Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,518
Tier S19
New this week155
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BQUICK HVAC INC
NYC DOB building permits
9
Mechanical Systems · 2 SPLIT TYPE HEAT PUMP AND AIR CONDITIONING SYSTEM IN REAR OF BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0May 26, 2026
BCOTTAM HEATING & AIR COND
Seer chat
NYC DOB building permits
9
Mechanical Systems · MECHANICAL WORK FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION DOBNOW JOB #M01377085-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0
May 26, 2026
BUNYPO LLC
NYC DOB building permits
9
General Construction · ALTERATION TO EXISTING MULTIPLE DWELLING UNIT APT 1 INTERIOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0May 26, 2026
BAAG HOME IMPR INC
NYC DOB building permits
9
General Construction · HORIZONTAL ENLARGEMENT OF THE FIRST FLOOR OF AN EXISTING SINGLE-FAMILY HOUSE. NO CHANGE TO USE, EGRESS OF OCCUPANCY.
No product keyword matched
0May 26, 2026
BSALAMONE IMPROVEMENTS INC
NYC DOB building permits
9
General Construction · REMOVAL AND REPLACEMENT OF FINISHES AND SELECTIVE PLUMBING FIXTURES WITHIN EXISTING BATHROOMS AS WELL AS THE RELOCATION OF THE EXISTING WASHER/DRYER FROM THE KITCHEN TO WITHIN ONE OF THE BATHROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
0May 26, 2026
BCONSTRUCTION XPERT INC
NYC DOB building permits
9
Structural · Interior structural work to create new door opening in load-bearing wall, lower the existing concrete slab to construct a new reinforced floor. No change to use, egress, or occupancy.
No product keyword matched
0May 26, 2026
BOEE GROUP LLC
NYC DOB building permits
9
Plumbing · APPLICATIOIN FOR PLUMBING WORK IN CONJUNCTIOIN WITH NB JOB#Q00922265-I1.
No product keyword matched
0May 26, 2026
BPLAYABOWLS
NYC DOB building permits
9
General Construction · INTERIOR DEMOLISH OF NON-BEARING INTERIOR PARTITONS AND SUSPENDED CEILINGS. NO CHANGE IN USE OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
No product keyword matched
0May 26, 2026
BKING FAMILY REALTY LLC
NYC DOB building permits
9
Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01280034
No product keyword matched
0May 26, 2026
BEAST WEST GENERAL CONSTRU
NYC DOB building permits
9
Plumbing · PROPOSED PLUMBING WORK FOR A CHANGE OF USE APPLICATION FOR UNIT 1B&1D FROM OFFICE TO CHILD DAYCARE (SCHOOL FOR KIDS AGE FROM 6 MONTHS - 6 YEARS) ON EXIST. 1ST FL.
No product keyword matched
0May 26, 2026
BSUTPHIN HOUSE LLC
NYC DOB building permits
9
Sprinklers · Proposed installation of a fire sprinkler protection system for the cellar & 1st floor only.
No product keyword matched
0May 26, 2026
BNAVISTONE
NYC DOB building permits
9
General Construction · Proposed interior renovation of an existing community facility space at 1st floor of a mixed-use 6-story building, filed in conjunction with the NB application: 321791879.
No product keyword matched
0May 26, 2026
BAMERICAN MILLENNIUM MGT
NYC DOB building permits
9
Sprinklers · MODIFICATION OF EXISTING SPRINKLER SYSTEM PER PLAN. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
No product keyword matched
0May 26, 2026
BQUEENS CENTERS FOR PROGRESS
NYC DOB building permits
9
Mechanical Systems · Installation of split system AC unit and direct exhaust at First Floor UPS room.
No product keyword matched
0May 26, 2026
BMARCOS KITCHEN & BATH INS
NYC DOB building permits
9
General Construction · INTERIOR RENOVATION AND COMBINATION OF APARTMENTS D51 & D52 ON THE 5TH FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0May 26, 2026
BLOTUS 89 LLC
NYC DOB building permits
9
Construction Fence · Install temporary construction fence as per ECB violations. No change in use, egress or occupancy.
No product keyword matched
0May 26, 2026
BVAN GOGH PAINTERS LLC
NYC DOB building permits
9
General Construction · REPLACEMENT OF EXISTING WINDOWS, INSTALLATION OF ONE NEW EXTERIOR WINDOW, AND INSTALLATION OF ONE NEW PTAC UNIT IN APARTMENT 11A, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
No product keyword matched
0May 26, 2026
BEONKEY LLC
NYC DOB building permits
9
General Construction · Resolve ECB violations nos. 39158411H, 39158412J & 39158413L: interior renovation of existing 2nd floor apartment unit; installation of new ceiling finish, partitions, floor finish and lighting fixtures
No product keyword matched
0May 26, 2026
BCEDARS CONSTRUCTION GROUP
NYC DOB building permits
9
Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE
No product keyword matched
0May 26, 2026
BHELM MANAGEMENT INC
NYC DOB building permits
9
General Construction · INSTALL NEW CHIMNEY LINER.
No product keyword matched
0May 26, 2026
BNORDSTROM, INC.
NYC DOB building permits
9
Mechanical Systems · HEREWITH FILING FOR INTERIOR MODIFICATIONS OF ASSOCIATED DUCTS, PIPING, AND DIFFUSERS IN SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
No product keyword matched
0May 26, 2026
BPURIM HOLDINGS LLC
NYC DOB building permits
9
Plumbing · APPLICATION FILED FOR PLUMBING WORK AND RELOCATED GAS EQUIPMENT IN CONJUNCTION WITHCONSTRUCTION JOB #Q01297636.
No product keyword matched
0May 26, 2026
BBX Capital
NYC DOB building permits
9
Plumbing · Plumbing specifications filed in conjunction with GC application B01293275-I1
No product keyword matched
0May 26, 2026
BSPD CONSTRUCTION CORP
NYC DOB building permits
9
Suspended Scaffold · SUSPENDED SCAFFOLD FOR FACADE RESTORATION AS SHOWN ON PLANS
No product keyword matched
0May 26, 2026
BHNL MANAGEMENT
NYC DOB building permits
9
General Construction · MINOR RENOVATION OF 2-STORY BUILDING WITH INSTALLATION OF NEW WINDOWS, KITCHEN COUNTERS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0May 26, 2026
BBARAK NY CORP
NYC DOB building permits
9
Support of Excavation · SOE work to be conducted to install soldier pile and lagging, sloped excavation and monitoring of properties.
No product keyword matched
0May 26, 2026
BFry & Pie LLC
NYC DOB building permits
9
Plumbing · INTERIOR RENOVATION TO EXISTING STORE WITH PLUMBING WORKS INCLUDES NEW KITCHEN PLUMBING FIXTURES , GREASE TRAP AND GAS PIPE INSTALLATION AS PER PLAN.
No product keyword matched
0May 26, 2026
BTHE ATHANASIOS D CONDEELIS PROPERTY
NYC DOB building permits
9
Plumbing · JOB FILED EXIST. COMMERCIAL STORE INSTALL NEW COOKING EQUIPMENT AND PLUMBING FIXTURE PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0May 26, 2026
BMargot McKinney
NYC DOB building permits
9
Structural · Structural modifications to an existing retail space as per plans
No product keyword matched
0May 26, 2026
BPITKIN GROUP LLC
NYC DOB building permits
9
Construction Fence · TEMPORARY CONSTRUCTION FENCE TO BE FILED IN CONJUNCTION WITH NB APPLICATION.
No product keyword matched
0May 26, 2026
BEARTH BOWLS LLC
NYC DOB building permits
9
General Construction · general construction as per plans herewith filed.
No product keyword matched
0May 26, 2026
BGRAND ORCHARD CORP.
NYC DOB building permits
9
General Construction · INTERIOR RENOVATION TO INCLUDE MINOR PLUMBING FIXTURES REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
No product keyword matched
0May 26, 2026
B55TH CLINTON ASSOCIATES, LLC
NYC DOB building permits
9
Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
No product keyword matched
0May 26, 2026
BGILLESPIE AVENUE DEVELOPMENT LLC
NYC DOB building permits
9
Construction Fence · Construction Fence filed in conjunction with NB# X00634188-I1, Demolition #220739627 and Demolition #220739636
No product keyword matched
0May 26, 2026
B322 West 57th Street Condominium
NYC DOB building permits
9
General Construction · INTERIOR RENOVATION FOR APT. 51U INCLUDING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
No product keyword matched
0May 26, 2026
BThe Ferrara Management Group
NYC DOB building permits
9
General Construction · APT. M11 ---INTERIOR ALTERATION TO EXISTING UNIT - INSTALL NEW PARTITIONS AND DOOR - NO CHANGE TO USE, EGRESS OR OCCUPANCY
No product keyword matched
0May 26, 2026
B97 South Day LLC
NYC DOB building permits
9
Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0May 26, 2026
BCASPER R, CALLEN TRUST
NYC DOB building permits
9
General Construction · Re-Cladding of existing fence and framing of wood all over one portion of existing fence. Additional decorative screen wall within fenced property. No change in use, egress or occupancy. Application filed to respond to ECB Violation 39158291M
No product keyword matched
0May 26, 2026
BMANTECH MECHANICAL LLC
NYC DOB building permits
9
Mechanical Systems · UPGRADE MECHANICAL VENTILATION SYSTEM IN CELLR GARAGE, AND ROOF ABOVE , MODIFICATION AND ADDITIONAL DUCT WORK. ALL AS PER PLAN . NO CHANGE IN USE EGRESS OR OCCUPANCY
No product keyword matched
0May 26, 2026
B114 W 131 LLC
NYC DOB building permits
9
General Construction · Replace 4 Windows on the front facade on the 3rd and 4th floor.
No product keyword matched
0May 26, 2026
BNYC Mission Society
NYC DOB building permits
9
Boiler Equipment · REFILING OF APPLICATION NUMBER 100920700 FOR REPLACEMENT BOILER AND OIL BURNER.
No product keyword matched
0May 26, 2026
B331 EAST 33RD LLC
NYC DOB building permits
9
Plumbing · Replacement of domestic gas main, pipe branches, and related meters in the basement.
No product keyword matched
0May 26, 2026
BBREMI INC.
NYC DOB building permits
9
Plumbing · REMOVING EXISTING OIL TANK & OIL BOILER AS PER PLANS. REMOVED COMPONENTS TO BE REPLACED WITH TWO (2) NEW GAS FIRED BOILERS. ALSO INSTALLING ONE (1) NEW HOT WATER HEATER & ONE (1) NEW GAS METER. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0May 26, 2026
B9TH AVENUE BAKERY
NYC DOB building permits
9
Plumbing · INSTALL NEW GAS METER IN CELLAR, GAS APPLIANCES AND PLUMBING FIXTURES AS PER PLANS.
No product keyword matched
0May 26, 2026
BEDISON CONSTRUCTION CORP
NYC DOB building permits
9
General Construction · REMOVAL AND RESTORATION OF FIRE-DAMANGED NON-BEARING INTERIOR PARTITIONS AND CEILING MATERIALS. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
No product keyword matched
0May 26, 2026
BCITY DESIGN SERVICES LTD
NYC DOB building permits
9
General Construction · PARTIAL INTERIOR RENOVATION OF APARTMENT #16P, INCLUDING MINOR DEMOLITION OF NON LOAD-BEARING PARTITION AND FINISHES. RECONFIGURE KITCHEN. INSTALL NEW NON LOAD-BEARING PARTITION, FINISHES AND MILLWORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
No product keyword matched
0May 26, 2026
BLiberty Landing Owner LLC
NYC DOB building permits
9
General Construction · INTERIOR NON-STRUCTURAL DEMOLITION AS PER PLANS.
No product keyword matched
0May 26, 2026
B35 Remsen Owner LLC
NYC DOB building permits
9
Mechanical Systems · IT IS PROPOSED TO INSTALL MECHANICAL EQUIPMENT AND RELATED DUCTWORK AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH B00908351-I1 (ALT CO), B00908351-S1 (PL), B00993073-I1 (GC/ST/EA) & B00975000-I1 (ST).
No product keyword matched
0May 26, 2026
BALVERSON LLC
NYC DOB building permits
9
Curb Cut · PROPOSED INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT TOTALING 18' FOR NEW DETACHED TWO FAMILY RESIDENCE.
No product keyword matched
0May 22, 2026
BST FRANIS FRIENDS OF THE POOR
NYC DOB building permits
9
Mechanical Systems · INSTALL HEAT PUMP HOT WATER HEATING SYSTEM AND ASSOCIATED PLUMBING PIPING AS PER PLANS. FILING IN CONJUNCTION WITH DOBNOW#'S M00886208-I1, M00886208-S1, M00886208-S2. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
No product keyword matched
0May 22, 2026
Showing 13,451–13,500 of 16,520
PreviousNext