Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CASERA NYC DOB building permits | 8 | General Construction · CONVERSION OF AN EXISTING 3 FAMILY BUILDING TO A 1 FAMILY BUILDING. INTERIOR DEMOLITION COMPLETED UNDER GC #B01151090-I1 No product keyword matched | 0 | Apr 23, 2026 |
| B | CLOUD NINE ASSOCIATE INC NYC DOB building permits |
| 8 |
General Construction · INTERIOR RENOVATIONS INCLUDING INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 0 |
| Apr 23, 2026 |
| B | Mustang Gold LLC NYC DOB building permits | 8 | Plumbing · Application filed to indicate the plumbing work for the proposed renovation to the existing kitchens & bathrooms on the Basement, 001-003 Floors. The General Construction work filed under Initial Applic # B01358943-I1. No change in bulk, use or egress. No product keyword matched | 0 | Apr 23, 2026 |
| B | Uka Omakase NYC DOB building permits | 8 | General Construction · FILING FOR EATING AND DRINKING ESTABLISHMENT SUSHI RESTAURANT NO COOKING WORK INCLUDE PARTITION INSTALLATION AND CEILING REPAIR. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 23, 2026 |
| B | Elle Food Group LLC NYC DOB building permits | 8 | Plumbing · PLUMBING FIXTURES FOR AN EXISTING COFFEE SHOP, NEW SINK COMP, HANK SINK, NEW COFFEE MACHINE, AND AND MOP SINK / NO CHANGE OR EGRESS OCCUPANCY No product keyword matched | 0 | Apr 23, 2026 |
| B | TSINY SERVICES INC NYC DOB building permits | 8 | Plumbing · REGISTER TWO (2) GAS WATER HEATERS. FILE FOR THE CAP & REMOVAL OF THREE (3) GAS WATER HEATERS. No product keyword matched | 0 | Apr 23, 2026 |
| B | YESHIVA BETH HILLEL NYC DOB building permits | 8 | General Construction · FACADE REPAIRS No product keyword matched | 0 | Apr 23, 2026 |
| B | ALPHA DYNAMICS LTD NYC DOB building permits | 8 | Suspended Scaffold · FILING TO INSTALL OUTRIGGER ON THE ROOF FOR FACADE WORK AS PER PLANS No product keyword matched | 0 | Apr 23, 2026 |
| B | ACER RESTORATIONS LLC NYC DOB building permits | 8 | General Construction · General Construction plans filed herewith for Partial renovation of existing penthouse apartment, PHA. No change to use, egress, or occupancy. No product keyword matched | 0 | Apr 23, 2026 |
| B | J STONE BUILDERS INC NYC DOB building permits | 8 | General Construction · Legalization of full bathroom at cellar and misc cellar partition (closets...). Restrictive declaration for 3pc Bathroom filed under CRFN#2025000256004 No product keyword matched | 0 | Apr 23, 2026 |
| B | JARLATH CONNAUGHTON NYC DOB building permits | 8 | General Construction · Interior modification existing apartment 9th floor, Apt. 9J limited removal nonloadbearing partitions; install new nonstructural metalstud partitions & suspended gypsum ceiling; repair & replace interior finishes. No change in use, occupancy, or egress. No product keyword matched | 0 | Apr 23, 2026 |
| B | YESHIVA OF KINGS BAY NYC DOB building permits | 8 | General Construction · Temporary Trailers in Yard filed for Temp use permit and removal of 9'wall. No product keyword matched | 0 | Apr 23, 2026 |
| B | MASTER SWEETS NYC DOB building permits | 8 | Plumbing · Replace existing boiler with new tankless combi boiler. Gas piping and gas meters are existing. No product keyword matched | 0 | Apr 23, 2026 |
| B | PARAB ASSOCITES NYC DOB building permits | 8 | General Construction · Facade repair No product keyword matched | 0 | Apr 23, 2026 |
| B | M.C.P RESTORATION CORP NYC DOB building permits | 8 | General Construction · RENOVATE EXISTING APARTMENT, PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 23, 2026 |
| B | 414 ELECTRIC CORPORATION NYC DOB electrical permits | 8 | PLP Meter to Existing Service-15 Smoke Detectors-(3)-30/60 circuits panel boards with 125amp main breaker and surge protectors-2 dedicated circuits for kitchen counter GFCI outlets for the 1st and 2nd floor apartments-1 dedicated washer outlet and dedicated dryer outlet in garaged (GFCI Protected)-(3) single 125amp meter pans for each unit: PLP, 1st&2ndfl. In the PLP basement area, dedicated circuits for 30amp 220volt water heater and 20amp 120volt dedicated circuit, 1st&2ndfl water heaters. No product keyword matched | 0 | Apr 23, 2026 |
| B | STAR ELECTRIC CORP NYC DOB electrical permits | 8 | 18 FLOOR - INSTALL ALL WIRING FOR OFFICE # 1804 No product keyword matched | 0 | Apr 23, 2026 |
| B | BIANCO ELECTRIC INC. NYC DOB electrical permits | 8 | Building 2 Apt 14Dwire bathrooms, laundry room general wiring for light and power No product keyword matched | 0 | Apr 23, 2026 |
| B | 2811 FARRAGUT LLC NYC DOB building permits | 8 | General Construction · NEW 4 STORY BUILDING. 1 STORY COMMUNITY FACILITY AND 3 STORIES AND MEZZANINE RESIDENTIAL No product keyword matched | 0 | Apr 22, 2026 |
| B | BROOKLYN NYC DOB building permits | 8 | Plumbing · SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBINGFIXTURES ON ALL FLOORS; COLD AND HOT WATER PIPES IN CONJUNCTION TO ALT JOB B01104455-I1 No product keyword matched | 0 | Apr 22, 2026 |
| B | LUC1 CONTRACTING INC NYC DOB building permits | 8 | General Construction · RENOVATION OF EXISTING MIXED USE BUILDING, FRONT FACADE ALTERATIONS, PARTITIONS WORK, RELATED PLUMBING AND MECHANICAL WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 22, 2026 |
| B | mamiye brothers NYC DOB building permits | 8 | Sprinklers · Sprinkler work on the 17th and 18th floor (Mamiye) as indicated on drawings. No product keyword matched | 0 | Apr 22, 2026 |
| B | GO COVENANT LLC NYC DOB building permits | 8 | Plumbing · New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress. No product keyword matched | 0 | Apr 22, 2026 |
| B | PANILI PLUMBING & HTG LLC NYC DOB building permits | 8 | Plumbing · Plumbing work filed in conjunction with Q01296001-I1. No product keyword matched | 0 | Apr 22, 2026 |
| B | PATSY VENDITTI & SON INC NYC DOB building permits | 8 | Foundation · CONSTRUCT DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR THREE CARS. No product keyword matched | 0 | Apr 22, 2026 |
| B | ASC PROPERTIES NYC DOB building permits | 8 | Suspended Scaffold · INSTALLATION OF TWO POINT SUSPENDED SCAFFOLD FOR WORKER ACCESS DURING CONSTRUCTION. TWO POINT SUSPENDED SCAFFOLD SHALL COMPLY WITH NYCC 2022 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | Carlyle Development Group NYC DOB building permits | 8 | Full Demolition · full demolition of structure under DOB ED issued on 12/15/25 121225C25-03148 No product keyword matched | 0 | Apr 22, 2026 |
| B | 608 DEGRAW REALTY LLC NYC DOB building permits | 8 | Mechanical Systems · Proposed new unit furnace heaters, no change to use, egress or occupancy. No product keyword matched | 0 | Apr 22, 2026 |
| B | TL Fulton LLC NYC DOB building permits | 8 | General Construction · GENERAL RENOVATION ON 2ND & 3RD FL AND ROOF OF MIXED USE BUILDING WITH, REPAIR/REPLACE/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING, ALSO NEW STEEL DUNNAGE AND SPLIT TYPE A/C AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | 158 CLINTON 47 LLC NYC DOB building permits | 8 | Plumbing · Plumbing System modifications and installations related to enlargement. No product keyword matched | 0 | Apr 22, 2026 |
| B | 177 FRANKLIN LLC NYC DOB building permits | 8 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | 192 COLUMBIA HEIGHTS LLC NYC DOB building permits | 8 | Structural · Structural roof repair and structural repair throughout exiting 1 family house. No change to use, egress or occupancy under this application. No product keyword matched | 0 | Apr 22, 2026 |
| B | One More Venture LLC NYC DOB building permits | 8 | Plumbing · Plumbing work related to tenant store renovation as per plans filed herewith. No product keyword matched | 0 | Apr 22, 2026 |
| B | 2913 AVENUE W LLC NYC DOB building permits | 8 | General Construction · INSTALL A NON-ILLUMINATED AWNING WITH NO GRAPHICS FOR WONDER, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | ALANTE CONSTRUCTION CORP NYC DOB building permits | 8 | General Construction · CONSTRUCTION OF A NEW PUMP ROOM ON THE ROOF AS SHOWN ON PLANS. THE MECHANICAL AND STRUCTURAL PORTIONS WILL BE FILED UNDER SEPARATE APPLICATIONS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 22, 2026 |
| B | CoreHaus Fitness NYC DOB building permits | 8 | Plumbing · MODIFICATIONS TO EXISTING PLUMBING SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Apr 22, 2026 |
| B | ESL Properties LLC NYC DOB building permits | 8 | Solar · Installation of Solar PV system on existing rooftop with no change to egress, use or occupancy No product keyword matched | 0 | Apr 22, 2026 |
| B | HHC-BELLEVUE HOSPITAL NYC DOB building permits | 8 | Mechanical Systems · MH WORK INCLUDES, BUT NOT LIMITED TO, INSTALLATION OF (2) NEW CHILLERS ON 4TH FL ROF WITH ASSOC PIPING AND TANKS, NEW AC UNITS AND ALL ASSOC. DUCTWORK FOR DATA CENTER/IT CLOSETS. DEMO OF. EX. UNITS TO BE REPLACED. NO CHANGE IN USE,EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 22, 2026 |
| B | ACSSYSTEM ASSOCIATE INC NYC DOB building permits | 8 | Protection and Mechanical Methods · Installation of suspended scaffold as per plans filed herewith off existing beam structures. No product keyword matched | 0 | Apr 22, 2026 |
| B | HUAMING INC. NYC DOB building permits | 8 | Plumbing · CAP & REMOVE EXISTING OIL TANK AND OIL BOILER. PLUMBING WORK OF EXISTING 1-FAMILY BUILDING ON CELLAR & 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | OVERTIME PROPERTIES LLC NYC DOB building permits | 8 | Antenna · Modification to existing VERIZON site on the roof. Installation of 3 antennas and 3 GPS antennas. Replacement of 4 antennas and 6 RRH units. Relocation of 4 RRH units. Removal of 3 antennas, 2 GPS antennas. No product keyword matched | 0 | Apr 22, 2026 |
| B | EXEC. DIRECTOR DDCM/CUNY NYC DOB building permits | 8 | Mechanical Systems · Proposed replacement of air handling units and piping. All as per plans filed herewith. No product keyword matched | 0 | Apr 22, 2026 |
| B | PROGRAM DIRECTOR NYC DOB building permits | 8 | Mechanical Systems · Mechanical work related to rooftop HVAC installations as per plans. No product keyword matched | 0 | Apr 22, 2026 |
| B | CHEVRA KOL ISRAEL NYC DOB building permits | 8 | General Construction · Filing application related to exterior repairs, and roof membrane replacement. No structural work to be included. No change to use, egress or occupancy. No product keyword matched | 0 | Apr 22, 2026 |
| B | EAST WEST REALTY NYC DOB building permits | 8 | Mechanical Systems · INSTALL NEW EXTERNAL CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | SHAPIRO & SONS INC NYC DOB building permits | 8 | General Construction · FILING TO ESTABLISH CO TO COMBINE COFFEE SHOP WITH GARAGE SPACE AND ESTABLISHC OF O. INTERIOR RENOVATION AS PER PLAN. No product keyword matched | 0 | Apr 22, 2026 |
| B | 1711 M E T realty corp NYC DOB building permits | 8 | General Construction · Filing to repair existing Fire escape structure/ surfaces as per plans. Filing to lift partial vacate order at Residential units on 2, 3 floors. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Apr 22, 2026 |
| B | 149 HAMILTON LLC NYC DOB building permits | 8 | Antenna · Modification of existing T-Mobile site. Remove 3 RRH units and 3 equipment cabinets and install 2 new equipment cabinets on roof. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 22, 2026 |
| B | Lok's 162 Realty Corp NYC DOB building permits | 8 | Structural · PROPOSED STRUCTURAL WORK TO REINFORCE EXIST. FIRE DAMAGED ROOF JOISTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |
| B | Sun Run NYC DOB building permits | 8 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 22, 2026 |