Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | TRYAX REALTY MANAGEMENT INC. NYC DOB building permits | 8 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. No product keyword matched | 0 | Apr 16, 2026 |
| B | ENOPAC HOLDING NYC DOB building permits | 8 |
Plumbing · FILING HEREWITH PLUMBING WORK ASSOCIATED WITH TENANT FIT OUT No product keyword matched |
| 0 |
| Apr 16, 2026 |
| B | SCHUMACHER & FARLEY P&H C NYC DOB building permits | 8 | Plumbing · Alteration of existing domestic water, sanitary, and gas systems. Restroom fixtures were replaced with new in the same locations. Provide water and sanitary for new water heater and (2) new sinks. Existing gas piping to remain and re-feed new HVAC. No product keyword matched | 0 | Apr 16, 2026 |
| B | CABA TECH NYC DOB building permits | 8 | Plumbing · INTERIOR RENOVATION OF EXISTING DWELLING ON SECOND FLOOR, INCLUDING RELOCATION OF KITCHEN, NO CHANGE IN EGRESS USE OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | MONA LIZA FINE FURNITURE NYC DOB building permits | 8 | Plumbing · TO RELOCATE TWO BATHROOM FIXTURES IN EXISTING ASSEMBLY SPACE. NO CHANGE IN USE EGRESS OR OCCUPANCY. ALL GC WORK TO BE FILED UNDER INITIAL APPLICATION. No product keyword matched | 0 | Apr 16, 2026 |
| B | BLACK EAGLE PROPERTIES LLC NYC DOB building permits | 8 | General Construction · ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION WORK INCLUDES ERECT NEW INTERIOR PARTITIONS, DRYER VENT, HOT WATER HEATER VENT, AND A/C INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | BRELLA SERVICES LLC NYC DOB building permits | 8 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 16, 2026 |
| B | KITCHENFACTORY.COM INC NYC DOB building permits | 8 | General Construction · RENOVATION/RELOCATION OF KITCHEN, LAUNDRY ROOM & THREE 3-PIECE BATHROOMS & MINOR PARTITION WORK. NO CHANGE OR USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | COLUMBIA RESIDENTIAL NYC DOB building permits | 8 | General Construction · EXISTING WALLS TO BE OPENED TO ALLOW FOR NEW ELECTRICAL FEED SERVICING THE ELECTRICAL RANGES. WALLS SHALL BE PATCHED ONCE CONSTRUCTION IS COMPLETED AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | UNISOL INC NYC DOB building permits | 8 | Mechanical Systems · Interior alterations to existing 2 family house. New mechanical split units. New lighting and replacement of select windows. No change to use or egress. No product keyword matched | 0 | Apr 16, 2026 |
| B | Jewish Center of Kings Highway NYC DOB building permits | 8 | Mechanical Systems · HVACE WORK FOR THE INSTALLATION OF 3 NEW 5 TON HEAT PUMP SYSTEMS-REPLACEMENT OF ONE 4 TON HEAT PUMP SYSTEM IN KIND AND ASSOCIATED DUCT AND PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | IMISKINCARE&PRODUCT NYC DOB building permits | 8 | Plumbing · EXISTING KITCHEN AND BATHROOM RENOVATION ON THE 1ST FL. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 16, 2026 |
| B | Moonstone 4213 LLC NYC DOB building permits | 8 | Plumbing · FILING THIS APPLICATION FOR EXISTING 2 FAMILY DWELLING UNITS, ON CELLAR,2ND FL& 3RD FL,TO INSTALL NEW PLUMBING FIXTURES AS PER PLAN. GENERAL CONSTRUCTION WILL FILED ON SEPARATE APPLICATION.NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 16, 2026 |
| B | 16 Rewe Street LLC NYC DOB building permits | 8 | Structural · EWO 350483,350484,350482:EMERGENCY SELECTIVE DEMO OF PORTION OF EXISTING BUILDING AND INSTALLATION OF NEW TEMPORARY STEEL FRAMING. THIS IS A TEMPORARY CONDITION,WHEN SEA WALL IS RESTORED BY OTHERS, FOOTPRINT RESTORED TO ORIGINAL BUILDING FOOTPRINT. No product keyword matched | 0 | Apr 16, 2026 |
| B | Welltower Inc NYC DOB building permits | 8 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY GROUND SIGN FOR RELATED HEALTH FACILITY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | UNIVERSAL HEATING & AIR C NYC DOB building permits | 8 | Mechanical Systems · MH WORK RELATED TO PROJECT OF SELECTIVE REMOVAL AND NEW CONSTRUCTION FOR AREAS OF RENOVATION ON THE CELLAR, 1ST, 2ND AND 3RD FLOORS AND THE REAR ALLEYWAY. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. No product keyword matched | 0 | Apr 16, 2026 |
| B | GARN NY093, INC. NYC DOB building permits | 8 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | KINGFISHER GENL CONTNG OF NYC DOB building permits | 8 | Suspended Scaffold · INSTALLATION OF OUTRIGGER FOR FACADE REPAIR AND BUILDING INSPECTION. No product keyword matched | 0 | Apr 16, 2026 |
| B | MARK RODER NYC DOB building permits | 8 | Plumbing · APPLICATION FILED FOR PLUMBING WORK OF EXISTING APT 22J IN RESIDENTIALBUILDING. WORK INCLUDES:- NEW TOILET AND VANITY IN EXISTING ROUGH.- NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Apr 16, 2026 |
| B | WOODSIDE LANDMARK REALTY, LLC NYC DOB building permits | 8 | Foundation · HEREWITH FILING FOUNDATION PLANS FOR FOOTINGS OF THE PROPOSED STAIRCASE FRAMING IN THE EXISTING 1-STORY BUILDING. THE SCOPE OF WORK INVOLVES ONLY TWO ISOLATED FOOTINGS. NO OTHER WORK. THIS JOB IS FILED IN CONJUNCTION TO DOB JOB NO. Q00897692-I1 No product keyword matched | 0 | Apr 16, 2026 |
| B | NNCHRISMEL LLC NYC DOB building permits | 8 | General Construction · APPLICATION FILED TO PROPOSED POWDER ROOM AND ACCESSORY STORAGE. PLUMBING WORK FOR REFERENCE & TO BE FILED UNDER SEPARATE APPLICATION. IN ORDER TO RECTIFY ECB VIOLATIONS #39133088X, #39133099L, & #39133087Y. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 16, 2026 |
| B | NIFTY CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · PROPOSED: Interior renovation at cellar level, new bench footing, vapor barrier, new tiles, replace old metal columns with new 4 Column, new reinforced concrete spread footing. Lower the lavel of cellar 12. as per plans. No product keyword matched | 0 | Apr 16, 2026 |
| B | LUZ ELECT & CONTL SYSTMS NYC DOB electrical permits | 8 | Remove and replace existing emergency lighting and exit lights and reconnected the existing circuit wiring to the existing panel located at the main entrance. No product keyword matched | 0 | Apr 16, 2026 |
| B | LECOMPLES ELECTRIC CORP NYC DOB electrical permits | 8 | Electrical Service and Branch Upgrade. No product keyword matched | 0 | Apr 16, 2026 |
| B | M.W. EXPEDITING INC NYC DOB building permits | 8 | General Construction · Interior and exterior renovation work being done on the first and second floors. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 15, 2026 |
| B | 1978 NEEDHAM AVE LLC NYC DOB building permits | 8 | Earth Work · FOUNDATION AND EARTHWORK SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #X01245869-I1 No product keyword matched | 0 | Apr 15, 2026 |
| B | MARGULES PROPERTIES NYC DOB building permits | 8 | Plumbing · PLUMBING WORK AT APT 4E AT PARTIAL 4TH FLOOR AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Apr 15, 2026 |
| B | LOFT CONTRACTING NEW YORK NYC DOB building permits | 8 | General Construction · SCOPE OF WORK: PARTIAL RENOVATION OF SINGLE-FAMILY DWELLING ON 1ST AND 2ND FLOORS TO INCLUDE NEW STRUCTURAL OPENING AND NEW INTERIOR PARTITIONS AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 15, 2026 |
| B | IDEA BUILDERS LLC NYC DOB building permits | 8 | Full Demolition · Full demolition to a three story house No product keyword matched | 0 | Apr 15, 2026 |
| B | GOLDIN CHOICE MANAGEMENT NYC DOB building permits | 8 | General Construction · LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 15, 2026 |
| B | CASABE II HDFC INC NYC DOB building permits | 8 | Mechanical Systems · PROPOSED MECHANICAL WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Apr 15, 2026 |
| B | NOTRAND DEVELOPMENT LLC NYC DOB building permits | 8 | Curb Cut · cc application in conjunction with NB applicaiton No product keyword matched | 0 | Apr 15, 2026 |
| B | SAFE ASSURE CONSTRUCTION NYC DOB building permits | 8 | General Construction · Renovation of Existing One Family Dwelling. Renovation and Second story extension legalization to correct work without permit violation #010307C0801JG and stop work order. No product keyword matched | 0 | Apr 15, 2026 |
| B | Mosholu Concourse HDFC NYC DOB building permits | 8 | Standpipe · Installation of an automatic standpipe system in conjunction with job no. 210180775; no change to use, egress or occupancy. No product keyword matched | 0 | Apr 15, 2026 |
| B | Family Residences & Essential Enter NYC DOB building permits | 8 | General Construction · INTERIOR ALTERATIONS TO AN EXISTING 2-FAMILY DWELLING. EACH DWELLING UNIT WILL BE USED AS A GROUP HOME, KNOWN AS AN INDIVIDUALIZED RESIDENTIAL ALTERNATIVE (IRA) FOR (3) RESIDENTS EACH AND CERTIFIED BY NYS OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES. No product keyword matched | 0 | Apr 15, 2026 |
| B | THURCON PROPERTIES NYC DOB building permits | 8 | Boiler Equipment · REGISTER HIGH PRESSURE STEAM GAS BOILER TO OBTAIN INSPECTION AND SIGN-OFF IN RESPONSE TO VIOLATION #39145823L AND #039145822J. No product keyword matched | 0 | Apr 15, 2026 |
| B | DAKOTA UNITED GROUP LLC NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. No product keyword matched | 0 | Apr 15, 2026 |
| B | 590 EJ LLC NYC DOB building permits | 8 | Plumbing · LEGALIZATION OF TWO STORY REAR EXTENSION TO ADDRESS VIOLATIONS (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED WITH THIS APPLICATION. No product keyword matched | 0 | Apr 15, 2026 |
| B | 11154255 NYC DOB building permits | 8 | Plumbing · FILE PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION JOB #Q01270823-I1 No product keyword matched | 0 | Apr 15, 2026 |
| B | K.CRAFT CORPORATION NYC DOB building permits | 8 | General Construction · Renovation of an existing apartment. A new masonry opening is proposed. No change of use, occupancy or egress. No product keyword matched | 0 | Apr 15, 2026 |
| B | DIRECTOR ENGINEERING NYC DOB building permits | 8 | Mechanical Systems · Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There is no change in occupancy, use or egress. No product keyword matched | 0 | Apr 15, 2026 |
| B | La Bella Pizza NYC DOB building permits | 8 | General Construction · INSTALLATION OF AWNING ON FRONT BUILDING FACADE AT 1ST FLOOR LEVEL FOR EXISTING STORE. No product keyword matched | 0 | Apr 15, 2026 |
| B | 1869 RICHMOND AVENUE HOLDINGS LLC NYC DOB building permits | 8 | Mechanical Systems · Direct replacement of existing first floor furnace /coil . reconnecting to existing utilities and ductwork. no modification to existing gas piping No product keyword matched | 0 | Apr 15, 2026 |
| B | WKRM Holding LLC. NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF A NEW WALK-IN FREEZER. MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 15, 2026 |
| B | kaza pilates llc NYC DOB building permits | 8 | Sign · NON-Illuminated Advertising sign - KAZA PILATES - inside property line No product keyword matched | 0 | Apr 15, 2026 |
| B | TOWER CREATIONS CORP NYC DOB building permits | 8 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT WRAPAROUND AWNINGS - NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 15, 2026 |
| B | SMITH PROPERTIES LLC NYC DOB building permits | 8 | Structural · RECONSTRUCTION OF LOT LINE WALL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 15, 2026 |
| B | LEONARDO CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · Renovate kitchen and powder room. Modified openings to rear yard. Living room and dining room non load bearing partitions to be removed. Removal of non load bearing partitions at the second floor, modify bedrooms and bathrooms. No product keyword matched | 0 | Apr 15, 2026 |
| B | BALINK MANAGEMENT NYC DOB building permits | 8 | General Construction · PROPOSED OF RUSTED WINDOW LINTELS AS PER PLANS.NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 15, 2026 |
| B | REVIVAL SURVIVAL LLC NYC DOB building permits | 8 | General Construction · Construction of interior partition and doorway. No product keyword matched | 0 | Apr 15, 2026 |