Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | GUARDIAN THOMAS CORP. NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION OF ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. THE ROOF PROTECTION AT THE WEST AND THE EAST NEIGHBOR'S ROOFS. No product keyword matched | 7 | Nov 5, 2026 |
| B |
| DEVELOPING NY STATE NYC DOB building permits |
| 11 |
Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched |
| 36 |
| Nov 5, 2026 |
| B | EXTRA SPACE STORAGE NYC DOB building permits | 11 | Structural · EXISTING RETAINING WALL REINFORCEMENT WITH NEW STEEL FRAMES ALONG COURTYARD LIGHTWELL AT CELLAR LEVEL. No product keyword matched | 2 | Nov 5, 2026 |
| B | 900 SENECA REALTY NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING BUILDING No product keyword matched | 3 | Nov 5, 2026 |
| B | 4 PARK AVE. ASSOCIATES LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 5, 2026 |
| B | UGB CONSTRUCTION NYC DOB building permits | 11 | Mechanical Systems · Mechanical work in conjunction with ALT CO application No product keyword matched | 4 | Nov 5, 2026 |
| B | PREET & M CONSTRUCTION NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 26 | Nov 5, 2026 |
| B | JADE EQUITIES NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION WITH PARTITIONS AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION No product keyword matched | 2 | Nov 5, 2026 |
| B | TERRA DEVELOPERS, LLC NYC DOB building permits | 11 | Support of Excavation · SOE work in conjunction with the NB application M01272711-I1 No product keyword matched | 6 | Nov 5, 2026 |
| B | PERCIBALLI INDUSTRIES INC NYC DOB building permits | 11 | Construction Fence · Installation 8' High Temporary Construction Fence No product keyword matched | 3 | Nov 5, 2026 |
| B | FA CONSTRUCTION NY INC NYC DOB building permits | 11 | General Construction · APPLICATION FILING TO ADDRESS ECB VIOLATION# 39084984X AND 39109485J FOR REAR HORIZONTAL EXTENTION AS PER PLAN FOR SINGLE FAMILY HOME . NO CHANGE OF USE, EGRESS AND OCCUPANCY UNDER THIS JOB. No product keyword matched | 3 | Nov 5, 2026 |
| B | MOSBACHER PROPERTIES GROUP, LLC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK TO REMOVE & REPLACE ROOFTOP CONDENSING UNITS SERVICING 1ST FLOOR & MEZZANINE MORTON WILLIAMS SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 5, 2026 |
| B | 2952 BRIGHTON 3RD STREET, LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF THE CONSTRUCTION FENCE IN CONJUNCTION WITH NB#320909371 No product keyword matched | 2 | Nov 5, 2026 |
| B | 781-783 ELSMERE PL NYC DOB building permits | 11 | General Construction · APPLICATION FILED HEREWITH TO ERECT A NEW EIGHT STORY + PENTHOUSE RESIDENTIAL BUILDING WITH FIFTY SIX DWELLING UNITS No product keyword matched | 12 | Nov 5, 2026 |
| B | THE WOOLWORTH BUILDING NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE FIFTH FLOOR IN CONJUNCTION WITH THE ALTERATION APPLICATION FILED UNDER JOB # M01464128-I1 (MASON TRIBECA) No product keyword matched | 8 | Nov 5, 2026 |
| B | JV FAST CONSTRUCTION LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED INSTALLATION OF TEMPORARY FENCE TO PROTECT AND SECURE THE WORK AREA, AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 4 | Nov 5, 2026 |
| B | ALLIED REALTY & DEVELOPMENT CORP. NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN APT 2A AND 4A AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 6 | Nov 5, 2026 |
| B | ASTOR TERRACE CONDOMINIUM NYC DOB building permits | 11 | General Construction · MAIN ROOF RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 5, 2026 |
| B | MODERN DESIGN, INC NYC DOB building permits | 11 | General Construction · FILING FOR A NEW PROPOSED REAR DECK TO EXISTING TWO (2) STORY AND ATTIC, TWO(2) FAMILY DWELLING UNIT BUILDING. No product keyword matched | 4 | Nov 5, 2026 |
| B | 732-692-5000 NYC DOB building permits | 11 | General Construction · MINOR CHANGES IN ALL FLOOR PLANS No product keyword matched | 1 | Nov 5, 2026 |
| B | HARMAN MANAGEMENT NYC DOB building permits | 11 | General Construction · APPLICATION FILED IN TO PROVIDE CORRECTIVE MEASURES FOR AS NOTED ON THE PERIODIC INSPECTION OF PARKING STRUCTURES REPORT. FILING TO ADDRESS ECB VIOLATIONS #37030237X, #35717055N. NO CHANGE IN USE, OCCUPANCY, EGRESS OR CONSTRUCTION CLASSIFICATION. No product keyword matched | 5 | Nov 5, 2026 |
| B | HENNAN GROUP INC NYC DOB building permits | 11 | Protection and Mechanical Methods · NEEDLE BEAM SUPPORTED OVERHEAD PROTECTION FOR NEIGHBORING PROPERTY No product keyword matched | 4 | Nov 5, 2026 |
| B | 161 West 15th Street C/o Maxwell Kates NYC DOB building permits | 11 | General Construction · PARAPET REPLACEMENT AT SECOND FLOOR REAR COURTYARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 8 | Nov 5, 2026 |
| B | AMI AND ASSOCIATES INC NYC DOB building permits | 11 | Sprinklers · Additions and Modification to existing Sprinkler system and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 6 | Nov 5, 2026 |
| B | CASSENA CARE NYC DOB building permits | 11 | Suspended Scaffold · Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. No product keyword matched | 3 | Nov 5, 2026 |
| B | B & A GREENLINE CONSTRU* NYC DOB building permits | 11 | General Construction · REMOVAL OF ILLEGAL CELLAR PARTITIONS AND RESTORATION OF CELLAR TO LEGAL CONDITION AS PER PLANS, TO ADDRESS ECB VIOLATION NUMBERS: 39190664X AND 39190665H. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCYUNDER THIS APPLICATION. No product keyword matched | 2 | Nov 5, 2026 |
| B | RECORD GROUP INC NYC DOB building permits | 11 | Mechanical Systems · Installation of rooftop HVAC equipment, kitchen exhaust ducts and fans, associated with new supermarket on ground floor. No change in egress, use or occupancy No product keyword matched | 14 | Nov 5, 2026 |
| B | PARKVIEW MANAGEMENT GROUP NYC DOB building permits | 11 | Mechanical Systems · Installation of a Type 1 kitchen exhaust hood at the first floor. No changes to egress, use or occupancy No product keyword matched | 2 | Nov 5, 2026 |
| B | CITADEL PROPERTY MANAGEMENT CORP NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD/ STAIR TOWER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 15 | Nov 5, 2026 |
| B | WATERFRONT DEVELOPERS LLC NYC DOB building permits | 11 | Construction Fence · Installing 8 Feet high construction fence in conjunction with job # B07993486 No product keyword matched | 4 | Nov 5, 2026 |
| B | EMPIRE NY INSTALLATIONS I NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 10 | Nov 5, 2026 |
| B | SIGNATURE AUDIO DESIGN LL NYC DOB building permits | 11 | General Construction · CONVERT MULTI-FAMILY TOWNHOUSE TO SINGLE-FAMILY TOWNHOUSE No product keyword matched | 10 | Nov 5, 2026 |
| B | CHILDREN'S MUSEUM OF MANHATTAN NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND CONSTRUCTION PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 5, 2026 |
| B | INNOVATIVE CONSTRUCTION & NYC DOB building permits | 11 | General Construction · ALT-1 FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR AND 2ND. FLOOR FRONT EXTENSION No product keyword matched | 4 | Nov 5, 2026 |
| B | JSRE MANAGEMENT NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL FOR Pearson fit-out AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE, OR EGRESS. No product keyword matched | 4 | Nov 5, 2026 |
| B | ZONE PLUMBING & HEATING C NYC DOB building permits | 11 | Plumbing · CAP, REMOVE PLUMBING FIXTURES & INSTALLING NEW FIXTURES ON THE 1ST FLOOR No product keyword matched | 10 | Nov 5, 2026 |
| B | SOMERAROAD INC. NYC DOB building permits | 11 | General Construction · TO BE REVIEWED BY HUB. HUB CONSULT ON 6/28/2021 WITH DAMIAN TITUS. FILING HEREWIITH FOR CONVERSION TO ONE FAMILY DWELLING AND HORIZONTAL ENLARGEMENT AS PER PLANS. NO CHANGES TO THE EXISTING PARTY WALL. No product keyword matched | 1 | Nov 5, 2026 |
| B | OMUNDSEN CONSTRUCTION COR NYC DOB building permits | 11 | General Construction · Legalize Existing 2nd Floor Interior Non-Bearing wall partitions on the original Signed Off Alteration Type 1 Application #510049608, which was constructed on an original New Building Application #500245843. No Change to Use, Egress or Occupancy. No product keyword matched | 3 | Nov 5, 2026 |
| B | JLW PROPERTIES MANAGEMENT INC. NYC DOB building permits | 11 | General Construction · Application filed to obtain a new c/o for existing buildings du to change in metes and bounds of zoning lot, Lot #52 and #51 are merged to one zoning lot. Proposed vertical extension to a 4-story residential building w/ penthouse on Lot #51. No product keyword matched | 2 | Nov 5, 2026 |
| B | STATE CONTRACTING CORP NY NYC DOB building permits | 11 | Protection and Mechanical Methods · USE OF MECHANICAL DEMOLITION EQUIPMENT AS PER PLANS. No product keyword matched | 16 | Nov 5, 2026 |
| B | GT & K CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · Resolve audit objection. No product keyword matched | 3 | Nov 5, 2026 |
| B | BSE GLOBAL NYC DOB building permits | 11 | Structural · Structural work as per plans No product keyword matched | 7 | Nov 5, 2026 |
| B | QUALITY PIPING, INC NYC DOB building permits | 11 | Plumbing · Plumbing and sprinkler specifications filed in conjunction with NB application X01388820-I1 No product keyword matched | 19 | Nov 5, 2026 |
| B | ED NYC DOB building permits | 11 | Plumbing · DISCONNECT SINK TO ACCOMMODATE WORK. REUSE, & RECONNECT THE FIXTURE AS SHOWN ON DRAWINGS. PROVIDE CW, HW AND DRAIN PIPING AS REQUIRED. No product keyword matched | 4 | Nov 5, 2026 |
| B | BLUEWATER PLBG& HTG INC NYC DOB building permits | 11 | Plumbing · #311 - Minor Plumbing work related to water restoration of existing apartment. No change to use egress or occupancy. No product keyword matched | 18 | Nov 5, 2026 |
| B | NYC-ACS NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 5, 2026 |
| B | 6 HAVEMEYER LP NYC DOB building permits | 11 | Foundation · Foundation application filed in-conjunction with the new building application. No product keyword matched | 1 | Nov 5, 2026 |
| B | SCALI CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · PROPOSED THREE (3) STORY & CELLAR, THREE (3) FAMILY DWELLING. No product keyword matched | 16 | Nov 5, 2026 |
| B | COMCELL CONSTRUCTION CORP. NYC DOB building permits | 11 | Antenna · MODIFICATION TO EXISTING MONOPOLE # 301650149 ON ROOF REMOVE 9 ANTENNA 6 RRH AND 3 CABINET. INSTALL 2 CABINET, 6 RRH 6 ANTENNA. PROJECT IS AN ELLIGLE FACILITIES REQUEST PERSUANT TO SEC 6409(a) OF THE SPECTRUM ACT SEE 47 CFR SEC 1.6. No product keyword matched | 1 | Nov 5, 2026 |
| B | COLONIAL CRAFTERS INC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK DURING INTERIOR RENOVATION OF EXISITING APARTMENT 11H ON 11TH FLOOR No product keyword matched | 2 | Nov 5, 2026 |