Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SIGN MASTER USA INC NYC DOB building permits | 9 | General Construction · ERECT NEW AWNING WITH COPY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | RGB PARTNERS LLC NYC DOB building permits |
| 9 |
General Construction · Interior renovation No product keyword matched |
| 0 |
| May 29, 2026 |
| B | Schuman GP LLC NYC DOB building permits | 9 | Sign · INSTALLATION OF AN NON-ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | LEEMA BK LLC - DITMARS 31 LLC NYC DOB building permits | 9 | Plumbing · PLUMBING WORK FOR ALTERATION OF EXISTING SUPERMARKET RENOVATION. No product keyword matched | 0 | May 29, 2026 |
| B | Northern Blvd 1688 LLC NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL WORK TO BE DONE ON 1ST FLOOR COMMERCIAL OFFICE & PARTIAL STAIRS AS MARKED.NO CHANGE IN USE ,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 0 | May 29, 2026 |
| B | THE OLCOTT NYC DOB building permits | 9 | General Construction · FILING FOR FACADE REPAIR WORK FOR FLOORS 001-015 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | BONARDI CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · APPLICATION FILED TO RENOVATE THE FIRST FLOOR APARTMENT AND CELLAR AND MINOR RENOVATION TO THE SECOND FLOOR AS PER PLANS SUBMITTED HERETO. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | FARTUNA CONSTRUCTION INC NYC DOB building permits | 9 | Curb Cut · Filing to obtain signoff for existing Curb Cut at existing 2-family house in conjunction with Application #Q01181273-I1. No product keyword matched | 0 | May 29, 2026 |
| B | Sacred Heart Convent NYC DOB building permits | 9 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | May 29, 2026 |
| B | METROPOLITAN MECHANICAL C NYC DOB building permits | 9 | Mechanical Systems · MODIFICATIONS TO EXISTING MECHANCAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | May 29, 2026 |
| B | 4502 SUNNYSIDE, LLC NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - SPEAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | FOUR BROTHERS GEN'L CONT NYC DOB building permits | 9 | Plumbing · REPLACEMENT OF EXISTING RESIDENTAL PLUMBING FIXTURES AT DWELLING UNITS AND INSTALLATION OF NAVIEN CONDENSING COMBI BOILER.NO CHANGE IN USE, EGRESS OR OCCUPANCY. GAS USAGE AND APPLIANCES COMBINATION UNIT WITH TANKLESS COIL. No product keyword matched | 0 | May 29, 2026 |
| B | MATESOR GLOBAL IMPROVEME* NYC DOB building permits | 9 | General Construction · INTERIOR WORK CONSISTS OF THE REMOVAL OF NON-COMPLIANT PARTITIONS, CABINETRY, AND ASSOCIATED FINISHES WITHIN AN EXISTING ONE-CAR GARAGE TO REMEDY ECB VIOLATION #39183155M, #39183154K and #39183156Y. No product keyword matched | 0 | May 29, 2026 |
| B | 180 2ND AVE LLC NYC DOB building permits | 9 | General Construction · Interior renovations to the eating or drinking establishment. no change to use, egress or occupancy. No product keyword matched | 0 | May 29, 2026 |
| B | UNITED ELITE GROUP INC NYC DOB building permits | 9 | General Construction · WORK INVOLVES PARTITION REMOVAL AND CONSTRUCTION. NEW INTERIOR DOORS AND NEW FINISHES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | BANK STREET COLLEGE OF EDUCATION NYC DOB building permits | 9 | General Construction · PROPOSED FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 29, 2026 |
| B | IMPACT PLUMBING & HEATING LLC NYC DOB building permits | 9 | Mechanical Systems · PROVIDE NEW MECHANICAL SYSTEM No product keyword matched | 0 | May 29, 2026 |
| B | PENTHOUSE 23E LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALL MINI SPLIT UNITS. No product keyword matched | 0 | May 29, 2026 |
| B | Economic Minimarket inc NYC DOB building permits | 9 | Sign · Two (2) new illuminated accessory signs mounted on the building's facade above the ground level storefront. Awning integrated with signs. No product keyword matched | 0 | May 29, 2026 |
| B | 6H CCC Owner LLC NYC DOB building permits | 9 | Mechanical Systems · REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNITS AND RELATED MECHANICAL PIPING, INCLUDING NEW LOUVER AT EXTETIOR REAR WALL. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 29, 2026 |
| B | ALM CONSTRUCTION MANAGE NYC DOB building permits | 9 | Mechanical Systems · Installation of New HVAC and Ventilation equipment for an existing Two family house. No change of sue, egress or occupancy under this application No product keyword matched | 0 | May 29, 2026 |
| B | EMETT CONTROLS INC. NYC DOB building permits | 9 | Foundation · application filed in conjunction with BIS job # 340351924 No product keyword matched | 0 | May 29, 2026 |
| B | Cutone & Company Consultants, llc NYC DOB building permits | 9 | Plumbing · TO FILE PLUMBING WORK FOR 5 STORY MIX-USE BUILDING AT CEL, BAS, 001 TO 004 FL IN CONJUNCTION WITH GC WORK TYPE M00879808-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | Judson Memorial Church NYC DOB building permits | 9 | General Construction · Herewith filing to temporarily install three 20 feet high flagpoles in front of a Landmark's Church Building for a temporary exhibit. No work in the building. No change to building use, egress or occupancy. No product keyword matched | 0 | May 29, 2026 |
| B | LUXEYE OPTICAL, LLC NYC DOB building permits | 9 | Mechanical Systems · REMOVE AND REPLACE OUTDOOR A/C CONDENSER UNITS ON FIRST FLOOR ROOF.EXISTING DUCT WORKS TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 29, 2026 |
| B | 1478 LLC NYC DOB building permits | 9 | Mechanical Systems · DIRECT REPLACEMENT OF EXISTING ROOFTOP A/C CONDENSERWITH NEW, ON EXISTING STEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | 31 E 63 LLC NYC DOB building permits | 9 | Construction Fence · Installation of temporary supported scaffold and construction fence/enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | May 29, 2026 |
| B | NUSLA DESIGN NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - PICCOLO MORINI. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 29, 2026 |
| B | E.M.P. FIRE SPRINKLER LLC NYC DOB building permits | 9 | Sprinklers · SPRINKLER WORK ASSOCIATED WITH THE RENOVATION OF EXISTING MANUFACTURING SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS WITH THIS APPLICATION. No product keyword matched | 0 | May 29, 2026 |
| B | RESNICK GRACIE MEWS, LLC NYC DOB building permits | 9 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | May 29, 2026 |
| B | CHRIS CHIN NYC DOB building permits | 9 | General Construction · #9019 - Interior renovation of existing retail space for Nudie Jeans. No change in egress, use, or occupancy. No product keyword matched | 0 | May 29, 2026 |
| B | BTR INNOVATIVE BUILDERS INC NYC DOB building permits | 9 | Curb Cut · Installation of new curbcut as per plans No product keyword matched | 0 | May 29, 2026 |
| B | 3838 HOLDINGS LLC NYC DOB building permits | 9 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATIOSN AND HORIZONTAL EXTENSION TO FIRST FLOOR OF EXISTING TWO STORY MIXED USE BUILDING. CONVERTING FIRST FLOOR TO COMMUNITY FACILITY-SYNAGOGUE. NO WORK ON SECOND FLOOR. No product keyword matched | 0 | May 29, 2026 |
| B | KAUFMAN MUSIC CENTER NYC DOB building permits | 9 | Mechanical Systems · remove the existing rooftop air conditioner and replace in kind. no change in use, egress, or occupancy. No product keyword matched | 0 | May 29, 2026 |
| B | CMBS ANC1021, LLC NYC DOB building permits | 9 | Plumbing · Plumbing work as per plans filed herewith. No product keyword matched | 0 | May 29, 2026 |
| B | BNY MELLON, N.A. AS TRUSTEE NYC DOB building permits | 9 | Plumbing · Installation of a new (3) piece bathroom at the second floor. There is no change in use, egress or occupancy under this application No product keyword matched | 0 | May 29, 2026 |
| B | NY RAINBOW INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION IN APT 8L No product keyword matched | 0 | May 29, 2026 |
| B | PERFORM ELECTRICAL CORP NYC DOB electrical permits | 9 | New Electrical Main Service and General Wiring. No product keyword matched | 0 | May 29, 2026 |
| B | ELECTRICCITY INC NYC DOB electrical permits | 9 | Fixed damaged overhead outdoor conduit and outdoor meter equipment due to tree damage. No product keyword matched | 0 | May 29, 2026 |
| B | LAGUARDIA CORP CENTER ASSOC, LLC NYC DOB building permits | 9 | General Construction · INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE PROGRAM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | CW REALTY NYC DOB building permits | 9 | General Construction · Installing new single step at ADA egress entrance. No product keyword matched | 0 | May 28, 2026 |
| B | MURRAY CRAFT BULD CORP NYC DOB building permits | 9 | General Construction · Combine apartments 5H and 5J. Demolition of interior non-load bearing partitions, construct interior non-load bearing partitions and finishes. No change in use, egress or occupancy. No product keyword matched | 0 | May 28, 2026 |
| B | ETGC SERVICES INC NYC DOB building permits | 9 | Plumbing · PLUMBING WORK ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | DPH PLUMBING & HTG CORP NYC DOB building permits | 9 | Plumbing · HEREWITH FILED FOR A NEW BATHROOMS ON THE 1ST AND 2ND FLOOR (SEE PLAN), REPLACING EXISTING KITCHEN ON 1ST FLOOR. REPLACE EXT'G FURNACE AND H.W.H WITH NEW DIRECT VENT BOILER AND HOT WATER HEATER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | May 28, 2026 |
| B | 5163180326 NYC DOB building permits | 9 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | ALLIED ARBORCRAFT CORP NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION WORK WILL INCLUDE INTERIOR RENOVATION, REMOVAL AND ADDITION OFNON-STRUCTURAL PARTITIONS AT EXISTING MEDICAL OFFICE #1B . NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | TDC CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · PROPOSED RENOVATION OF APARTMENT 3D AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | May 28, 2026 |
| B | LIMELSA FLOOR COVERING & NYC DOB building permits | 9 | General Construction · Proposed two family conversion. Renovate Basement Apt. 1 (691 S,F,) New kitchen and new rear deck. New C of O. No product keyword matched | 0 | May 28, 2026 |
| B | POWER TOM LLC NYC DOB building permits | 9 | Mechanical Systems · PROPOSED REPLACING OF INDOOR HVAC HEAT PUMP EQUIPMENT @APT. 7E . MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | May 28, 2026 |
| B | 170 HAWTHORNE STREET REALTY CORP. NYC DOB building permits | 9 | Structural · Modification of front door entrance and front courtyard concrete slab on grade, including temporary shoring. No product keyword matched | 0 | May 28, 2026 |