Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | FLUSHINGPER LLC NYC DOB building permits | 8 | General Construction · 1ST FLOOR EXISTING BATHROOM PARTITIONS AND EXISTING STORAGE AND EXISTING OFFICE AREAS REMOVED AS PER PLANS IN CONJUNCTION WITH MECHANICAL APPLICATION# B01088385-I1 & PLUMBING APPLICATION# B01088385-S1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B |
| CROWN RETAIL SERVICES NYC DOB building permits |
| 8 |
Mechanical Systems · FILING HEREWITH THE MECHANICAL WORK RELATED TO THE INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OUR USE. No product keyword matched |
| 0 |
| May 1, 2026 |
| B | ROCK SOLID LANDSCAPE AND NYC DOB building permits | 8 | General Construction · APPLICATION IS FILED FOR EXTERIOR ALTERATION TO EXISTING HOUSE ON THE EXTERIOR DECK AND REAR YARD WITH THE INSTALLATION OF A POOL, POOL HEATER & FILTER ALONG WITH THE INSTALLATION OF PAVERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK AS PER PLANS. No product keyword matched | 0 | May 1, 2026 |
| B | WEST SIDE MANAGEMENT NYC DOB building permits | 8 | General Construction · REMODEL APT PHF ON THE FOURTH FLOOR AND INCORPORATE PORTION OF PENTHOUSE WITH APT PHF. CHANGE OF OCCUPANCY FILED UNDER ALT 1 # 104057501. NO CHANGE IN USE, EGRESS OR OCCUPANCY ON THIS APPLICATION. No product keyword matched | 0 | May 1, 2026 |
| B | VINCENT CICALA NYC DOB building permits | 8 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | EB NYC DOB building permits | 8 | Plumbing · New plumbing and sprinkler equipment installation No product keyword matched | 0 | May 1, 2026 |
| B | 1701 GATES AVENUE LLC NYC DOB building permits | 8 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01371474 No product keyword matched | 0 | May 1, 2026 |
| B | THE SHED INC,NYC NYC DOB building permits | 8 | General Construction · Temporary structures for for Frieze Art Fair in the Shed. Removed at the end of the programing. No changes to existing structures, use or egress No product keyword matched | 0 | May 1, 2026 |
| B | Property Resources Corporation NYC DOB building permits | 8 | Sprinklers · Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 0 | May 1, 2026 |
| B | BROAD USA INC NYC DOB building permits | 8 | Structural · INSTALL NEW STEEL DUNNAGE FOR REPLACEMENT CHILLER ON THE ROOF, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 1, 2026 |
| B | KK MACHINE CO INC NYC DOB building permits | 8 | Plumbing · Herewith Filing Subsequent Application for Plumbing (PL) work type No product keyword matched | 0 | May 1, 2026 |
| B | Beantecost Coffee Company LLC NYC DOB building permits | 8 | Plumbing · Plumbing work for the interior fit-out for a new coffee shop as shown on submitted plans. No change in occupancy, use or egress. No product keyword matched | 0 | May 1, 2026 |
| B | DHM DESIGN & CONST. LLC NYC DOB building permits | 8 | General Construction · General Construction as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 0 | May 1, 2026 |
| B | SUTTON EQUITY LLC NYC DOB building permits | 8 | Plumbing · PLUMBING WORK FOR EXISTING STORE TO COFFEE SHOP (COTTI COFFEE) AT 1ST FLOOR. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | theater for new city NYC DOB building permits | 8 | Mechanical Systems · Replace existing AC Units with three (3) New Rooftop HVAC Units including associated ductwork, dampers and piping. No product keyword matched | 0 | May 1, 2026 |
| B | MONUMENTAL REMODELING LLC NYC DOB building permits | 8 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | Highland Care Center NYC DOB building permits | 8 | General Construction · Facade repair No product keyword matched | 0 | May 1, 2026 |
| B | 168 HAVEMEYER, REALTY, LLC NYC DOB building permits | 8 | Plumbing · MINOR REMOVAL AND RELOCATION OF EXISTING PLUMBING FIXTURES AND INSTALLATIONOF NEW PLUMBING FIXTURES. ALL WORK MUST COMPLY WITH TPPN 03/97. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | May 1, 2026 |
| B | Office of chief Medical Examiner NYC DOB building permits | 8 | Protection and Mechanical Methods · mechanical work on the 13th floor office No product keyword matched | 0 | May 1, 2026 |
| B | Milea Associates NYC DOB building permits | 8 | Mechanical Systems · REMOVE AND REPLACE EXISTING HVAC UNIT WITH NEW UNIT. NO CHANGE TO USE, OCCUPANCY AND EGRESS PROPOSED UNDER THIS APPLICATION. No product keyword matched | 0 | May 1, 2026 |
| B | BORIS FOSTER NYC DOB building permits | 8 | General Construction · REMOVE ILLEGAL PARTITIONS TO CORRECT VIOLATION #'S 39026605L & 39026592L IN EXISTING TWO FAMILY HOUSE.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 0 | May 1, 2026 |
| B | THE BOWERY HOTEL NYC DOB building permits | 8 | Boiler Equipment · INSTALL NEW BOILERS WITH NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | HUNG YIP CONTRACTORS INC NYC DOB building permits | 8 | General Construction · GENERAL RENOVATION OF COFFEE SHOP WITH REPAIRING CEILING, PARTITION, AND FLOOR TILES AND PAINTING AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | MAHARAJ A FOOD INC. NYC DOB building permits | 8 | Construction Fence · Exterior Construction fence along frontage of the property. No product keyword matched | 0 | May 1, 2026 |
| B | BUDDY WARREN HOME INC NYC DOB building permits | 8 | General Construction · HERWITH FILING TO COMBINE APTS ON FLRS 1, 2 AND 9 UNDER THIS APPLICATION. ALSO FILING TO CORRECT THE # OF APARTMENTS ON VARIOUS FLOORS BASED ON THE ALT 2 APT COMBINATIONS COMPLETED PER TPPN0397. No product keyword matched | 0 | May 1, 2026 |
| B | YOUNG FISH NYC DOB building permits | 8 | General Construction · INSTALLATION OF A NEW AWNING ON THE EXISTING BUILDING AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | ROOSEVELT AVENUE WOODSIDE LLC NYC DOB building permits | 8 | Sign · INSTALL EXTERIOR ILLUMINATED WALL SIGN (THE SMILIST) No product keyword matched | 0 | May 1, 2026 |
| B | 76 ainslie opco NYC DOB building permits | 8 | General Construction · APPLICATION FILED TO REMOVE OUTDOOR PLYWOOD ENCLOSURE INSTALLED DURING COVID 19 AND TO RESOLVE ECB VIOLATION # 39142844R. SEPARATE ELECTRICAL APPLICATION WILL BE FILED TO RESOLVE ECB VIOLATION # 39142845Z No product keyword matched | 0 | May 1, 2026 |
| B | SPYDER WINDOW CLEANING IN NYC DOB building permits | 8 | Suspended Scaffold · Suspended Scaffold Installation for Facade Restoration and Inspection No product keyword matched | 0 | May 1, 2026 |
| B | THE ALGONQUIN HOTEL NYC DOB building permits | 8 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | May 1, 2026 |
| B | Pinpoint Management Group Inc. NYC DOB building permits | 8 | Plumbing · FILE PLUMBING WORK TO REMOVE OIL TANK, OIL BOILER AND INSTALL NEW BOILER,HWH AS PER PLAN. THIS APPLICATION IS FILED TO SUPERSEDE LAA 301844057. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | NY CITY DISCOUNT NYC DOB building permits | 8 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 1, 2026 |
| B | KYL DESIGNS INC NYC DOB building permits | 8 | Construction Fence · EIGHT FEET HEIGHT TEMPORARY CONSTRUCTION FENCE INSTALLATION BY PLYWOOD AND 4X4 WOODEN POST INSIDE PROPERTY LINE AS PER PLAN. No product keyword matched | 0 | May 1, 2026 |
| B | WESTERN WATERPROOFING CO. INC. DBA NYC DOB building permits | 8 | Protection and Mechanical Methods · INSTALLATION OF (2) TEMPORARY SHANTIES AS PER DWGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | May 1, 2026 |
| B | ALLIANCE CONTRACTING GRP NYC DOB building permits | 8 | General Construction · Interior renovation of existing apartment #'s 805, 1310, 1402, 1601 as per plan. New finishes, painting as per plan. No change to use, egress or occupancy under this application. No product keyword matched | 0 | May 1, 2026 |
| B | Secretary NYC DOB building permits | 8 | Mechanical Systems · REMOVAL OF EXISTING FAN COIL. INSTALL NEW AIR CONDITIONING SYSTEM AND RELATED DUCTWORK FOR BO7 AND B52 CLASSROOM. No product keyword matched | 0 | May 1, 2026 |
| B | EH ELITE BUILDERS LLC NYC DOB building permits | 8 | General Construction · Interior renovation and rear window and door replacement on ground floor apartment. No change of use, egress, or occupancy No product keyword matched | 0 | May 1, 2026 |
| B | ESCO DEVELOPMENT LLC NYC DOB building permits | 8 | Construction Fence · ERECT 290 LF OF CONSTRUCTION FENCE TO ENCLOSE SITE No product keyword matched | 0 | May 1, 2026 |
| B | JAG-ONE PT NYC DOB building permits | 8 | Sprinklers · RELOCATE EXISTING SPRINKLER HEADS TO CONFORM TO NEW DROP CEILING PANELS AND HEIGHT. No product keyword matched | 0 | Apr 30, 2026 |
| B | RBA DEVELOPERS LLC NYC DOB building permits | 8 | Plumbing · Removal of gas cooking equipment, gas piping, plumbing fixtures and components installed under application #200787853. No product keyword matched | 0 | Apr 30, 2026 |
| B | ADAM AMERICA NYC DOB building permits | 8 | Sprinklers · INTERIOR RENOVATION ASSOCIATED WITH THE SPRINKLER SCOPE. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Apr 30, 2026 |
| B | Goldmere Property LLC NYC DOB building permits | 8 | Plumbing · INSTALL NEW PLUMBING FIXTURES AS PER PLAN. THERE IS NO CHANGES OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN. No product keyword matched | 0 | Apr 30, 2026 |
| B | 2014 41ST TMG LLC NYC DOB building permits | 8 | Plumbing · THIS APPLICATION FILED TO INSTALL PLUMBING FIXTURES AS PER PLANS. No product keyword matched | 0 | Apr 30, 2026 |
| B | PROPERTY MANAGEMENT AFFILIATES LLC NYC DOB building permits | 8 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Apr 30, 2026 |
| B | NODE ARCHITECTURE, ENGINEERING, CON NYC DOB building permits | 8 | Structural · Structural work to be performed for New 4 Story Building as per plans. Filed in conjunction with NB Application # 210179581. No product keyword matched | 0 | Apr 30, 2026 |
| B | METROPOLITAN CONSTRUCTION NYC DOB building permits | 8 | Construction Fence · CONSTRUCTION FENCE FILED TO PERFORM MINOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Apr 30, 2026 |
| B | 20166 TENANTS CORP. NYC DOB building permits | 8 | Mechanical Systems · Relocate existing boiler within boiler room, Reconnect boilers to existing breeching upstream of draft fan, and relocate an existing supply air fan within the boiler room. No product keyword matched | 0 | Apr 30, 2026 |
| B | CONSTRUCTION PARTNERS CORP. NYC DOB building permits | 8 | General Construction · Interior renovation for the combination of apartments 3A and Apt 3B. Work includes removal of bearing partition and tile replacement, as per TPPN3/97. No change to use, egress, or occupancy is involved. No product keyword matched | 0 | Apr 30, 2026 |
| B | DR. BUZZ MEDICAL P.C. NYC DOB building permits | 8 | General Construction · Application is being filed interior renovation at the subject premises No product keyword matched | 0 | Apr 30, 2026 |
| B | 226 PUTNAM, LLC NYC DOB building permits | 8 | Mechanical Systems · INSTALL NEW SPLIT UNIT SYSTEM TO 1ST THRU 4TH FLOOR AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 0 | Apr 30, 2026 |