Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | East River ESS NYC DOB building permits | 9 | Support of Excavation · SUPPORT OF EXCAVATION ONLY FOR ELECTRICAL CONDUIT TO BE FILED SEPARATELY No product keyword matched | 0 | May 28, 2026 |
| B | Healthy Heart Foods, LLC NYC DOB building permits |
| 9 |
Mechanical Systems · NEW EXHAUST HOOD SYSTEM FOR FOR COMMERCIAL KITCHEN AND MAKE-UP AIR UNIT. No product keyword matched |
| 0 |
| May 28, 2026 |
| B | La Nueva España Restaurant NYC DOB building permits | 9 | Structural · Install Steel Dunnage for 2 HVAC Equipment's at the roof top level. No product keyword matched | 0 | May 28, 2026 |
| B | ELRAY CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · COMBINATION OF ADJACENT 5TH FLOOR APARTMENTS 5T AND 5U UNDER TPP 3OF97. SELECTIVE REMOVAL AND INSTALLATION OF NONLOAD-BEARING PARTITIONS. PLUMBING TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 28, 2026 |
| B | JCK CONTRACTING CORP NYC DOB building permits | 9 | General Construction · Filing for Interior partition changes according to drawings for Units 1B, 1D, 1H, 1J, 1K, & 1L. No exterior work. No change egress. No product keyword matched | 0 | May 28, 2026 |
| B | KELLY CONSTRUCTION CO INC NYC DOB building permits | 9 | Structural · STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | CONCEPT CONSTRUCTION SERV NYC DOB building permits | 9 | Mechanical Systems · Herewith filing for modifications (removals/new installations) to existing mechanical systems on the 1st floor and roof as indicated on plans. No change in use, occupancy, or egress. No product keyword matched | 0 | May 28, 2026 |
| B | WDF INC NYC DOB building permits | 9 | Plumbing · plumbing modifications related to boiler plant building (package 1) as per plans filed herewith. Gas booster blowers feeding boiler and water feed for boiler make-up water tank are in associated buildings on site. no change to use, egress, or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | PC CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · Change of use on the 2nd floor. No product keyword matched | 0 | May 28, 2026 |
| B | Gopuff NYC DOB building permits | 9 | Plumbing · SUBSEQUENT APPLICATION FILED FOR THE INSTALLATION OF NEW PLUMBING FIXTURES IN EXISTING RETAIL SPACE AT 1ST FLOOR OF EXISTING 1 STORY COMMERCIAL BLDG. FILED IN CONJUNCTION WITH DOB NOW APPLICATION # B01217247-I1. NO CHANGE IN BULK, USE OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | Popilevsky family trust NYC DOB building permits | 9 | Plumbing · PAA P1 is filed to amend gas riser diagram to show the residential ranges on the 1st and 2nd floor. No changes to PW3 proposed. No product keyword matched | 0 | May 28, 2026 |
| B | Atomic Wings of Fresh Meadows NYC DOB building permits | 9 | Plumbing · Filing to install commercial store Kitchen Cooking equipments and plumbing fixtures . No product keyword matched | 0 | May 28, 2026 |
| B | INTERNATIONAL WINGS FACTORY LLC NYC DOB building permits | 9 | Plumbing · Plumbing work for cellar and first floor for proposed eating & drinking establishment with comm cooking. In conjunction with renovations filed under M01386419-I1 & M00392638-I1. Supersedes plumbing work permitted under applications 122121453. No product keyword matched | 0 | May 28, 2026 |
| B | KABACK SERVICE, INC NYC DOB building permits | 9 | Mechanical Systems · modification of existing a/c system No product keyword matched | 0 | May 28, 2026 |
| B | DEC CONTRACTORS LLC NYC DOB building permits | 9 | Construction Fence · APPLICATION FILED HEREWITH TO ERECT CONSTRUCTION FENCE ON SITE. No product keyword matched | 0 | May 28, 2026 |
| B | Peck Slip Social NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN APPROVED BY NYC LANDMARK PRESERVATION COMMISSION PERMIT# PMW 25-00734 - IN PROPERTY LINES - PECK SLIP SOCIAL. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | MATEMPA CORP NYC DOB building permits | 9 | General Construction · AS PER BB 2025-006, PROPOSING AN ADU NOT IN A CELLAR, BASEMENT, OR DET GARAGE. ADU IS PROPOSED AT 1ST FLOOR AND PERMITTED AS PER BB 2025-006. No product keyword matched | 0 | May 28, 2026 |
| B | 682 SIXTH AVENUE HDFC NYC DOB building permits | 9 | General Construction · REMOVE THE EXISTING CONCRETE SIDEWALK, VAULT CONCRETE STRUCTURAL SLAB ANDD VAULT STEEL FRAMING, AND INSTALL NEW VAULT STEEL FRAMING, VAULT CONCRETE STRUCTURAL SLAB AND CONCRETE SIDEWALK (LANDMARK GREY COLOR). NO CHANGE IN USE, OR EGRESS. No product keyword matched | 0 | May 28, 2026 |
| B | 46 TRINITY PLACE, LLC NYC DOB building permits | 9 | Antenna · Modification to existing T-Mobile site. Remove 1 antenna frame, relocate 5 antennas, install 1 additional antenna, and relocate 1 RRU on the roof. No product keyword matched | 0 | May 28, 2026 |
| B | Orbital Kitchens USQ LLC NYC DOB building permits | 9 | Mechanical Systems · Proposed interior renovation work for an existing restaurant on cellar, 1st floor and roof. new partition, door, flooring, ceiling, kitchen equipment and ventilation equipment as per plan. no change to use, egress and occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | BIJNAUTH DOOKRAN NYC DOB building permits | 9 | Plumbing · Installation new gas meter in cellar, Installed one kitchens sink and one gas stove at 2nd floor level No product keyword matched | 0 | May 28, 2026 |
| B | NEW H&T INC NYC DOB building permits | 9 | Mechanical Systems · Mechanical work as per plans filed herewith. No change in use, egress, or occupancy No product keyword matched | 0 | May 28, 2026 |
| B | GETFA, LLC NYC DOB building permits | 9 | Mechanical Systems · APPLICATION FILING TO INSTALL DUCTLESS COONDENCING UNIT 1ST FLOOR AS EXISTING STORE AS PER PLAN. NO CHNAGE OF USE, EGRESS NAD OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | 2023 KINDER REALTY TRUST NYC DOB building permits | 9 | General Construction · HORIZONTAL EXTENSION TO EXISTING ATTIC OF SINGLE FAMILY HOUSE. NO CHANGE TO OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | May 28, 2026 |
| B | GREENFORESTFOODCORP NYC DOB building permits | 9 | Construction Fence · Filing plywood fence for front lot area to safeguard retaining wall work as per plans. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | May 28, 2026 |
| B | Walker Hotel Greenwich Village NYC DOB building permits | 9 | Mechanical Systems · Filing for mechanical work for the direct replacement and in-kind installation of two make-up air units, two cooling tower units, four modular chiller units, and related piping. No change in use, egress or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | MANGO CREPES NYC DOB building permits | 9 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | PENGUIN AIR CONDITIONING NYC DOB building permits | 9 | Mechanical Systems · Installation of new supplemental Water Source Heat Pump for conference room 43.46 No product keyword matched | 0 | May 28, 2026 |
| B | NGM VISION GROUP INC NYC DOB building permits | 9 | Mechanical Systems · Interior renovation, modification of non loadbearing partitions, new finishes, new HVAC split system, new deck. There is no change to use, egress or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | PRIME SPRINKLER CORP NYC DOB building permits | 9 | Sprinklers · Sprinkler application filed subsequent to Alt-CO NB application: B01233168-I1. No product keyword matched | 0 | May 28, 2026 |
| B | BKLYNSWEET LLC NYC DOB building permits | 9 | Plumbing · FILING PLUMBING FOR NEW COMMERCIAL KITCHEN GAS FIXTURES IN CELLAR LEVEL No product keyword matched | 0 | May 28, 2026 |
| B | AUTO BODY NYC DOB building permits | 9 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | HI-TECH AIR CONDITIONING NYC DOB building permits | 9 | Mechanical Systems · Cooling tower replacement as per plans. No change in use, egress, or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | SUN MOON CONSTRUCTION NYC INC NYC DOB building permits | 9 | General Construction · APPLICATION FILE TO EXTERIOR FACADE REPAIR AS REMOVE & REPLACE WINDOW LINTELS, SILLS, BRICK POINTING & MINOR BRICK REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 28, 2026 |
| B | NORTHEASTERN GENERAL CONSTRUCTION & NYC DOB building permits | 9 | General Construction · Interior renovations to the second-floor dwelling in an existing 2-family dwelling. No change in use, egress, or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | GREYSTAR PROPERTY MANAGEMENT NYC DOB building permits | 9 | Plumbing · Revised B to answer inspectors comments. No changes to plans. No product keyword matched | 0 | May 28, 2026 |
| B | 33 N. Elliott Place Condominium NYC DOB building permits | 9 | General Construction · APPLICATION FILING TO REMOVE EXISTING BRICK TILES AND REPLACE TO FACED BRICKS AT FRONT FACADE AS PER PLAN. NO CHANGE OF UES, EGRES AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 28, 2026 |
| B | LIONS GROUP NYC DOB building permits | 9 | Mechanical Systems · DIRECT REPLACEMENT OF (2) 12.5 TON ROOF TOP HVAC UNITS. NO CHANGE TO USE, OCCUPANCY, STRUCTURE OR EGRESS. No product keyword matched | 0 | May 28, 2026 |
| B | El Rinconsito Paisa Rest. & Bakery NYC DOB building permits | 9 | General Construction · MINOR ALTERATIONS TO EXISTING RESTAURANT. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 28, 2026 |
| B | NEW YORK INT'L BUILDERS * NYC DOB building permits | 9 | General Construction · SOUND OUT DECORATIVE STONES/POWER WASH OF THE WHOLE FACADE/POINTING/CAULKING & BRICK REPLACEMENT WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. No product keyword matched | 0 | May 28, 2026 |
| B | E.K. COMBUSTION LLC NYC DOB building permits | 9 | Boiler Equipment · REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISITNG BOILER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. No product keyword matched | 0 | May 28, 2026 |
| B | NEW YORK LIVE ARTS NYC DOB building permits | 9 | General Construction · General Construction for Work on 3rd Floor Terrace as per plans. No Change to Use, Egress or Occupancy under this application. No product keyword matched | 0 | May 28, 2026 |
| B | LONG ISLAND CONCRETE INC NYC DOB building permits | 9 | General Construction · Remove existing deck and above ground pool. No product keyword matched | 0 | May 28, 2026 |
| B | HUSA MANAGEMENT CO., LLC NYC DOB building permits | 9 | Mechanical Systems · Replacement of roof mounted air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | BLUESTONE CONSTRUCTION NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 301 EAST 66TH STREET, MANHATTAN FOR FACADE RESTORATION WORK WITH INSPECTIONS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 28, 2026 |
| B | GOTHAM LUXURY.GROUP LLC NYC DOB building permits | 9 | General Construction · Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3rd floor as per plans (Apartment 3iFRenovations.) No change to use, egress or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | WEBSITE ELECTRIC CORP. NYC DOB electrical permits | 9 | New Switches connected to existing lighting No product keyword matched | 0 | May 28, 2026 |
| B | 707 East 215th Street LLC NYC DOB building permits | 9 | Sprinklers · Sprinkler work in conjunction with NB application #X01178301-I1 No product keyword matched | 0 | May 27, 2026 |
| B | BARTELLINO CONSTRUCTION C NYC DOB building permits | 9 | General Construction · replacement of steel lintel and brick over existing 2nd floor windows No product keyword matched | 0 | May 27, 2026 |
| B | SUSAN MILLER TRUSTEE, ROBERT MILLER NYC DOB building permits | 9 | Construction Fence · INSTALL NEW TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING # 321153112. ALL AS PER PLANS. No product keyword matched | 0 | May 27, 2026 |