Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 1738 U LLC NYC DOB building permits | 9 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 0 | May 21, 2026 |
| B | CITY TABERNACLE OF SEVENTH-DAY ADVE NYC DOB building permits |
| 9 |
Plumbing · Install new plumbing fixtures as per plan. There is no change of use, egress, or occupancy filed under this plan. No product keyword matched |
| 0 |
| May 21, 2026 |
| B | PRIME CONSTRUCTION & REST NYC DOB building permits | 9 | General Construction · Filing application to replace expired BIS application 103149228 / WWP violation issued. Work includes installation of interior non-load bearing partitions and finishes. Plumbing work filed subsequently in DOB NOW. No change to use, egress or occupancy. No product keyword matched | 0 | May 21, 2026 |
| B | JOMOU CORP NYC DOB building permits | 9 | General Construction · Proposed work is facade repairs. No change in use, occupancy or egress. all work to comply with applicable chapters of nycbc. No product keyword matched | 0 | May 21, 2026 |
| B | NYC DCAS NYC DOB building permits | 9 | Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. ELECTRICAL APP# B01337971-I1 FILED SEPARATELY. NO CHANGETO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 21, 2026 |
| B | GOLD UNIVERSITY AVE NYC DOB building permits | 9 | General Construction · OBTAIN NEW CERTIFICATE OF OCCUPANCY. REVISE EXISTING CERTIFICATE OF OCCUPANCY # 65320 - 12.22.1967 TO CHANGE EATING AND DRINKING PLACE WITH CABARET AND STORE USE GROUP 6 TO RESTAURANT USE GROUP 6 AS REQUESTED ON AUDIT TO ALTERATION TYPE 2 # 123669271.INT No product keyword matched | 0 | May 21, 2026 |
| B | ARTURO REALTY INC NYC DOB building permits | 9 | Boiler Equipment · HEREBY FILING FOR THE INSTALLATION OF BOILERS. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | May 21, 2026 |
| B | 910 GRAND CONCOURSE, LLC NYC DOB building permits | 9 | Antenna · Carrier: T-Mobile. Modification of an existing antenna site. Replace (1) antenna and (1) RRU per sector (3 antennas & 3 RRUs in total). Install (2) new cabinets on existing platform. Remove (6) existing RRUs. No change in use, egress, or occupancy. No product keyword matched | 0 | May 21, 2026 |
| B | P&P UNITED CONTRACTING INC. NYC DOB building permits | 9 | General Construction · APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BRICK POINTING AND BRICK REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 21, 2026 |
| B | TUC-MEN CONTRACTING CORP NYC DOB building permits | 9 | General Construction · Job filed for existing apartment 62TE interior renovation: finish floor, wall paint, bathrooms floor and wall finish, new kitchen cabinets and replace plumbing fixture.NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 21, 2026 |
| B | ST FRANCIS DE CHANTAL NYC DOB building permits | 9 | Plumbing · INSTALL NEW GAS SERVICE, PIPING AND METER FOR FOUR (4) REPLACEMENT GAS/OIL BURNERS ON FOUR (4) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 21, 2026 |
| B | METRIC ELECL CONTROLS COR NYC DOB electrical permits | 9 | Replacing existing service switch total of 2 . Only No product keyword matched | 0 | May 21, 2026 |
| B | INGERSOLL ELECTRICAL SOLU NYC DOB electrical permits | 9 | Install conduit pathway for communications wiring from the basement to the roof. Install new telecom cabinets in rooftop equipment room. Install new antenna on elevator penthouse. No product keyword matched | 0 | May 21, 2026 |
| B | PYRAMID ETC COMPANIES, LL NYC DOB building permits | 9 | Structural · structural work for replacement of steel stair in rear yard first floor level No product keyword matched | 0 | May 20, 2026 |
| B | 1821 63RD LLC NYC DOB building permits | 9 | Plumbing · PLUMBING PLANS FILED HEREWITH No product keyword matched | 0 | May 20, 2026 |
| B | PRIME ALLIANCE LLC NYC DOB building permits | 9 | Plumbing · PLUMBING WORK IN THE CELLAR IN CONJUNCTION WITH ALTERATION APPLICATION # Q01185471-I1, TO LEGALIZE THREE NAVIEN GAS COMBO BOILERS IN THE CELLAR No product keyword matched | 0 | May 20, 2026 |
| B | CHENGDU XIAOLONGKAN CATERING MANAGE NYC DOB building permits | 9 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR INTERIOR DEMOLITION OF 1ST FLOOR AS MARKED OF TWO-STORY COMMERCIAL BUILDING. No product keyword matched | 0 | May 20, 2026 |
| B | RB & SON GENERAL CONTRACTORS,INC NYC DOB building permits | 9 | General Construction · PROPOSED NEW ONE CAR GARAGE No product keyword matched | 0 | May 20, 2026 |
| B | JPJ REALTY NYC DOB building permits | 9 | General Construction · PROPOSED INSTALLATION OF 1 NON-ILLUMINATED ACCESSORY BUSINESS AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 20, 2026 |
| B | SOUFER FAMILY LLC NYC DOB building permits | 9 | Mechanical Systems · Modification of existing ductwork. No product keyword matched | 0 | May 20, 2026 |
| B | TRUE HOUSE LLC NYC DOB building permits | 9 | General Construction · FILING APPLICATION TO REFLECT VERTICAL ENARGEMENT TO ADD A 3RD STORY PH LEVEL & CONVERT THE 2ND & 3RD FLOOR TO A SINGLE FAMILY, TWO STORY BUILDING AND INTERIOR ALRERATION WITH ASSOCIATED FINSHES, AS PER PLANS FILED. No product keyword matched | 0 | May 20, 2026 |
| B | The Frick Collection NYC DOB building permits | 9 | General Construction · Temporary structures for an LV event. Removed at the end of the programing. No changes to existing structures, use or egress. No product keyword matched | 0 | May 20, 2026 |
| B | MEG II DESIGN LLC NYC DOB building permits | 9 | Structural · INTERIOR STRUCTURAL WORK IN APT 1A AND CELLAR, INCLUDING FRAMING OF NEW WALL AND FLOOR OPENINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 20, 2026 |
| B | STONE R "US" CONSTRUCTION NYC DOB building permits | 9 | General Construction · Remove (3) doors of convenience and (1) lot-line window between 120 & 122 State Street; Restore the original masonry separation between properties. No change in use, egress, occupancy or Floor Area. No product keyword matched | 0 | May 20, 2026 |
| B | COHEN BROTHER REALTY AS AGENT FOR NYC DOB building permits | 9 | General Construction · Installation of non load bearing partitions as per plans filed herewith. No product keyword matched | 0 | May 20, 2026 |
| B | 96-100 PRINCE STREET INC. NYC DOB building permits | 9 | Sprinklers · MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS TO ACCOMMODATE APARTMENT REMODEL. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | May 20, 2026 |
| B | Mark D. Lipton Assoc. Inc NYC DOB building permits | 9 | General Construction · Remove existing concrete slab and replace with new concrete slab 6 lower in cellar. No product keyword matched | 0 | May 20, 2026 |
| B | 55 WATER LLC NYC DOB building permits | 9 | Standpipe · Propose plumbing, sprinkler and standpipe work. No change in use, egress or occupancy. No product keyword matched | 0 | May 20, 2026 |
| B | 166 ECKFORD LLC NYC DOB building permits | 9 | Sprinklers · Sprinkler work type hereby filed subsequent to the Alt GC application: B00876739-I1 No product keyword matched | 0 | May 20, 2026 |
| B | MIDDLE VILLAGE ASSOCIATE, LLC NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 20, 2026 |
| B | CENTERLINE GROUP LLC NYC DOB building permits | 9 | General Construction · Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. Units 3A&3B are being combined per TPPN 03-97. No change in use, egress or occupancy under this application. No product keyword matched | 0 | May 20, 2026 |
| B | MAINSTREET WORKS CLS LLC NYC DOB building permits | 9 | Sprinklers · FILING PLUMBING AND SPRINKLER WORK IN CONJUCTION WITH HORIZONTAL, VERTICAL EXTENSION RENOVATION OF EXISTING THREE FAMILY BUILDING. No product keyword matched | 0 | May 20, 2026 |
| B | GEMSTAR CONSTRUCTION CORP Austin issued construction permits, NYC DOB building permits | 9 | Building Permit · Remove and replace damaged wooden board behind electric meters at Bldg 10. No product keyword matched | 0 | May 20, 2026 |
| B | HIGH QUALITY 338 INC NYC DOB building permits | 9 | Construction Fence · INSTALLING TEMPORARY FENCE OF EXIST. 3 STORY COMMERCIAL BUILDING , HORIZONTAL & VERTICAL ENLARGEMENT, THIS APPLICATION IS IN CONJUNCTION WITH DOB JOB APPLICATION 321383800. OBTAIN NEW C OF O. No product keyword matched | 0 | May 20, 2026 |
| B | 24 MONROE PLC TNTS CORP. NYC DOB building permits | 9 | General Construction · Roofing Replacement Program. No change to use, occupancy or egress. No product keyword matched | 0 | May 20, 2026 |
| B | WANNING CONSTRUCTION NYC DOB building permits | 9 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE INCONJUNCTION WITH JOB# 123813338. NO CHANGE OF USE, OCCUPANCY, OR EGRESS FILED UNDER THIS APPLICATION. No product keyword matched | 0 | May 20, 2026 |
| B | 350 GERARD HOLDINGS LLC NYC DOB building permits | 9 | Structural · FILING FOR MINOR MASONRY REPAIR AT EXPOSURE 2&3 FACADE. APPLICATION FILED TO SATISFY VIOLATION #103025CPI20102HZ. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 20, 2026 |
| B | MELE CONTRACTING, INC NYC DOB building permits | 9 | Structural · STRUCTURAL FRAMING FOR PROPOSED SKYLIGHTS AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 0 | May 20, 2026 |
| B | READ PROPERTY GROUP LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEMS THROUGHOUT BUILDING IN CONJUNCTION WITH NEW BUILDING JOB # M00485503. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 20, 2026 |
| B | 172 NYC DOB building permits | 9 | Plumbing · Replacement of existing kitchen fixtures, new toilet and sink in powder room. No product keyword matched | 0 | May 20, 2026 |
| B | FERGAL BYRNE INC NYC DOB building permits | 9 | General Construction · Demolition and repair for preparation of Tenant Alteration as per plans No product keyword matched | 0 | May 20, 2026 |
| B | JCNY DEVELMNT GRP INC NYC DOB building permits | 9 | Plumbing · Propose plumbing work at basement of existing AUTO body repair shop as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | May 20, 2026 |
| B | GLOBAL FACILITY MANAGEMEN NYC DOB building permits | 9 | General Construction · Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Basement floor (BOA) as per plans. No change to use, egress or occupancy. No product keyword matched | 0 | May 20, 2026 |
| B | EVANS 171-11B,LLC NYC DOB building permits | 9 | Plumbing · INSTALL NEW PLUMBING FIXTURES IN BATHROOMS, POWDER ROOMS, LAUNDRY ROOMS KITCHEN AND PANTRY ON BAS, 1ST THRU 5TH FL. REMOVE GAS FIXTURES ON 1ST AND 2NF FLOOR. INSTALL GAS FIXTURES IN BASEMENT, 1ST AND 4TH FL. No product keyword matched | 0 | May 20, 2026 |
| B | GROOM CONSTRUCTION CO.INC NYC DOB building permits | 9 | Structural · installation of structural supports for new roof vents. no change to use egress or occupancy No product keyword matched | 0 | May 20, 2026 |
| B | 263 BEDFORD AVE LLC NYC DOB building permits | 9 | General Construction · EXISTING STORE INTERIOR RENOVATION INCLUDING MODIFICATION OF NON-BEARING PARTITIONS, FLOORING, AND LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 20, 2026 |
| B | LUAL-SPACES LLC CONST & D NYC DOB building permits | 9 | General Construction · interior renovation of tenant retrofit. No product keyword matched | 0 | May 20, 2026 |
| B | Bajraktari Management corp NYC DOB building permits | 9 | Construction Fence · Temporary construction fence to secure property (327.28lf). Construction fence filed in Conjunction with NB#240299155, NB#220708134 & DM#220701408. No product keyword matched | 0 | May 20, 2026 |
| B | EXL INC NYC DOB building permits | 9 | General Construction · Installation of new non-combustible deck a t1st FL back facade No product keyword matched | 0 | May 20, 2026 |
| B | 150 EAST 89TH STREET NYC DOB building permits | 9 | General Construction · RENOVATION OF ONE FAMILY RESIDENCE. MINOR PARTITION WORK. KITCHEN AND BATHROOM RENOVATION No product keyword matched | 0 | May 20, 2026 |