Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MR. NYC DOB building permits | 8 | Plumbing · Plumbing renovation work in conjunction M01372694-I1 No product keyword matched | 0 | Apr 29, 2026 |
| B | 425 PARK OWNER, LLC NYC DOB building permits | 8 | Plumbing · PLUMBING MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| 0 |
| Apr 29, 2026 |
| B | ACTION 1 MAINT CONT INC NYC DOB building permits | 8 | General Construction · finish existing garage to provide storage. add rooftop deck and stairs. remove bathroom and structure on roof to address violations No product keyword matched | 0 | Apr 29, 2026 |
| B | 2575 OWNERS CORP. NYC DOB building permits | 8 | General Construction · Railing replacement as per plans. No change in use, egress, or occupancy. No product keyword matched | 0 | Apr 29, 2026 |
| B | One Source Property Management NYC DOB building permits | 8 | General Construction · SPOT POINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 0 | Apr 29, 2026 |
| B | TANKHOUSE LLC NYC DOB building permits | 8 | Construction Fence · Construction fence filed in conjunction with New Building 321598856. No product keyword matched | 0 | Apr 29, 2026 |
| B | NU CREATION MECH INC NYC DOB building permits | 8 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APT. 4A ON THE FLOOR. AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 29, 2026 |
| B | POPLE DEVELOPMENT CORP NYC DOB building permits | 8 | Sprinklers · INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 29, 2026 |
| B | MARK STROUD NYC DOB building permits | 8 | Plumbing · INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME No product keyword matched | 0 | Apr 29, 2026 |
| B | 22-63 26 ST REALTY LLC NYC DOB building permits | 8 | Plumbing · INTERIOR REMODELING OF APARTMENT 1B, RESTORE FIRESTOPPING AND DIRECT REPLACEMENT OF PLUMBING FIXTURES No product keyword matched | 0 | Apr 29, 2026 |
| B | AK REALTY GROUP NYC DOB building permits | 8 | General Construction · Herewith filed Alteration application for the vertical enlargement and conversion of the Existing (1) One Story, (1) Family Residential Building into a (2) Two Story, (2) Two Family and obtain New C of O for same. Plumbing filed under separate application No product keyword matched | 0 | Apr 29, 2026 |
| B | 1263BROADWAYLLC NYC DOB building permits | 8 | Plumbing · ALTERATION TO RENOVATE THE EXISTING 3rd FLOOR COMMERCIAL UNIT FOR A BEAUTY SALON WITH PLUMBING WORK. EXISTING USE GROUP 6. NEW, RELOCATION, AND REPLACEMENT OF NEW PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 29, 2026 |
| B | CRYDER POINT OWNERS CORP. NYC DOB building permits | 8 | General Construction · GARAGE RESTORATION INCLUDING CONCRETE PATCHING, MASONRY REPLACEMENT, CONCRETE CRACK REPAIRS, CONCRETE BEAM ENCASEMENT REPAIRS, SEALANT, REPLACEMENT AND STEEL SCRAPE, PRIME, AND PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 29, 2026 |
| B | KYRILLOS TOWER CONSTR II NYC DOB building permits | 8 | Construction Fence · APPLICATION IS FILED FOR A TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1. APPL # S01222484 NO CHANGE OF USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Apr 29, 2026 |
| B | Brooklive Management NYC DOB building permits | 8 | Mechanical Systems · FILING FOR A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 29, 2026 |
| B | SQUAN CONSTRUCTION SERVIC NYC DOB building permits | 8 | Antenna · Modification to an existing Verizon site. Replace 6 RRHs. Install 3 antennas and 2 GPS antennas.. Remove 1 equipment cabinet. Install new platform with related dunnage. Relocate 2 GPS antennas and 2 antennas. No product keyword matched | 0 | Apr 29, 2026 |
| B | UNI ASSOCIATES INC NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF SPLIT SYSTEM HVAC UNIT ON EXISTING DUNNAGE AT BLDG 3. NO CHANGE TO OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Apr 29, 2026 |
| B | MICHAEL DEMARO NYC DOB building permits | 8 | Structural · MINOR INTERIOR PARTITION CHANGES AND FINISHES THROUGHOUT 1ST AND 2ND FLOORS OF EXISTING DUPLEX IN A 2-FAMILY DWELLING. RENOVATION OF KITCHEN AND BATHROOM, ADDITION OF NEW POWDER ROOM. NEW DECK AT REAR OF FIRST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Apr 29, 2026 |
| B | BRITANNIA ST LLC NYC DOB building permits | 8 | General Construction · INTERIOR ALTERATION OF EXISTING 1ST FLOOR AND CELLAR AND STOREFRONT REPAIRS AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Apr 29, 2026 |
| B | YOUNG MENS BUDHIST ASSOCIATION NYC DOB building permits | 8 | Plumbing · FILING PLUMBING WORK AS PER PLAN. FILE TO ADDRESS ECB VIOLATION #39184132Y. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 29, 2026 |
| B | Equity Resource Investments, LLC NYC DOB building permits | 8 | Solar · Installation of 76.14 kw solar energy system on roof. No change of occupancy, use or egress. No product keyword matched | 0 | Apr 29, 2026 |
| B | FREY MANAGEMENT NYC DOB building permits | 8 | General Construction · APPLICATION FILE TO FACADE REPAIR AS BRICK POINTING AND STUCCO WORK AS PER PLAN. NO CHANGE, IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 29, 2026 |
| B | T & S INTERIORS CORP NYC DOB building permits | 8 | General Construction · FILING FOR INTERIOR ALTERATIONS AS PER PLANS. NO CHANGE IN USE , OCCUPANCY OR EGRESS. MINOR INTERIOR ALTERATION TO APT. 7-A, TO RENOVATE EXISTING BATHROOMS AND BEDROOMS PER PLAN. No product keyword matched | 0 | Apr 29, 2026 |
| B | BTO VENTURES INC NYC DOB building permits | 8 | Sign · NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN REPLACING SIGN FILED UNDER JOB# S01174760 - IN PROPERTY LINES - EXPRESS AUTO SPA CAR WASH. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 29, 2026 |
| B | AIRE TECH LLC NYC DOB building permits | 8 | General Construction · Fire damaged repairs &restoration to extg. Basement, 1st Floor& Attic Floor interiors in Existing 2 Story 1Family Dwelling due to building fire on 12-24-2025. Remove&replace all fire,smoke& water damaged interiors, Restore all gyp.bd.wall & floor finishes No product keyword matched | 0 | Apr 29, 2026 |
| B | CEDRIC BATTLE NYC DOB building permits | 8 | Plumbing · This Project is filed for Plumbing work in conjunction with Alt-2 Application # Q00966668 for fire repair, replace ex Boiler oil burner, direct replace Ex HWH, no change of use egress or occupancy No product keyword matched | 0 | Apr 29, 2026 |
| B | SOUTHERN 634 LLC NYC DOB building permits | 8 | General Construction · HEREBY FILING EXTERIOR FACADE WORK SUBSEQUENT TO THE FISP REPORT FILING NUMBER TR6-912132-9C-A1 AS PER PLANS No product keyword matched | 0 | Apr 29, 2026 |
| B | MARVIN'S GOURMET DELI INC NYC DOB building permits | 8 | Mechanical Systems · Filing to install the Deli kitchen hood and ductwork as per plans. No product keyword matched | 0 | Apr 29, 2026 |
| B | Carx.motors.lnc NYC DOB building permits | 8 | General Construction · INSTALLATION OF ALUMINUM COMPOSITE PANEL (ACM) FACADE SYSTEM OVER EXISTING MASONRY WALL; NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 29, 2026 |
| B | MTK CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · 1st Floor - Extend existing master bathroom to add a new standing shower. 2nd Floor - Convert an exiting closet into a stacked washer and Electric Dryer Closet. No product keyword matched | 0 | Apr 29, 2026 |
| B | BLVCK AUTOSPA LLC NYC DOB building permits | 8 | Structural · Filing structural two openings inside the existing one story commercial building in interior bearing walls first floor. No change in use, egress, bulk, and/or occupancy. No product keyword matched | 0 | Apr 29, 2026 |
| B | MYRTLE ASSETS, LLC NYC DOB building permits | 8 | Boiler Equipment · REPLACE OIL FIRED BOILER. No product keyword matched | 0 | Apr 29, 2026 |
| B | NEW YORK INTERNATIONAL BUILDERS NYC DOB building permits | 8 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. No product keyword matched | 0 | Apr 29, 2026 |
| B | KSH LAUNDRY INC NYC DOB building permits | 8 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - SADBOYS WHOLESALE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 29, 2026 |
| B | Dr. Mesa NYC DOB building permits | 8 | Sprinklers · Modifications to the existing Plumbing and Sprinkler systems on the 5th floor. No change inoccupancy, use or egress. No product keyword matched | 0 | Apr 29, 2026 |
| B | RANSD DESIGN INC NYC DOB building permits | 8 | General Construction · removal of non-bearing partition. window replacement. install built in cabinets. No product keyword matched | 0 | Apr 29, 2026 |
| B | AN MEI REALTY INC NYC DOB building permits | 8 | Plumbing · SUBSEQUENT FILING PLUMBING WORK. INSTALL WATER HEATERS AND A BATHROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Apr 29, 2026 |
| B | ASTOR PLACE CONDOMINIUM NYC DOB building permits | 8 | Structural · Temporary shoring of the 20th-floor slab. No product keyword matched | 0 | Apr 29, 2026 |
| B | THE HAMILTON GROUP NYC DOB building permits | 8 | Antenna · Verizon: Removal/relocation/installation of antennas, RRH units, GPS and antenna kickbacks on the roof. Remove/install cabinets on new steel platform with ships ladder on the roof. All work in compliance with TPPN 5/98. No change in egress/use/occupancy. No product keyword matched | 0 | Apr 29, 2026 |
| B | TISHMAN SPEYER PROPERTIES NYC DOB building permits | 8 | Sprinklers · SPRINKLER WORK FOR MODIFICATION OF 1ST FL GALLERY AND PACKAGING/PAYMENT AREAS. NO CHANGE OF EGRESS, USE OR OCCUPANCY IS INVOLVED. No product keyword matched | 0 | Apr 29, 2026 |
| B | NEW YORK REALTY MANAGEMENT NYC DOB building permits | 8 | Antenna · Modification of existing VERIZON site. Replace 2 antennas, install 2 antennas, replace 4 RRH units, replace 2 OVPs, install new steel platform with 3 equipment cabinets, and install 2 GPS units on the roof. No product keyword matched | 0 | Apr 29, 2026 |
| B | Milton Derienzo CPA NYC DOB building permits | 8 | Plumbing · Replace approximately 35' of 1 1/4 gas riser at cellar,3 ex. gas meter bars with new ones,3/4gas riser from cellar to 1, 2nd and 3rd floors with new ones, perform gas integrity test as per national grid request. No change to existing use group or egress No product keyword matched | 0 | Apr 29, 2026 |
| B | TOSIC CONSTRUCTION CORP NYC DOB building permits | 8 | General Construction · Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress. No product keyword matched | 0 | Apr 29, 2026 |
| B | RAFIQUL ANWAR DBA: BENGAL CONTRACTI NYC DOB building permits | 8 | General Construction · FACADE REPAIR WHICH INCLUDES BROWNSTONE REPAIR @ EXPOSURE 1. SIDEWALK SHED FILED UNDER A SEPARATE APPLICATION. No product keyword matched | 0 | Apr 29, 2026 |
| B | GRANDEUR HILLS GROUP INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AND NEW WINDOWS TO EXISTING 2 STORY SINGLE FAMILY HOME. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Apr 29, 2026 |
| B | JOY CHURCH D.L.C.F NYC DOB building permits | 8 | General Construction · Propose general construction to repair water infiltration into an existing place of worship on cellar floor all as per plans filed herewith. No change in use, occupancy, or egress under this application. No product keyword matched | 0 | Apr 29, 2026 |
| B | ERGO AIR MECHANICAL INC NYC DOB building permits | 8 | Mechanical Systems · HEREWITH FILING ALTERATION FOR EXIST. TWO STORY ONE FAMILY RESIDENTIAL DWELLING INCLUDING GC, MS AND PL WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Apr 29, 2026 |
| B | ETOILE NYC DOB building permits | 8 | Sprinklers · INSTALL TEMPORARY CORE SPRINKLER PROTECTION AND REMOVE EXISTING SPRINKLERS AS PER PLANS. No product keyword matched | 0 | Apr 29, 2026 |
| B | LOPEZ MATOS CONTRUCTION I NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION AT APT F34 AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Apr 29, 2026 |
| B | SOLAS ELECTRICAL CONTRACT NYC DOB electrical permits | 8 | new lighting and outlets No product keyword matched | 0 | Apr 29, 2026 |