Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | METROPOLITAN CONSTR CORP NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 0 | May 6, 2026 |
| B | 274 SULLIVAN PL LLC NYC DOB building permits | 8 |
General Construction · Proposed seven story + cellar mixed use building. No product keyword matched |
| 0 |
| May 6, 2026 |
| B | GISELLE ENTERPRISES NYC DOB building permits | 8 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - AUTOPHOTO. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 6, 2026 |
| B | 66 BERKELEY LLC NYC DOB building permits | 8 | Plumbing · Plumbing work to include the replacement, relocation and addition of new fixtures associated with renovation of building as per plans filed herewith. No product keyword matched | 0 | May 6, 2026 |
| B | 1080 OCEANVIEW LLC NYC DOB building permits | 8 | General Construction · Renovation of kitchen and bathroom in apartment 3E on 3rd floor to address violations 39171685L & 39171686N; No change in C of O. No product keyword matched | 0 | May 6, 2026 |
| B | 236 RIVERDALE REALTY LLC NYC DOB building permits | 8 | Mechanical Systems · Application file to obtain EUP card for existing HVAC unit at roof of existing commercial space and address FDNY Violation No. 01475903L, No change in use occupancy or egress No product keyword matched | 0 | May 6, 2026 |
| B | KEW MOTOR INN NYC DOB building permits | 8 | Mechanical Systems · Replace existing cooling tower and chiller system to new air cooled condensing units and new chillers system. Total cooling capacity are 80 tons No product keyword matched | 0 | May 6, 2026 |
| B | PREMIER INTERIORS INC NYC DOB building permits | 8 | General Construction · INTERIOR RENOVATION OF APT 8E, PREVIOUSLY COMBINED FROM 7E, 8E, AND 8F UNDER ALT 984-87 & M00537623 - NEW KITCHEN AND MINOR PARTITION WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | May 6, 2026 |
| B | BOROUGH OF MANHATTAN COMMUNITY COLL NYC DOB building permits | 8 | General Construction · Installation of temp tent and prod equip, no alt to exist structures for Annual Tribeca Film Festival. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion No product keyword matched | 0 | May 6, 2026 |
| B | 311-313 WILSON PROPERTIES LLC NYC DOB building permits | 8 | General Construction · ALTERATION TYPE II FILED ONLY TO CURE ECB VIOLATION #39158735Y TO REPAIR PARTIAL CELLAR CEILING No product keyword matched | 0 | May 6, 2026 |
| B | SRL ASSOCIATES NYC DOB building permits | 8 | Suspended Scaffold · INITIAL CD5 INSPECTION & FISP REPAIRS PER PLANS NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 6, 2026 |
| B | BRONX CITY NYC DOB building permits | 8 | Sprinklers · ALL PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT#220710586. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 6, 2026 |
| B | Ebenezer Urban Ministry Center NYC DOB building permits | 8 | General Construction · Interior renovation and conversion of a daycare to a food pantry for the basement and 1st floor (No change to the existing 2nd floor). No exterior work. No product keyword matched | 0 | May 6, 2026 |
| B | 3755 E Tremont Ave Real Estate Inc NYC DOB building permits | 8 | Mechanical Systems · DIRECT REPLACEMENT OF ONE 4-TON, ONE 6-TON, ONE 8-TON, AND ONE 10-TON AIR-COOLED ROOFTOP PACKAGED UNIT ON EXISTING ROOF CURBS. RECONNECT EXISTING GAS PIPING TO NEW ROOFTOP UNITS BY OTHER TRADES. CERTIFICATE OF COMPLIANCE REQUIRED FOR NEW HVAC EQUIPMENT. No product keyword matched | 0 | May 6, 2026 |
| B | TEKTON ENTERPRISE INC NYC DOB building permits | 8 | General Construction · PROPOSED 1 STORY HORIZONTAL EXTENSION OF EXISTING.BUILDING @REARNO CHANGE IN USE OF OCCUPANCY OR EGRESS No product keyword matched | 0 | May 6, 2026 |
| B | Madison Apothecary NYC DOB building permits | 8 | General Construction · PROPOSED TO RENOVATE THE 1ST FLOOR RETAIL STORE, WORK WILL INCLUDE: NEW PARTITIONS, FINISHES, CABINETS, CASEWORK & STORE FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 6, 2026 |
| B | atria 2000 ass llc NYC DOB building permits | 8 | Construction Fence · Construction Fence. No change to use, occupancy or eggress. No product keyword matched | 0 | May 6, 2026 |
| B | HWY BAGELS, LLC NYC DOB building permits | 8 | Solar · Installation of solar panels, rooftop, grid tied, railed, 52 modules, 21.32 KW No product keyword matched | 0 | May 6, 2026 |
| B | JAMES RICH NYC DOB building permits | 8 | Mechanical Systems · REPLACE AIR CONDITIONING SYSTEM No product keyword matched | 0 | May 6, 2026 |
| B | EURO GROUP DESIGN GROUP NYC DOB building permits | 8 | General Construction · General construction proposed in existing unit #6C on the 6th floor. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy. No product keyword matched | 0 | May 6, 2026 |
| B | AAH CONTRUCTION CORP NYC DOB building permits | 8 | Curb Cut · PROPOSED ENLARGEMENT OF EXISTING CURB CUT TO 24'-2 No product keyword matched | 0 | May 6, 2026 |
| B | NEW YORK SIGNS & AWNINGS, NYC DOB building permits | 8 | General Construction · Provide Business Awning with business sign under 12 sf and sign lettering under 12 height. No product keyword matched | 0 | May 6, 2026 |
| B | C N M CONSTRUCTION INC NYC DOB building permits | 8 | General Construction · RENOVATION WORK AT APT 6F (6TH FLR) INCLUDING REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING, NEW FINISHES & RELATED CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 6, 2026 |
| B | 776 East 161 St., LLC NYC DOB building permits | 8 | Plumbing · 2ND FL: REPLACE 1 TUB, 1 LAV, 1 WC, 1 KITCHEN SINK, & 1 GAS RANGE IN EACH OF THE 2 APTS. 1ST FL: REPLACE 1 WC & 1 LAV, REMOVED ALL GAS PIPING, COMMERCIAL SINKS & COOKING EQUIPMENTS OF PRIOR RESTAURANT. CEL: REMOVED 1 BOILER #99487, REPL 1 HWH, ADD 1 HWH No product keyword matched | 0 | May 6, 2026 |
| B | MO MO REALTY LLC NYC DOB building permits | 8 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 6, 2026 |
| B | STEERING HOUSE CONSTRUCTION, LLC NYC DOB building permits | 8 | General Construction · Installation of sub-slab depressurization system. No change in use, egress, or occupancy. No product keyword matched | 0 | May 6, 2026 |
| B | SIMPLE REALTY LLC NYC DOB building permits | 8 | Mechanical Systems · APPLICATION FILED HEREWITH TO PROPOSE MECHANICAL SYSTEMS WITH NEW AIR CONDITIONING AND CONDENSING UNITS AND NEW DUCTS. No product keyword matched | 0 | May 6, 2026 |
| B | HOMEZ ONE CORP NYC DOB building permits | 8 | Structural · CONSTRUCTION OF A HORIZONTAL EXTENSION AT THE 1ST FLOOR LEVEL AT THE REAR OF THE EXISTING BUILDING FILED IN CONJUNCTION WITH ALT II #321975831 No product keyword matched | 0 | May 6, 2026 |
| B | M F ELEC'L SVC CO., INC NYC DOB electrical permits | 8 | General wiring of Chipotle Store No product keyword matched | 0 | May 6, 2026 |
| B | KANGAROO ELEC'L CONT.INC. NYC DOB electrical permits | 8 | This permit application is to supercede permit app. X00125108 due to license holder inactive. Installation and wiring of breaker panels, refrigeration equipment, lighting, and receptacles in warehouse, loading area, walk in coolers, walk-in storage freezer, and offices No product keyword matched | 0 | May 6, 2026 |
| B | JC SANTANA CONTRACTING CO NYC DOB building permits | 8 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 0 | May 5, 2026 |
| B | VIOLET HOLDINGS LLC NYC DOB building permits | 8 | General Construction · ALTERATIONS OF EXISTING APARTMENT BUILDING PER PLANS. REPLACE SIDING, ROOFING AND WINDOWS WITH NEW. No product keyword matched | 0 | May 5, 2026 |
| B | TEAMWORK ENTERPRISES INC NYC DOB building permits | 8 | General Construction · EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | KDL CONSTRUCTION & DEVELOPMENT GROU NYC DOB building permits | 8 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 5, 2026 |
| B | Alliance Summit LLC NYC DOB building permits | 8 | Plumbing · Propose plumbing work of existing residential building as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | May 5, 2026 |
| B | DENHAM WOLF RES NYC DOB building permits | 8 | Construction Fence · CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | May 5, 2026 |
| B | NORTHEAST CONSTRUCTION/RE NYC DOB building permits | 8 | Mechanical Systems · Installation of mechanical system on the 2nd floor and removal of existing AC unit and related ductwork as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 0 | May 5, 2026 |
| B | Yun Home LLC NYC DOB building permits | 8 | Mechanical Systems · SUBSEQUENT FILING MECHANICAL SYSTEM WORK. INSTALL DUCTLESS SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | 166N12, LLC NYC DOB building permits | 8 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 5, 2026 |
| B | Dulce Bloom NYC DOB building permits | 8 | Plumbing · PLUMBING WORK OF EXISTING COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | MARGUERITE CONNELLY YOUR EXPEDITER NYC DOB building permits | 8 | Construction Fence · Construction permit No product keyword matched | 0 | May 5, 2026 |
| B | EFFICIENT MECHANICAL CORP NYC DOB building permits | 8 | Mechanical Systems · MODIFICATION TO MECHANICAL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | 5416 5TH AVE LLC NYC DOB building permits | 8 | Sidewalk Shed · HEAVY DUTY SWS IS REQUIRED FOR EXTERIOR REPAIRS AND TO REMOVE AND INSTALL A SIGN. SWS FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SWS SHALL COMPLY WITH CHATER 33 OF THE NYC BUILDING CODE. No product keyword matched | 0 | May 5, 2026 |
| B | FLAIR NYC INC NYC DOB building permits | 8 | General Construction · General construction work is proposed in the existing unit #10F on the 10th floor. Initial general construction, sub plumbing, and mechanical applications to be filed. All per submitted plans. No change to use, egress, or occupancy under this application. No product keyword matched | 0 | May 5, 2026 |
| B | KEVIN REALTY INC NYC DOB building permits | 8 | Plumbing · MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES. No product keyword matched | 0 | May 5, 2026 |
| B | METOLLIS CONSTRUCTION.& NYC DOB building permits | 8 | General Construction · CONVERT A 2 STORY (ZR) OR 3 STORY (BC) ONE FAMILY HOUSE DETACHED RESIDENCEWITH AN ACCESSORY ONE CAR GARAGE TO ONE FAMILY DWELLING AND AN ACCESSORY ADU LOCATED AT THE 2ND FLOOR FOR ZR OR 3RD FLOOR BC . THE MAIN ENTRANCE OF THE ADU OPENS TO THE FRONT YARD. No product keyword matched | 0 | May 5, 2026 |
| B | PATEL/SAULTER LLC NYC DOB building permits | 8 | Plumbing · PROPOSE PLUMBING & GAS WORKS FOR BATHROOM, KITCHEN WORK AT CELLAR & BASEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 5, 2026 |
| B | DITMAS OP LLC NYC DOB building permits | 8 | General Construction · INSTALL CHIMNEY LINER. No product keyword matched | 0 | May 5, 2026 |
| B | ANGEL A. GARABITO EXPEDITING NYC DOB building permits | 8 | Plumbing · Replace existing plumbing fixture with new on existing roughing No product keyword matched | 0 | May 5, 2026 |
| B | 146 Atlantic Ave. LLC NYC DOB building permits | 8 | Plumbing · Application filed to modify existing plumbing fixtures and install new plumbing fixututes in conjunction with DOB NOW JOB # B0120102-I1 As per plan. No product keyword matched | 0 | May 5, 2026 |