Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | URBAN MECHANICAL CORP NYC DOB building permits | 8 | Plumbing · PROP. PLUMBING WORK ASSOCIATED WITH RENOVATION OF PRIMARY BATHROOM AT FIRST FLOOR OF EXIST. TWO STORY PLUS CELLAR CONDOMINIUM UNIT# 5 AS INDICATED ON PLANS. NO CHANGES TO EXIST. USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Apr 10, 2026 |
| B |
| 8 |
Plumbing · ALT APPLICATION FOR MINOR PLUMBING WORK, FOR SMALL COMMERCIAL COFFEE SHOP BUILDOUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Apr 10, 2026 |
| B | ANNMARIE KHAN & ANDRE KHA NYC DOB building permits | 8 | Foundation · NEW BUILDING - 2 FAMILIES No product keyword matched | 0 | Apr 10, 2026 |
| B | DAGNY 751, LLC NYC DOB building permits | 8 | Mechanical Systems · Installation of new fuel cell generating system with auxiliary equipment. New mechanical exhaust system. Related Alt I #220742926 approved by DOB accordingly. No product keyword matched | 0 | Apr 10, 2026 |
| B | MICKWILLI NYC DOB building permits | 8 | General Construction · JOB FILED TO REFILE THE BIS JOB#321492149, SHOW THE CONVERSION OF THE BACK OF THE FIRST FLOOR FROM RESIDENTIAL TO COMMERCIAL, 2ND FLOOR 1 APARTMENT, 3RD FLOOR 1 APARTMENT AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Apr 10, 2026 |
| B | CHEESE BUS INC NYC DOB building permits | 8 | Mechanical Systems · INSTALL (5) DUCTLESS HVAC SPLIT SYSTEMS AND (1) DUCTED HEAT PUMP SPLIT SYSTEMS No product keyword matched | 0 | Apr 10, 2026 |
| B | A&M REAL ESTATE CONSTRUCTION LLC NYC DOB building permits | 8 | Curb Cut · PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE. No product keyword matched | 0 | Apr 10, 2026 |
| B | 541 MARCY AVENUE APARTMENTS LLC NYC DOB building permits | 8 | Solar · Installation of solar panels, rooftop, grid tied, railed 7 modules, 2.87 KW No product keyword matched | 0 | Apr 10, 2026 |
| B | ZIAUR BHUIYAN NYC DOB building permits | 8 | Structural · MODIFICATIONS TO INTERIOR BEARING WALL AND REMOVAL OF NON-STRUCTURAL PARTITIONS AT THE SECOND FLOOR ONLY No product keyword matched | 0 | Apr 10, 2026 |
| B | 415 Smith PropCo LLC NYC DOB building permits | 8 | Plumbing · FILING FOR PLUMBING WORK No product keyword matched | 0 | Apr 10, 2026 |
| B | LIGHTNING MECHANICAL LLC NYC DOB building permits | 8 | Mechanical Systems · Replacing the HVAC Units. No product keyword matched | 0 | Apr 10, 2026 |
| B | 25th Street Chelsea Equities LLC NYC DOB building permits | 8 | General Construction · Replacement/stitching of cracked/spalled brick, brick repointing, concrete sill repair, sealant replacement, hairline concrete crack repair. no chnage in use, egress and occupancy. No product keyword matched | 0 | Apr 10, 2026 |
| B | ROCKAWAY CUSTOM CABINETS NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APARTMENT PHW ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.. No product keyword matched | 0 | Apr 10, 2026 |
| B | 124West87 LLC NYC DOB building permits | 8 | Structural · Minor repair at the joint between the existing rear facade and the existing rear extension. Work to be done from exterior. No interior work. No product keyword matched | 0 | Apr 10, 2026 |
| B | 258 20TH REALTY CORP NYC DOB building permits | 8 | Structural · CONSTRUCTION OF STEEL DUNNAGE FRAMING FOR PROPOSED ROOF TOP UNITS. APPLICATION FILED IN CONJUNCTION WITH M01260395-I1 (GC), M01327973-I1 (PL) AND M01327873-S1 (MS). No product keyword matched | 0 | Apr 10, 2026 |
| B | ZION MGMT NYC DOB building permits | 8 | Plumbing · Restore fire damaged conditions in Apt 1B to prior legal condition. Resolve HPD vacate. No elective work. No change to use, occupancy, egress, layout, or ratings No product keyword matched | 0 | Apr 10, 2026 |
| B | FORTINIMAKRISLLC NYC DOB building permits | 8 | General Construction · LEGALIZE EXISTING BATHROOM ASSOCIATED WITH EXISTING DWELLING UNIT IN THE CELLAR. No product keyword matched | 0 | Apr 10, 2026 |
| B | 124 EAST 84TH ST. CORPORATION NYC DOB building permits | 8 | General Construction · FACADE REPAIRS AND MINOR ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 10, 2026 |
| B | Go Doggy NYC DOB building permits | 8 | Mechanical Systems · Mechanical work associated with conversion of building into daycare facility No product keyword matched | 0 | Apr 10, 2026 |
| B | ASA CONSTRUCTION CO NYC DOB building permits | 8 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 10, 2026 |
| B | R&SS GENERAL CONSTRUCTION CORP NYC DOB building permits | 8 | Solar · Installation of solar panels, rooftop, grid tied, railed, 7 modules, 2.87 KW No product keyword matched | 0 | Apr 10, 2026 |
| B | TOMPKINS WEST REAL ESTATE LLC NYC DOB building permits | 8 | Mechanical Systems · APPLICATION FOR SPLIT AC UNITS PROVIDING HEAT & AC TO THE EXISTING 1-FAMILY BUILDING. No product keyword matched | 0 | Apr 10, 2026 |
| B | GUN HILL RD APARTMENTS LLC NYC DOB building permits | 8 | General Construction · Convert one hotel room to one office. No product keyword matched | 0 | Apr 10, 2026 |
| B | EDWARD LIZZUL NYC DOB building permits | 8 | Plumbing · REPLACE ONE GAS BOILER WITH THREE GAS BOILERS, THREE GAS HOT WATER HEATERS AND THREE GAS METERS. INSTALL ONE TOILET AND SINK AND GAS RE-PIPE OF ENTIRE BUILDING. No product keyword matched | 0 | Apr 10, 2026 |
| B | COOKIES DEPARTMENT STORES NYC DOB building permits | 8 | Mechanical Systems · DISCONNECT EXISTING ROOFTOP UNIT FROM GAS SUPPLY LINE, ELECTRICPOWER & DUCT SYSTEM. REMOVE EXISTING ROOFTOP UNITS. INSTALL PACKAGED GAS ROOFTOP UNITS ON EXISTING DUNNAGE SUPPORT. CONNECT NEW ROOFTOP UNITS TO EXISTING GAS SUPPLY LINE, ELECTRICPOWER & DUCT No product keyword matched | 0 | Apr 10, 2026 |
| B | DYCON ENTERPRISES INC NYC DOB building permits | 8 | General Construction · Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress. No product keyword matched | 0 | Apr 10, 2026 |
| B | STAR CITIES MANAGEMENT NYC DOB building permits | 8 | Plumbing · SUBSEQUENT FILING TO RESOLVE INSPECTOR'S OBJECTIONS ON APPLICATION # M01008543-S2 -S2.ALL MECHANICAL AND PLUMBING WORK ARE EXISTING AND FILED UNDER OTHER JOB APPLICATION LISTED ON G-001.00. No product keyword matched | 0 | Apr 10, 2026 |
| B | ARDSLEY CONSTRUCTION SERV NYC DOB building permits | 8 | Curb Cut · Curb cut filed in conjunction with NB # 121188847. No product keyword matched | 0 | Apr 10, 2026 |
| B | SUNSET PARK CONDO NYC DOB building permits | 8 | General Construction · Interior renovation of an existing commercial space. No changes to use, egress, or occupancy. No product keyword matched | 0 | Apr 10, 2026 |
| B | EAST COAST ACQUISITIONS, LLC NYC DOB building permits | 8 | General Construction · Interior renovation of existing partial commercial space per plans. No product keyword matched | 0 | Apr 10, 2026 |
| B | SQUARE ARCH, LLC NYC DOB building permits | 8 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 10, 2026 |
| B | 169-28 JAMAICA AVE NYC DOB building permits | 8 | Plumbing · HEREBY FILING FOR THE INSTALLATION OF COMMERCIAL GAS COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 10, 2026 |
| B | EDUCATIONAL ALLIANCE NYC DOB building permits | 8 | General Construction · Filing herewith Alteration Type one to change the use on the 2nd floor as per plans. No product keyword matched | 0 | Apr 10, 2026 |
| B | Professional Housekeeper NYC DOB building permits | 8 | Solar · Installation of solar panels, rooftop, grid tied, railed, 17 modules, 7.48 KW No product keyword matched | 0 | Apr 10, 2026 |
| B | ULTAN INTERIORS INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APARTMENT 1120 ON THE 11TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 10, 2026 |
| B | Mary's Fish Camp NYC DOB building permits | 8 | Mechanical Systems · PROPOSED INSTALLATION OF AIR CONDITIONER SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCYUNDER THIS APPLICATION. No product keyword matched | 0 | Apr 10, 2026 |
| B | Richmond Pizza Hut NYC DOB building permits | 8 | Plumbing · Herewith plumbing fixtures and kitchen equiptments installation. No demolition, no enlargement of existing footprint. No change of certificate of occupancy and use, exits. No product keyword matched | 0 | Apr 10, 2026 |
| B | 307 West 153rd St HDFC NYC DOB building permits | 8 | Plumbing · RELOCATION OF EXISTING GAS METERS FROM DWELLING UNITS TO CELLAR- NO CHANGE IN USE/OCCUPANCY, EGRESS, ROOM COUNT/DWELLING UNITS No product keyword matched | 0 | Apr 10, 2026 |
| B | 3797 TREMONT LLC NYC DOB building permits | 8 | Sign · APPLICATION HEREWITH FILED TO PROPOSE NEW STATIONARY NON-ILLUMINATED AND ILLUMINATED INDIRECT SIGN TO BE IN COMPLIANCE. No change in use, egress , and occupancy. No product keyword matched | 0 | Apr 10, 2026 |
| B | CLASS IRON DESIGNS INC NYC DOB building permits | 8 | Protection and Mechanical Methods · INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Apr 10, 2026 |
| B | GSN NYC DOB building permits | 8 | General Construction · Renovate 2 stores on the 1st floor and 2 apartments on the 2nd floor. No change to use, egress or occupancy. No product keyword matched | 0 | Apr 10, 2026 |
| B | C&C DALEY'S CONST.CORP NYC DOB building permits | 8 | Suspended Scaffold · SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. No product keyword matched | 0 | Apr 10, 2026 |
| B | NEW HOPE FAMILY WORSHIP CENTER NYC DOB building permits | 8 | Mechanical Systems · NO CHANGE IN USE, EGRESS, & OCCUPANCY. HEREWITH FILING NEW MECHANICAL APPLICATION FOR PROPOSED HEATING & COOLING SYSTEMS ROOF TOP. No product keyword matched | 0 | Apr 10, 2026 |
| B | Dono Doughnut inc. NYC DOB building permits | 8 | Mechanical Systems · MINOR INTERIOR RENOVATION TO THE FIRST FLOOR COMMERCIAL SPACE (DELI), INCLUDING THE INSTALLATION OF A NEW MECHANICAL HOOD, DUCTS, AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 10, 2026 |
| B | PROLINE RESTORATION SVC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APARTMENT 2D ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 10, 2026 |
| B | T.L.C. INDUSTRIES INC NYC DOB building permits | 8 | General Construction · Installation and replacement of electric vehicle charging stations with bollards in 2nd floor parking garage. Removal, installation, replacement of charging cabinets with concrete pads and landscaping on grade. No change to occupancy, use or egress. No product keyword matched | 0 | Apr 10, 2026 |
| B | PARMA ELECTRICAL CORP NYC DOB electrical permits | 8 | General wiring cellar, 1 fl, 1 fl. mezz, and roof. No product keyword matched | 0 | Apr 10, 2026 |
| B | 45 GRAMERCY PARK TENANTS CORP NYC DOB building permits | 8 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 9, 2026 |
| B | STORY 1905 LLC, DBA - DUNKIN DONUTS NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF MECHANICAL UNITS AT AN EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Apr 9, 2026 |
| B | BSC RENOVATION INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AND RESTORATION AS INDICATE ON THE PLANS. No product keyword matched | 0 | Apr 9, 2026 |