Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SHERRI BUILDERS INC NYC DOB building permits | 8 | General Construction · HEREBY FILING FOR THE RENOVATION OF UNIT #5A. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | ALAYNE REAL ESTATE NYC DOB building permits |
| 8 |
General Construction · INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched |
| 0 |
| Apr 9, 2026 |
| B | SCF MANAGEMENT LLC NYC DOB building permits | 8 | General Construction · GENERAL CONSTRUCTION ON THE CELLAR, 1ST TO 4TH FLOOR AND ROOF AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | PD CONSTRUCTION GROUP INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION FOR TENANT FITOUT IN MIXED USE BUILDING - IN AN EXISTING EATING & DRINKING ESTABLISMENT (UNDER 75 PERSONS) No product keyword matched | 0 | Apr 9, 2026 |
| B | SCHIMENTI CONSTRUCTION CO NYC DOB building permits | 8 | General Construction · General construction as shown on plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 9, 2026 |
| B | ELAD US HOLDING INC. NYC DOB building permits | 8 | General Construction · Filing Plans for, sequence, means and method for the proposed partial demolition of existing 5 story buildings, in conjunction with Alt I # 121188320 No product keyword matched | 0 | Apr 9, 2026 |
| B | FST. METROPOLITAN CON.INC NYC DOB building permits | 8 | General Construction · HEREWITH FILING A NEW BUILDING APPLICATION IN ORDER TO CONSTRUCT PROPOSED 3 STORY 2 (TWO) DWELLING UNIT RESIDENTIAL BUILDING WITH PARKING AT GROUND FLOOR OSP FOR TWO SPOTS, AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | TESTBUSINESS2 NYC DOB building permits | 8 | General Construction · DD No product keyword matched | 0 | Apr 9, 2026 |
| B | SKYVIEW DEVELOPERS NYC DOB building permits | 8 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 9, 2026 |
| B | NATIONAL MAINTENANCE INC NYC DOB building permits | 8 | General Construction · ERECT STEEL POLE ON EXISTING CONCRETE FOOTING FOR GROUND SIGN No product keyword matched | 0 | Apr 9, 2026 |
| B | A&A BLDG CONSULTANT.INC NYC DOB building permits | 8 | Structural · STRUCTURAL APPLICATION FOR THE FRAMING OF VERTICAL EXTENSION. No product keyword matched | 0 | Apr 9, 2026 |
| B | TIM & TIFF LLC NYC DOB building permits | 8 | Full Demolition · FULLY DEMOLITION OF EXISTING ONE STORY GARAGE No product keyword matched | 0 | Apr 9, 2026 |
| B | SONU CONSTRUCTION CORP NYC DOB building permits | 8 | Construction Fence · INSTALLATION OF TEMPORARY FENCE No product keyword matched | 0 | Apr 9, 2026 |
| B | M.D. CARLISLE CONSTRUCTION CORP NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 0 | Apr 9, 2026 |
| B | Walfood II, Incorporated NYC DOB building permits | 8 | Sign · ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | CITUSA PARK AVENUE LLC NYC DOB building permits | 8 | General Construction · FLOOR 1 : INTERIOR RENOVATION OF EXISTING LOBBY. CELLAR: INTERIOR RENOVATION OF FITNESS, CORRIDOR & BATHROOMS. CHANGE IN USE. NO EGRESS OR OCCUPANCY CHANGE. No product keyword matched | 0 | Apr 9, 2026 |
| B | TOPO NYC DOB building permits | 8 | Mechanical Systems · MINOR PARTITION MODIFICATION IN CELLAR, REPLACE HVAC UNITS ON FIRST FLOOR AND ADD HOOD OVER NEW ELECTRIC PIZZA OVENS.; NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 9, 2026 |
| B | ACE ENGINEERING NYC DOB building permits | 8 | General Construction · THIS APPLICATION IS FILED IN CONJUNCTION WITH PLUMBING APPLICATION B00967309-I1 , TO REPLACE DRYWALL AT SRO 3R, RENEW DOOR & DAMAGED CEILING AT SRO 3F ,RENEW THE DAMAGED STAIRCASE . AND ADDRESS VIOLATION # 39027010R, NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 9, 2026 |
| B | El Museo del Barrio NYC DOB building permits | 8 | General Construction · MINOR ALTERATION OF NON-LOAD BEARING PARTITIONS TO CONFORM WITH LAYOUTS ON FILE WITH THE DEPARTMENT OF BUILDINGS. IT ALSO INCLUDES THE MOUNTING OF NEW TV'S TO EXISTING ELECTRICAL WIRING. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 9, 2026 |
| B | LASCON INC NYC DOB building permits | 8 | General Construction · INSTALL LIMESTONE PANEL ON EAST FACADE BETWEEN THIRD AND FOURTH FLOORS AT TO ADDRESS ECB VIOLATION #35718186H. AREA OF WORK IS OUTSIDE THE PUBLIC RIGHT-OF-WAY. NO CHANGE IN EGRESS, OCCUPANCY OR USE. No product keyword matched | 0 | Apr 9, 2026 |
| B | 290 8TH AVENUE REALTY CORP NYC DOB building permits | 8 | Antenna · T-Mobile - Relocation of existing antennas and sector, removal of microwave dish (NY01083B) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egress or occupancy No product keyword matched | 0 | Apr 9, 2026 |
| B | PROFESSIONAL SERVICES NYC DOB building permits | 8 | General Construction · EXISTING 3-STORY FRAME BUILDING WITH CELLAR, CONVERSION OF FIVE-FAMILY DWELLING TO ORIGINAL THREE-FAMILY DWELLING. NO CHANGE IN BULK, NO CHANGE IN EGRESS. No product keyword matched | 0 | Apr 9, 2026 |
| B | GK WEST 47TH LLC NYC DOB building permits | 8 | Mechanical Systems · HEREWITH FILING FOR NEW EMERGENCY GENERATOR. APPLICATION FILED IN CONJUNCTION WITH ALT 1 #122106318 No product keyword matched | 0 | Apr 9, 2026 |
| B | MEYERS UNIFORMS CORP. NYC DOB building permits | 8 | General Construction · General Construction and Structural work to repair and replace damaged roof joists, Front facade & repair existing roof at existing garage @ 1st floor to rectify ECB Violation #39158828N No change in use, egress or Occupancy under this application No product keyword matched | 0 | Apr 9, 2026 |
| B | AGEE HEATING SERVICE CORP NYC DOB building permits | 8 | Plumbing · Plumbing work associated with interior renovation of exist. 4 sty./4 family bldg. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 9, 2026 |
| B | NAAD REALTY NYC DOB building permits | 8 | General Construction · SCOPE OF WORK INCLUDES EXISTING KITCHEN CABINET REMOVAL; NEW PARTITIONS, DOORS, HEADERS, STAIR & RAILING ADDITION. NO CHANGE TO FLOOR AREA,, BLDG OCC, USE, ZONING BULK OR EGRESS. No product keyword matched | 0 | Apr 9, 2026 |
| B | AKS INTERNATIONAL INC NYC DOB building permits | 8 | Mechanical Systems · Bldg#1- Mechanical work for Jacobi Medical Center correspondent to Fire Alarm Upgrade. All as per plans filed herewith. No product keyword matched | 0 | Apr 9, 2026 |
| B | VTEC LABORATORIES NYC DOB building permits | 8 | Plumbing · Remove gas booster from gas line. No product keyword matched | 0 | Apr 9, 2026 |
| B | HAMILTON-MADISON HOUSE, INC. NYC DOB building permits | 8 | General Construction · FILING HEREWITH RENOVATION OF EXISTING OFFICES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | JOSEPH & VITO PANOBIANCO NYC DOB building permits | 8 | General Construction · EXTERIOR FACADE REPAIR WORK INCLUDING NEW BRICK INSTALLATION, WINDOW REPLACEMENT, AND ASSOCIATED STRUCTURAL WORK AS INDICATED ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | CARLYLE CONSTRUCTION CO NYC DOB building permits | 8 | General Construction · Renovation of street level commercial space located in existing 2 story commercial building. Removal of non-bearing partitions, GWB Ceiling, fixtures and finishes. New partitions, doors, glazing finishes and fixtures. No product keyword matched | 0 | Apr 9, 2026 |
| B | THE SUMMIT NYC DOB building permits | 8 | General Construction · Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy. No product keyword matched | 0 | Apr 9, 2026 |
| B | Mimie's Cuisine NYC DOB building permits | 8 | Plumbing · INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION M01349266-I1-NO CHANGE IN USE/OCCUPANCY, EGRESS, ROOM COUNT/DWELLING UNITS No product keyword matched | 0 | Apr 9, 2026 |
| B | LEMON TEA USA INC NYC DOB building permits | 8 | Mechanical Systems · Propose mechanical work, installation of kitchen exhaust hood at existing commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 9, 2026 |
| B | SPECIALTY CONSTRUCTION SY NYC DOB building permits | 8 | General Construction · herewith filing for general construction modifications to the roof B Midwood - Mount Sinai. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 9, 2026 |
| B | UPGRADE CONTRACTING CO., INC. NYC DOB building permits | 8 | Protection and Mechanical Methods · TEMPORARY STORAGE OF EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. SIDEWALK SHED FILED SEPARATELY. STORAGE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE.NO CHANGE IN USE,OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 9, 2026 |
| B | Forest Eden LLC NYC DOB building permits | 8 | Mechanical Systems · INTERIOR RENOVATION AND MECHANICAL HOOD OF FOR COMMERCIAL KITCHEN AT BASEMENT FLOOR #C4, AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | J. MITACEK CONTRACTING C* NYC DOB building permits | 8 | General Construction · Interior partition modifications, minimal door & window modifications, exterior porch for wheelchair lifts and finishes to facilitate greater degree of accessibility for resident No product keyword matched | 0 | Apr 9, 2026 |
| B | META ELECTRIC INC NYC DOB electrical permits | 8 | APT 1E+1W GENERAL WIRING AND METER UPGRADE No product keyword matched | 0 | Apr 9, 2026 |
| B | PRINCE ST HOTPOT NYC DOB building permits | 8 | General Construction · MINOR INTERIOR RENOVATION OF EXISTING RESTAURANT ON 1ST FL AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | DOB SERVICES INC NYC DOB building permits | 8 | Sign · PROPOSE NEW ILLUMINATED STAINLESS STEEL BACKLIT SIGN FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | GK GROUP CONSTRUCTION COR NYC DOB building permits | 8 | General Construction · APPLICATION FILED HEREWITTH TO OBTAIN PERMIT IN ORDER TO RESOLVE ECB VIOLATION# 39141040R FOR CUT-OUT LOCATED AT SIDE OF REAR GARAGE TO INSTALL NEW GLASS SLIDING DOOR AT SIDE OF GARAGE AS SHOWN ON PHOTOS #1 & 2.NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 8, 2026 |
| B | RIBO PROPERTY LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION WITH PARTITION WORK ON THE CELLAR THROUGH 3RD FLOOR AT AN EXISTING LIGHT MANUFACTURING BUILDING. FACADE WORK AS PER LPC APPROVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 8, 2026 |
| B | STRUCTURETECH NEW YORK INC NYC DOB building permits | 8 | Protection and Mechanical Methods · Loading platform as per plans filed herewith. No product keyword matched | 0 | Apr 8, 2026 |
| B | PRIME GROUP HOLDINGS, LLC NYC DOB building permits | 8 | General Construction · Facade Repairs and cladding installation. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 8, 2026 |
| B | SCG AMERICA CONST. INC NYC DOB building permits | 8 | General Construction · GENERAL CONSTRUCTION WORK FOR SELECTIVE FOOD VENDORS IN AN EXISTING FOOD COURT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 8, 2026 |
| B | Hudson 1701-1706 LLC NYC DOB building permits | 8 | General Construction · REPAIR OF EXISTING FIRE RATED WALLS IN COMMON HALLWAYS No product keyword matched | 0 | Apr 8, 2026 |
| B | AIR COOLING & HEATING INC NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF (1) AIR CONDITIONER UNIT, (2) ERV AND MINOR MECHANCIAL WORK AS PER PLAN No product keyword matched | 0 | Apr 8, 2026 |
| B | JLS GROUP CONSTRUCTION LLC NYC DOB building permits | 8 | Protection and Mechanical Methods · INSTALLATION OF SPYDER CRANE IN CONJUCTION WITH DOB NOW Q01045957 No product keyword matched | 0 | Apr 8, 2026 |
| B | BRIGHT PAINTING & INTERIO NYC DOB building permits | 8 | General Construction · Interior renovation of existing apartment on the 18th floor Apt#18J. Architectural/construction work only. No product keyword matched | 0 | Apr 8, 2026 |