Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 925 UNION STREET TENANTS CORP. NYC DOB building permits | 8 | General Construction · Exterior repair. No change in sue, occupancy, or egress. No product keyword matched | 0 | Apr 28, 2026 |
| B | LAROSA BROTHER'S PORT RICHMOND, LLC NYC DOB building permits |
| 8 |
Mechanical Systems · REPLACEMENT OF TWO CONDENSING UNITS THE ROOF WITH A TOTAL CAPACITY OF 10 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched |
| 0 |
| Apr 28, 2026 |
| B | ABSOLUTE PLBG HTG & MECH NYC DOB building permits | 8 | Plumbing · PLUMBING WORK AT APT F34 ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Apr 28, 2026 |
| B | Wan Ding LLC NYC DOB building permits | 8 | Mechanical Systems · FILE BOILER WORK TYPE TO INSTALL TWO NEW BOILERS IN THE BASEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 27, 2026 |
| B | HUSBAND WIFE NYC DOB building permits | 8 | Mechanical Systems · APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS IN THE CELLAR & ON THE 3RD, 4TH, 5TH FLOOR & ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | FDL MANAGEMENT CORP NYC DOB building permits | 8 | Full Demolition · full demolition of one story structure using hand held and mechanical means to demolish. No product keyword matched | 0 | Apr 27, 2026 |
| B | TOP ZONE BUILDERS INC NYC DOB building permits | 8 | General Construction · PROPOSED OF BRICK REPLACEMENT, REBUILT PARAPET WALL, WINDOW LINTELS AND WINDOW SILLS TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 27, 2026 |
| B | SKY SL CONSTRUCTION CORP NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION. SCOPE INCLUDES REPLACEAMENT OF DAMAGED STUDS AND SHEETROCK AT LOCATIONS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 27, 2026 |
| B | popwheels NYC DOB building permits | 8 | General Construction · General construction work for (3) exterior battery containment enclosures per BB 2025-009. No change to use, egress, or occupancy. No product keyword matched | 0 | Apr 27, 2026 |
| B | VBGO 425 LEXINGTON LLC NYC DOB building permits | 8 | General Construction · INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. Change of occupancy from 110 to 202 on the 2nd floor Offices. No product keyword matched | 0 | Apr 27, 2026 |
| B | J S SAINI CONSTRUCTION CORP NYC DOB building permits | 8 | Curb Cut · Proposed 10-foot curb cut No product keyword matched | 0 | Apr 27, 2026 |
| B | KEVO CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · GENERAL CONSTRUCTION WORK IN 2-FAMILY BUILDING WITH REMOVE DOOR, PARTITION, NEW/REPAIR PARTITION, CEILING, FLOOR, DOOR AND PAINTING AS PER PLAN AND MECHANICAL WORK WITH INSTALL NEW SPLIT A.C. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | YongFie Chen NYC DOB building permits | 8 | Mechanical Systems · PROPOSED INTERIOR RENOVATION OF EXIST. RESTAURANT. NEW PARTITIONS, COOKING EQUIPMENT, AND FLOORS. MODIFY EXHAUST HOOD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | W&W REALTY MANAGEMENT LLC NYC DOB building permits | 8 | General Construction · terra cotta and stucco repair at the exterior wall of the building as the plan shown. Replace of load bearing bricks as the plan shown. There is no change in use, egress or occupancy. No product keyword matched | 0 | Apr 27, 2026 |
| B | HOUSE NYC DOB building permits | 8 | Solar · INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 20 MODULES, 8.7KW No product keyword matched | 0 | Apr 27, 2026 |
| B | RENOVYT, INC NYC DOB building permits | 8 | General Construction · Modification to interior partitions related to the minor renovation of apartment 2A on the 2nd floor. No product keyword matched | 0 | Apr 27, 2026 |
| B | STATEN ISLAND PLAZA LP NYC DOB building permits | 8 | General Construction · FILING HEREWITH STRUCTRAL AND FOUNDATION WORK ASSOCIATED WITH INSTALLATION OF CANOPY. No product keyword matched | 0 | Apr 27, 2026 |
| B | HMZC MANAGEMENT LLC NYC DOB building permits | 8 | General Construction · PROPOSED INTERIOR RENOVATION WORK FOR EXISTING 3-STORY BUILDING ON CELLAR, 1ST, 2ND & 3RD FLOOR, WITH GENERAL CONSTRUCTION WORK AS PER PLANS. RESOLVE VIOLATIONS:39152557N;39152556L;39143090Y;39143068H. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY No product keyword matched | 0 | Apr 27, 2026 |
| B | 2126 LA FAYETTE CORP. NYC DOB building permits | 8 | Plumbing · INTERIOR RENOVATION TO RESTORE PREMISE TO LEGAL CONDITIONS AND CORRECT ECB VIOLATIONS #'S 35477118L &35477107X.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 0 | Apr 27, 2026 |
| B | HILL TOP MGT NYC DOB building permits | 8 | General Construction · facade repair as per plans filed no change in use occupancy or egress please see comments for scope details No product keyword matched | 0 | Apr 27, 2026 |
| B | 12 Warren St Condominium NYC DOB building permits | 8 | General Construction · General construction work on vault and sidewalk restoration associated with cellar and first floor planter waterproofing restoration. No change in occupancy, use or egress. No product keyword matched | 0 | Apr 27, 2026 |
| B | NO. 7 RESTAURANT NYC DOB building permits | 8 | General Construction · LINTEL REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 27, 2026 |
| B | RESTORATION CHURCH OJCA NYC DOB building permits | 8 | Solar · Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.61 KW No product keyword matched | 0 | Apr 27, 2026 |
| B | JAS Cafe Ltd NYC DOB building permits | 8 | General Construction · Replace Existing Exterior Windows within 1st floor of Existing Restaurant, no change to use, egress or occupancy. No product keyword matched | 0 | Apr 27, 2026 |
| B | JDP DESIGN CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · JOB FILED HEREWITH FOR INTERIOR RENOVATION OF AN EXISTING MIXED USED 2-STORY BRICK BUILDING, WITH INTERIOR RENOVATION OF AS PER PLANS, INCLUDING NEW FINISHES AND NONLOADBEARING PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | KINGSLAND REALTY ASSOCIATES LLC NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF HVAC ROOF TOP UNITS AS PER PLAN No product keyword matched | 0 | Apr 27, 2026 |
| B | AM BUILDING RESTORATION I NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 0 | Apr 27, 2026 |
| B | HILTON GARDEN INN FNANCIAL CENTER NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 0 | Apr 27, 2026 |
| B | MICHAEL'S PLUMBING SUPPLY NYC DOB building permits | 8 | Foundation · Proposed underpinning of existing one (1) story building as adjacent to neighbor building at 1142 Flatbush Avenue. No change to use, occupancy or egress under this application. No product keyword matched | 0 | Apr 27, 2026 |
| B | 458 QUENTIN LLC NYC DOB building permits | 8 | Construction Fence · HEREBY FILING FOR TEMPORARY CONSTRUCTION FENCE No product keyword matched | 0 | Apr 27, 2026 |
| B | LEE & ASSOCIATES MGT LLC NYC DOB building permits | 8 | Mechanical Systems · Proposing Mechanical Work to include removal and insrtallation of (2) new HVAC system with ductwork, grilles, diffusers, duct heaters and (1) exhaust fan. All as per plans. No change to Use, egress or occupancy. No product keyword matched | 0 | Apr 27, 2026 |
| B | PERFORMANCE MAINTENANCE NYC DOB building permits | 8 | General Construction · CHANGE OF USE FROM MANUFACTURING (D2) TO WAREHOUSE (S-2) OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | Bit by Bit Computer Consultants NYC DOB building permits | 8 | General Construction · AN EXISTING COMMERCIAL OFFICE SPACE WITH MINOR PARTITION WORK ON UNIT 1201 ON PARTIAL OF 12 TH FLOOR ONLY; REMOVAL OF VIOLATION #39166584X. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 27, 2026 |
| B | JK RESTORATION CORP NYC DOB building permits | 8 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 27, 2026 |
| B | STELLA TROULAKIS FAMILY TRUST NYC DOB building permits | 8 | General Construction · FILE APPLICATION TO REPAIR/REPLACE PARAPET WALL, REPAIR CRACKS, AND BRICK POINTING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | 340 East 74th St. Owners Corp NYC DOB building permits | 8 | General Construction · PLANTERS RECONSTRUCTION AT THE FRONT FACADE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 27, 2026 |
| B | HUNTING CLUB NYC DOB building permits | 8 | General Construction · INSTALL STOREFRONT AWNING WITH NON-ILLUMINATED COPY READING THE SMILIST. COPY NOT TO EXCEED 12 SQ FT TOTAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 27, 2026 |
| B | JJT CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · CONVERT CELLAR TO APARTMENT, CONVERT FROM A ONE TO TWO FAMILY DWELLING. No product keyword matched | 0 | Apr 27, 2026 |
| B | PRESHER WINDOWS LLC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF EXISTING APT. UNIT # 7E AT 7TH FLOOR AS PER PLAN. PLUMBING WORK TYPE TO BE FILED UNDER SEPARATE DOB NOW APPLICATION.NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | 3072 STEINWAY STREET CORP NYC DOB building permits | 8 | Plumbing · Installation of plumbing fixtures; Related with Alternation 1 #420915987. No product keyword matched | 0 | Apr 27, 2026 |
| B | ANNIE CHAU YING LUI IRREVOCABLE TRU NYC DOB building permits | 8 | General Construction · TO REMOVE EXISTING AWNING AT 1ST FLOOR OF EXISTING 2-STORY BUILDING. ADDRESS VIOLATION ECB#35271838X AND 35395652M. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | PYRAMID RESTORATION INC NYC DOB building permits | 8 | Structural · Structural work for garage slab repairs as shown on plans No product keyword matched | 0 | Apr 27, 2026 |
| B | Liras Construction Corp NYC DOB building permits | 8 | General Construction · Interior demolition of the existing first-floor commercial space, along with the existing dwelling units on the second and third floors. This filing is also intended to address and help cure Violation No. 35386192X No product keyword matched | 0 | Apr 27, 2026 |
| B | KATZ'S DELICATESSEN NYC DOB building permits | 8 | General Construction · PROPOSED INTERIOR RENOVATION WITHIN A DESIGNATED PARTIAL AREA OF THE GROUND FLOOR OF AN EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ASSOCIATED APPLICATION: PA FILING #M01332402_I1 No product keyword matched | 0 | Apr 27, 2026 |
| B | SMART MOVE HVAC LLC NYC DOB building permits | 8 | Mechanical Systems · HEREBY FILING FOR THE RENOVATION OF 2 FAMILY DWELLING (INSTALLATION OF SPLIT SYSTEMS). NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | SHP Park Slope LLC NYC DOB building permits | 8 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | CLEARVIEW GARDENS CORP NYC DOB building permits | 8 | Plumbing · INSTALL (1) NEW GAS FIRED DOMESTIC HOT WATER HEATER WITH (1) NEW STORAGE TANK. CONNECT TO EXISTING LOW PRESSURE GAS LINE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |
| B | SWEET LOW SUGAR NYC DOB building permits | 8 | Plumbing · CREATED ONE BATHROOM WITH LAV.. NO CHANGE TO USE, EGRESS AND OCCUPANCY. NO PROPOSED EFFECT, ALTERATION, OR MODIFICATION ON EXISTING SYSTEMS, BUILDING RISER No product keyword matched | 0 | Apr 27, 2026 |
| B | Los Sabores de mi Tierra Bakery & R NYC DOB building permits | 8 | Plumbing · Installation of plumbing fixtures for existing eating and drinking space. No change in use, egress, or occupancy is involved. No product keyword matched | 0 | Apr 27, 2026 |
| B | HUDSON VIEW ASSOCIATES INC. NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AND COMBINE APARTMENTS B & C TO CREATE LARGER RESIDENTIAL UNIT ON 7TH FLOOR OF EXISTING 6- STORY BUILDING WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH.NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Apr 27, 2026 |