits | 8 | General Construction · REMOVAL OF EXISTING CONCRETE SLABS No product keyword matched | 0 | Apr 8, 2026 |
| B | 1061 MORRIS AVE LLC NYC DOB building permits | 8 | General Construction · PROPOSED MINOR DUPLEX EXTENSION ON EXISTING 2 STORY & BASEMENT 3 APARTMENTS BUILDING, ADDING A MINOR DUPLEX TO 2ND FLOOR APARTMENT, BUILDING WILL STAY AS A 3 FAMILY, PROPOSED NEW CERTIFICATE OF OCCUPANCY FOR NEW ADDITION DUPLEX, No product keyword matched | 0 | Apr 8, 2026 |
| B | 42 Monroe Place LLC NYC DOB building permits | 8 | Boiler Equipment · REMOVE EXISTING FUEL OIL STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | 37TH STREET PARTNERS CAFE LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF COMMERCIAL SPACE. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Apr 8, 2026 |
| B | INTECH CONSTRUCTION INC. NYC DOB building permits | 8 | General Construction · APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLANS LIFTING OF NYC DOB ISSUED ECB VIOLATION NUMBER 35683161Y. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 8, 2026 |
| B | The 475 Washington Avenue NYC DOB building permits | 8 | General Construction · PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | 413 GREENWICH STREET CORP NYC DOB building permits | 8 | Mechanical Systems · Mechanical work for Olives restaurant including commercial kitchen rangehood ventilation system and replacement of rooftop termination below the parapet. No change of use, occupancy or egress. No product keyword matched | 0 | Apr 8, 2026 |
| B | JDAB HOLDINGS LTD. NYC DOB building permits | 8 | General Construction · EXTERIOR FACADE REPAIR WORK INCLUDING NEW BRICK INSTALLATION, WINDOW REPLACEMENT, AND ASSOCIATED STRUCTURAL WORK AS INDICATED ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | Hasina Inc NYC DOB building permits | 8 | General Construction · Existing Porch at the first floor and Terrace at the second to Be Legalized No product keyword matched | 0 | Apr 8, 2026 |
| B | 179 East Houston Holdings LLC NYC DOB building permits | 8 | General Construction · FACADE REPAIRS No product keyword matched | 0 | Apr 8, 2026 |
| B | SCHUMAN PROPERTIES NYC DOB building permits | 8 | Plumbing · FILING TO CAP & REMOVE 1 TANK HWH AND REPLACE 1 TANK HWH WITH NEW 1 HWH AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 8, 2026 |
| B | DEVO FIRE PROTECTION INC NYC DOB building permits | 8 | Sprinklers · Sprinkler infrastructure as per plans submitted. No product keyword matched | 0 | Apr 8, 2026 |
| B | 5911 54th Street, LLC NYC DOB building permits | 8 | Construction Fence · ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY AT FRONT. IN CONJUNCTION WITH NB APPLICATION Q01138633. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY No product keyword matched | 0 | Apr 8, 2026 |
| B | BLOCPOWER NYC DOB building permits | 8 | Plumbing · MODIFICATIONS TO THE EXISTING BUILDING PLUMBING SYSTEM TO ELECTRIFY HOT WATER GENERATOR. NO CHANGE IN USE OR EGRESS. No product keyword matched | 0 | Apr 8, 2026 |
| B | MAYNE CONSTRUCTION OF LO NYC DOB building permits | 8 | General Construction · HEREBY FILING GENERAL CONSTRUCTION WORK AT EXISTING COMMERCIAL SPACE (CEL,001,002). WORK FILED TO REPAIR FIRE DAMAGE AT INTERIOR AND EXTERIOR. PLUMBING WORK FILED SEPARATELY. No product keyword matched | 0 | Apr 8, 2026 |
| B | LIVE WIRE ELECTRICAL, INC NYC DOB electrical permits | 8 | Temporary Water Heater Wiring No product keyword matched | 0 | Apr 8, 2026 |
| B | GRID ELECL MAINTNCE LLC NYC DOB electrical permits | 8 | APT 3H & 3J - RELOCATE 100A PANEL, SWITCHES RECESSED LIGHTS, RECEPTACLES, KITCHEN No product keyword matched | 0 | Apr 8, 2026 |
| B | TEXPORT FABRICS MANAGEMENT LLC NYC DOB building permits | 8 | Mechanical Systems · Filing for mechanical work for modification of mechanical ductwork and installation of AC units for the 3rd floor and roof at the referenced address. No change in use, egress, or occupancy No product keyword matched | 0 | Apr 7, 2026 |
| B | MARK M. PEPE NYC DOB building permits | 8 | General Construction · application filed for facade & roof repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application No product keyword matched | 0 | Apr 7, 2026 |
| B | G. & S. PLUMBING & HTG CO NYC DOB building permits | 8 | Plumbing · Interior plumbing work: replace bathroom fixtures/finishes at 1st & 2nd floors; add new full bath in basement; modify kitchen island & sink; replace DHW heater with tankless WH-1; relocate gas dryer in basement, new wet bar in basement. No product keyword matched | 0 | Apr 7, 2026 |
| B | The Nevada Condominium NYC DOB building permits | 8 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION TO EX. APT 1N ON THE FIRST FLOOR. INSTALL PLUMBING FIXTURES & RELATED PLUMBING PIPING. No product keyword matched | 0 | Apr 7, 2026 |
| B | BETTER BUILDERS CONCEPTS NYC DOB building permits | 8 | General Construction · Combination of apartments without affecting the Certificate of Occupancy as per TPPN 3/1997. Penthouse F and Penthouse G combined into one apartment PHFG. All work completed under job #110478199. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 7, 2026 |
| B | VINTAGE HOMES INC NYC DOB building permits | 8 | General Construction · Renovation of a single-family dwelling renovation. Work includes non-structural demolition and general construction as per plans file herewith. No product keyword matched | 0 | Apr 7, 2026 |
| B | BROOKLYN CONSTRUCTION GR* NYC DOB building permits | 8 | General Construction · FACADE REPAIR OF AN EXISTING BUILDING IN RESPONSE TO VIOLATION V021126CPI40401SB. No product keyword matched | 0 | Apr 7, 2026 |
| B | VENEZIA INTERIORS CORP NYC DOB building permits | 8 | Structural · New stair floor opening to connect PHN to apartment 5A. Work involves installation of new header and trimmer. No product keyword matched | 0 | Apr 7, 2026 |
| B | STEVEN DUBNER LANDSCAPING NYC DOB building permits | 8 | Construction Fence · Herewith filing temporary construction fence No product keyword matched | 0 | Apr 7, 2026 |
| B | SOL DEVELOPMENT & CONSTRU NYC DOB building permits | 8 | General Construction · Four (4) Story new building No product keyword matched | 0 | Apr 7, 2026 |
| B | BONALINE CONSTRUCTION CO NYC DOB building permits | 8 | General Construction · DEMOLITION OF NON-LOAD BEARING PARITIONS, INTALLATION OF NEW PARTITIONS, DOORS AND FINISHES ON THE FIRST (1ST) FLOOR, APT. 1DS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 7, 2026 |
| B | METRO RF SERVICES INC NYC DOB building permits | 8 | Antenna · Carrier: T-Mobile. Modification of an existing antenna site. Reinforce (1) existing antenna sector with kickbacks. In conformance with TPPN #5/98. No change in use, egress,, or occupancy. No product keyword matched | 0 | Apr 7, 2026 |
| B | KRISHNA HOSPITALITY, LLC NYC DOB building permits | 8 | Earth Work · Excavation-SOE and foundation work No product keyword matched | 0 | Apr 7, 2026 |
| B | TL Blink LLC NYC DOB building permits | 8 | Plumbing · Plumbing work at 4th floor indicated on drawings filed herewith. No change in use egress or occupancy under this application No product keyword matched | 0 | Apr 7, 2026 |
| B | Northwell NYC DOB building permits | 8 | General Construction · MINOR INTERIOR WORK TO INCLUDE NEW INTERIOR FINISHES. NO EXTERIOR WORK, NO CHANGE IN EGRESS OR USE. No product keyword matched | 0 | Apr 7, 2026 |