Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | PRESENTATION OF THE BLESSED VIRGIN NYC DOB building permits | 8 | Plumbing · REPLACE PLUMBING FIXTURES WITH NEW (1 LAV, 1 WC); INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 WC, 3 F.D., 1 SINK) AT 1ST FLOOR. No product keyword matched | 0 | May 5, 2026 |
| B | Mr. Crunchy |
| 8 |
General Construction · DUE TO NEW TENANT EXISTING INTERIOR RENOVATIONWORK INCLUDING KITCHEN SETUP REPAIR .WORK WILL TAKEPLACE ONLY AT 1ST FLOOR AND CELLAR . NO CHANGE USEEGRESS OR OCCUPANCY No product keyword matched |
| 0 |
| May 5, 2026 |
| B | AIMS DESIGN & CON SRV LLC NYC DOB building permits | 8 | General Construction · Rear extension to cellar,1st-floor, and 2nd floor, and interior renovation for an existing one-family house. C of O to be obtained. No product keyword matched | 0 | May 5, 2026 |
| B | 7322 nineteen 88 LLC NYC DOB building permits | 8 | Plumbing · To file PL plumbing work type in conjunction with DOB Now Build application job#B01389730. No change in use, egress or occupancy under this application. No product keyword matched | 0 | May 5, 2026 |
| B | 718 HOME IMPROVEMENT INC NYC DOB building permits | 8 | Structural · THIS STRUCTURE APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION RO ADD STRUCTUR WORK No product keyword matched | 0 | May 5, 2026 |
| B | TPA V, LLC NYC DOB building permits | 8 | Antenna · Modification to existing Verizon site on roof. Replace 4 RRH units, install 2 new antennas, relocate 2 antennas, install 2 new GPS antennas, remove 1 equipment cabinet, and install new platform with related cabinets. No change in use, egress, or occupancy No product keyword matched | 0 | May 5, 2026 |
| B | FLATIRON NYC LLC NYC DOB building permits | 8 | Plumbing · Subsequent filing for cap and removal, and replacement of plumbing fixtures as per plans submitted. No product keyword matched | 0 | May 5, 2026 |
| B | Wonko Realty Corp. NYC DOB building permits | 8 | General Construction · GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | 252 REALTY MANAGEMENT NYC DOB building permits | 8 | General Construction · PROPOSED INTERIOR RENOVATION TO RESTORE PART OF BASEMENT FLOOR TO LEGAL CONDITIONS,REMOVAL OF EXISTING PARTITIONS AND NEW PARTITION WORK, NEW FLOOR SLAB TO REPLACE EXISTING AND FINISHES. ECB VIOLATION # 35680611Z. NO CHANGE TO USE, OCCUPANCY OR BULK. PLUM No product keyword matched | 0 | May 5, 2026 |
| B | GRAND CENTRAL 888 INC NYC DOB building permits | 8 | General Construction · JOB IS FILED TO COMPLETE INACTIVE DOB BIS JOB# 123289921 TO GET SIGN OFF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | 2234 OCEAN OWNERS CORP NYC DOB building permits | 8 | General Construction · GENERAL CONSTRUCTION FOR EXTERIOR REPAIRS AT NORTH AND EAST FACADES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | HOMELINE CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · EXTERIOR WORK MASONRY OPENING FOR INSTALLATION OF PTAC SLEEVE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | Pleasantview Association NYC DOB building permits | 8 | General Construction · SCOPE OF WORK LIMITED TO PARAPET REPL., MISC. BRICK REPAIR & POINTING, STONE REPAIR, REPAIR & REPLACEMENTS OF LINTELS & SILLS, PER RULE 1-RCNY 101-14 No product keyword matched | 0 | May 5, 2026 |
| B | ML BRIDGE NYC DOB building permits | 8 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. No product keyword matched | 0 | May 5, 2026 |
| B | 181 CANDY DELI NYC DOB building permits | 8 | Mechanical Systems · INSTALLATION OF NEW STAINLESS STEEL HOOD WITH EXHAUST DUCT IN EXISTING DELI/GROCERY STORE.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 0 | May 5, 2026 |
| B | Mary Deli Grocery Corp NYC DOB building permits | 8 | Mechanical Systems · FILING TO LEGALIZE THE WORK WITHOUT PERMIT UNDER VIOLATION 39170119M, TO INSTALL DELI KITCHEN HOOD AND DUCTWORK AS PER PLANS. NO CHANGE IN USE, EGRES OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | SI Richmond LLC NYC DOB building permits | 8 | Mechanical Systems · DIRECT REPLACEMENT OF REFRIGERATION CONDENSER UNIT RECONNETION TO EXISTING REFRIGERATION LINES AND POWER SUPPLY & SUPPORTS No product keyword matched | 0 | May 5, 2026 |
| B | LIN'S MANAGEMENT CO LLC NYC DOB building permits | 8 | General Construction · CONVERT FIRST FLOOR EXISTING ATM ROOM TO CLOSET (122 S.F.)UPDATES TO SEATING PLAN. FILED IN CONJUNCTION WITH JOB #421011176 No product keyword matched | 0 | May 5, 2026 |
| B | NTS CONTRACTORS CORP NYC DOB building permits | 8 | Mechanical Systems · Installation of AC units, ductwork and associated components, as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 0 | May 5, 2026 |
| B | SU ARCHITECT, P.C NYC DOB building permits | 8 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | 7801 13 AVE REALTY CORP NYC DOB building permits | 8 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - EXOTIC FINS GALLERY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | INM ARCHITECTS PC NYC DOB building permits | 8 | Suspended Scaffold · Installation of outrigger & hoist for facade repair & inspection. No product keyword matched | 0 | May 5, 2026 |
| B | HIM & WILMAN HOME IMPROVE NYC DOB building permits | 8 | General Construction · GENERAL CONSTRUCTION (GC) WORK FOR INT. RENOVATION OF THE 1ST FL. APT WITHIN THE EXISTING 2-FAMILY (& FOUR (4) FURNISHED ROOMS) DWELLING, INCLUDING PARTITIONS & COSMETIC FINISHES. PL WORK FILED SEPARATELY THRU DOBNOW. NO CHANGE TO EGRESS, USE OR OCC. No product keyword matched | 0 | May 5, 2026 |
| B | M.A.R. CONSULTANTS.COM NYC DOB building permits | 8 | Plumbing · REGISTER HOT WATER HEATER AND ASSOCIATED GAS PIPING TO HEATING APPLIANCES AS PER PLANS. FILED IN CONJUNCTION WITH LAA# M01310202-I1-LA.NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | May 5, 2026 |
| B | GHM PROPERTY GROUP LLC NYC DOB building permits | 8 | Plumbing · INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | May 5, 2026 |
| B | MAHERA NYC DOB building permits | 8 | Structural · Structural filing in conjunction with application # B00875741-I1 to comply with ECB violation #35175973Z No product keyword matched | 0 | May 5, 2026 |
| B | Teziutlan Brunch&Grill NYC DOB building permits | 8 | Plumbing · INSTALLATION OF COMMERCIAL PLUMBING FIXTURES FOR EXISTING RESTAURANT. ALL WORK PER PROPOSED PLUMBING PLAN SUBMITTED No product keyword matched | 0 | May 5, 2026 |
| B | 93 ATLANTIC AVENUE LLC NYC DOB building permits | 8 | Sign · ILLUMINATED NON ADVERTISING ACCESSORY PROJECTING BUSINESS SIGN ON WALL. SIGN WORDING: 69 No product keyword matched | 0 | May 5, 2026 |
| B | GENOVESE FAMILY ENTERPRISES, LLC NYC DOB building permits | 8 | Mechanical Systems · HVAC DUCT MODIFICATIONS FOR GROUND FLOOR COMMERCIAL SPACE. No product keyword matched | 0 | May 5, 2026 |
| B | ACADIA CONTRACTING INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APT 69 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | May 5, 2026 |
| B | 20E73 ASSOCIATES LLC NYC DOB building permits | 8 | Plumbing · plumbing work associated with the townhouse repair due to fire damages as shown on plans filed herewith. no change to use, egress, or occupancy. No product keyword matched | 0 | May 5, 2026 |
| B | 508072188 NYC DOB building permits | 8 | Construction Fence · HEREWITH FILING FOR REQUISITE TEMPORARY CONSTRUCTION FENCE AS PER SUBMITTED PLANS. No product keyword matched | 0 | May 5, 2026 |
| B | CROSS COUNTY SAVINGS BANK NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF EXISTING HVAC UNIT AT ROOF. NO CHANGE TO USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | May 5, 2026 |
| B | DEBOCCIA ELECT CONST CORP NYC DOB electrical permits | 8 | this is an upgrade to HVAC systems in order to update their systems for the 2019 LL97 No product keyword matched | 0 | May 5, 2026 |
| B | VOLTAGE ELECTRICAL SERV NYC DOB electrical permits | 8 | HIRED BY THE OWNER TO CLOSE OUT 2 EXISTING APPLICATIONS # Y137499 AND Y130228 No product keyword matched | 0 | May 5, 2026 |
| B | LEIGH ELECTRICAL INC NYC DOB electrical permits | 8 | General Wiring Apartment C04 No product keyword matched | 0 | May 5, 2026 |
| B | JJD ELEC'L SERV. & INST C NYC DOB electrical permits | 8 | Apartment 7A Renovation No product keyword matched | 0 | May 5, 2026 |
| B | TICKET BUSTERS INC. NYC DOB building permits | 8 | Structural · PROPOSED INTERIOR STRUCTURAL REPAIR FOR THE CELLAR, SUB-CELLAR AND 1ST FLOOR, NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | May 4, 2026 |
| B | GRG RESTORATION & SOLUTIO NYC DOB building permits | 8 | Earth Work · FOUNDATION AND EARTHWORK WORK RELATED TO EXISTING BUILDING ALTERATION M01153426-I1. No product keyword matched | 0 | May 4, 2026 |
| B | SNBD ENTERPRISES LLC NYC DOB building permits | 8 | Construction Fence · FILING PAA TO AMEND PLANS. LOCATION OF FENCE TO BE CHANGED AS PER NEIGHBOR AGREEMENT AND ADDING DOUBLE SWINGING DOOR TO EXP 1 No product keyword matched | 0 | May 4, 2026 |
| B | 29 HERKIMER ST LLC NYC DOB building permits | 8 | Plumbing · Application filed for plumbing modifications/additions. Work includes removing gas fired equipment in cellar and installing new elecric water heater and PL fixtures along with new PL fixtures in the Basement, 1st, 2nd and 3rd floors as per plans. No product keyword matched | 0 | May 4, 2026 |
| B | INTER-NOVA CONTRACTING CO NYC DOB building permits | 8 | Earth Work · PROPOSED FIRST FLOOR HORIZONTAL ENLARGEMENT OF EXISTING ONE STORY ONE FAMILY DWELLING. No product keyword matched | 0 | May 4, 2026 |
| B | NEW PLBG & HTG CORP NYC DOB building permits | 8 | Plumbing · MODIFICATION TO EXIST. PLUMBING PER PLANS FILED HEREWITH. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY, OR FLOOR AREA. No product keyword matched | 0 | May 4, 2026 |
| B | THE KOREAN FIRST PRESBYTERIAN CHURC NYC DOB building permits | 8 | Plumbing · The previous legalization application (#Q01297021-I1) incorrectly indicated the gas pipe size. However, a legalization application cannot be filed as a PAA. This application is submitted solely to correct the previously stated gas pipe size. No product keyword matched | 0 | May 4, 2026 |
| B | NADA INC NYC DOB building permits | 8 | General Construction · NEW BUILDING PROPOSED 2 FAMILY 2 STORY AND FLOOD ZONE GROUND LEVEL RESIDENTIAL BUILDING No product keyword matched | 0 | May 4, 2026 |
| B | Pacific Auto NYC DOB building permits | 8 | Sprinklers · PLUMBING SCOPE OF WORK FOR ONE ADA BATHROOM RENOVATION AND TWO NEW BATHROOMS ONE FOR FIRST FLOOR AND MEZZANINE LEVEL. GAS METER UPGRADE AND GAS PIPING FOR SPRAY BOOTH HEATING UNIT. NEW SPRINKLER RPZ AND SPRINKLER PIPING FOR 7 NEW SPRINKLER HEADS. No product keyword matched | 0 | May 4, 2026 |
| B | 37 S Oxford LLC NYC DOB building permits | 8 | Solar · INSTALL SOLAR PV ON EXISTING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | May 4, 2026 |
| B | DVE CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE UNIT 1N ON 1ST FLOOR IN EXISTING BUILDING: NEW NON-BEARING INTERIOR PARTITIONS, NEW INTERIOR FINISHES. NEW MILLWORK. NO CHANGE TO OCCUPANCY, EGRESS OR USE. NO CHANGE TO BUILDING STRUCTURE, FOOTPRINT OR FAR. No product keyword matched | 0 | May 4, 2026 |
| B | DYNASTY MEAT CORP NYC DOB building permits | 8 | Plumbing · REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS No product keyword matched | 0 | May 4, 2026 |
| B | 32 BELERIAND LLC NYC DOB building permits | 8 | Sprinklers · MODIFY WET SPRINKLER SYSTEM FOR COVERAGE ON THE ENTIRE PROJECT. No product keyword matched | 0 | May 4, 2026 |