Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | KALRA REALTY HOLDINGS LLC NYC DOB building permits | 9 | Foundation · Install a retaining at street property line. All work as per plans. No product keyword matched | 0 | Jun 4, 2026 |
| B | OFFICE OF JAMES RUDERMAN NYC DOB building permits | 9 |
Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Jun 4, 2026 |
| B | barclay gardens NYC DOB building permits | 9 | General Construction · interior renovation of apartment as per plans. no change in use, egress or occupancy. No product keyword matched | 0 | Jun 4, 2026 |
| B | SHANGHAI COMMERCIAL BANK NYC DOB building permits | 9 | General Construction · Facade repair work at existing building, as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 4, 2026 |
| B | THE MARMARA HOTEL NYC DOB building permits | 9 | Plumbing · INSTALLATION OF NEW PLUMBING FIXTURES IN AN EXISTING EATING AND DRINKING ESTABLISHMENT AS PER PLANS SUBMITTED. No product keyword matched | 0 | Jun 4, 2026 |
| B | Cherry Valley NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 4, 2026 |
| B | CNJ PLUMBING INC NYC DOB building permits | 9 | Plumbing · REPLACEMENT OF FOURTEEN (14) GAS METERS AND HOT WATER HEATERS TO ENABLE REMEDIAL STRUCTURAL WORK. REMOVE & REINSTALL ALL FIXTURES IN APTS 1A & 1B AND THE EXISTING LAUNDRY ROOM. REMOVE & REINSTALL 12 SPRINKLER HEADS. BLDG TO BE VACATED DURING CONSTRUCTION. No product keyword matched | 0 | Jun 4, 2026 |
| B | LIBRA CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · FILE APPLICATION TO REPAIR AND REPLACE PART OF EXTERIOR BRICK FACE AT KOSSUTH PLACE AS PER PLAN. REMEDY TO CURE DOB VIOLATION #:39109711Z. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 4, 2026 |
| B | 14604 JAMAICA LLC NYC DOB building permits | 9 | Plumbing · Existing boiler & hot water heater removed & caped and install new gas furnace connection for Heating & Ventilation units at 1st, 2nd & 3rd floor. No product keyword matched | 0 | Jun 4, 2026 |
| B | TOPLINE ELECTRIC CORP NYC DOB electrical permits | 9 | APT.5P.ADDITIONAL HI HATS FROM EXISTING LIGHT CIRCUITS. RELOCATION OF EXISTING OUTLET BOXES. NO NEW CIRCUITRY OR WORK FROM EXISTING PANEL. No product keyword matched | 0 | Jun 4, 2026 |
| B | CUBE ELECTRICAL CORP NYC DOB electrical permits | 9 | General Wiring from Existing Panel No product keyword matched | 0 | Jun 4, 2026 |
| B | SHALBRO CONSTRUCTION GROUP NYC DOB building permits | 9 | Sprinklers · piping with steel sleeve through foundation wall No product keyword matched | 0 | Jun 3, 2026 |
| B | VAULT SPORTSWEAR INC NYC DOB building permits | 9 | Construction Fence · Construction fence around entire property No product keyword matched | 0 | Jun 3, 2026 |
| B | KOSTYANTYN GARKUSHA NYC DOB building permits | 9 | General Construction · PROPOSED WORK TO CORRECT ECB VIOLATIONS 39178344P & 39178345R. REMOVE ILLEGAL ENCLOSURE OF EXISTING GARAGE OPENING AT GROUND FLOOR & RETURN GARAGE DOOR AS PER PLAN. NO CHANGES TO USE, OCCUPANCY AND/OR EGRESS OF EXISTING TWO-FAMILY BUILDING. No product keyword matched | 0 | Jun 3, 2026 |
| B | LIDIA MANAGEMENT CORP. NYC DOB building permits | 9 | Plumbing · INSTALL NEW GAS SERVICE, METER AND PIPING. No product keyword matched | 0 | Jun 3, 2026 |
| B | SAPPHIRE CONSTRUCTION GROUP LLC NYC DOB building permits | 9 | General Construction · FILING FOR INTERIOR RENOVATIONS TO EXISTING ONE FAMILY DWELLING UNIT WITH CONVERSION OF EXISTNG BASEMENT TO CELLAR AND REAPPORTINING OF FAR. EXISTING FAR BEING REAPPLIED TO SECOND AND ATTIC FLOOR. No product keyword matched | 0 | Jun 3, 2026 |
| B | ENERGY BRITE INS & SOLAR NYC DOB building permits | 9 | General Construction · Rebuild existing deck at rear of building. No change to egress, use or occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | W.J. REGAN & COMPANY LLC NYC DOB building permits | 9 | Mechanical Systems · Alterations to mechanical system on 43rd floor as per plans. No change to use. egress or occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | LEE & COMPANY OF NY, INC NYC DOB building permits | 9 | General Construction · Proposed work consists of legalization of demolition of non-structural partition walls and obstructions illegally installed by a tenant. Work includes removal of furniture-supported plywood and door. No changes to use, egress, and occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | YW 195 LLC NYC DOB building permits | 9 | Earth Work · TO ERECT TWO STORY ADDITIONS AT FRONT & REAR AND RAISE ATTIC INTO A 2ND FLOOR IN THIS EXISTING 1.5 STORY 1 FAMILY DWELLING AND TO ADD AN ADU. WORK TO INCLUDE THE REMOVAL & INSTALLATION OF STRUCTURAL MEMBERS, PARTITIONS, FENESTRATION & MECHANICAL EQUIPMENT No product keyword matched | 0 | Jun 3, 2026 |
| B | LOWVOLT TECH ENTERPRISES NYC DOB building permits | 9 | General Construction · FILING FOR PLACEMENT OF NEW CONCRETE IN YARD TO ADDRESS VIOLATION #39159269K. NO CHANGES IN USE, OCCUPATION OR EGRESS No product keyword matched | 0 | Jun 3, 2026 |
| B | NEW YORK HOIST LLC NYC DOB building permits | 9 | General Construction · Filing for interior and minor exterior renovations to the existing building as per plans. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Jun 3, 2026 |
| B | FASA CONTRACTING INC NYC DOB building permits | 9 | Construction Fence · Install 8' temporary construction fence aligned with property lot lines No product keyword matched | 0 | Jun 3, 2026 |
| B | DIVISION HOUSING CORP. NYC DOB building permits | 9 | General Construction · REPLACEMENT OF MAIN AND BULKHEAD ROOFS, FACADE PINNING, INTERIOR REPAIRS/UPGRADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jun 3, 2026 |
| B | SUPER PLUMBERS CORP NYC DOB building permits | 9 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH BUILDING RENOVATION. No product keyword matched | 0 | Jun 3, 2026 |
| B | TMR Group Corp NYC DOB building permits | 9 | Construction Fence · TEMPORARY COSTRUCTION FENCE No product keyword matched | 0 | Jun 3, 2026 |
| B | CARLETON RESTORATION INC NYC DOB building permits | 9 | General Construction · Replacement of existing kitchen and bathroom fixtures and cabinets in-place, glazing of existing tub, resurfacing of flooring, and paint. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | BROOKSIDE ENVIRONMETAL IN NYC DOB building permits | 9 | General Construction · Propose to file for removal of a 1,000 gallon heating oil AST. No change in use, egress or occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | NINO GENERAL CONTRACTING NYC DOB building permits | 9 | Mechanical Systems · INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING INSTALLATION OF ENERGY RECOVERY VENTILATOR WITH DUCTWORK AND AIR CONDITIONING SYSTEM. No product keyword matched | 0 | Jun 3, 2026 |
| B | PARKSET PLUMBING CO INC NYC DOB building permits | 9 | Plumbing · INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 W/M, 2 SHOWER, 6 LAV, 5 WC, 2 SINK, 1 MOP SINK, 1 TUB, 1 DW, 3 F.D., 1 DWH, 2 SUMP PUMP) AND NEW GAS PIPING FOR (1 DRYER, 1 STOVE, 1 BOILER, 1 BBQ). No product keyword matched | 0 | Jun 3, 2026 |
| B | 8084 Kent NYC DOB building permits | 9 | Plumbing · PIPING WITH STEEL SLEEVE THROUGH FOUNDATION WALL No product keyword matched | 0 | Jun 3, 2026 |
| B | CHURCH OF THE HOLY APOSTLES NYC DOB building permits | 9 | Sprinklers · NEW PLUMBING SYSTEM FOR KITCHEN AND OFFICES, DEMO ALL EXISTING FIXTURES IN MISSION HOUSE. Modifications and additions to existing SPRINKLER SYSTEM. No product keyword matched | 0 | Jun 3, 2026 |
| B | KOTSONIS MANAGEMENT, LLC. NYC DOB building permits | 9 | General Construction · FILING TO RENOVATE APARTMENT #8 IN EXISTING MULTIPLE DWELLING. REPLACE FINISHES AS NOTED ON PLANS & MINOR PARTITION CHANGES. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 0 | Jun 3, 2026 |
| B | 122 BEDFORD AVE NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATIONS IN EXISTING RESIDENTIAL BUILDINGS ( CONFIGURED AS 3 ATTACHED 2 FAM UNITS ) - ALL WORK SUBMITTED AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. PLUMBING AND MECHANICAL TO BE FILED UNDER SEPARATE APPLICATION. No product keyword matched | 0 | Jun 3, 2026 |
| B | SAMIRA BLOORIAN NYC DOB building permits | 9 | Plumbing · FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION #Q01280779-I1 & GARAGE NB APPLICATION # Q01303489-I1. No product keyword matched | 0 | Jun 3, 2026 |
| B | DONATO PLMG INC NYC DOB building permits | 9 | Sprinklers · Sprinkler application filed as per plan provided replacement and relocation of existing sprinkler heads per new architectural layout. No product keyword matched | 0 | Jun 3, 2026 |
| B | CW NORTHERN LLC NYC DOB building permits | 9 | General Construction · TENANT FIT-OUT FOR EXISTING EATING AND DRINKING ESTABLISHMENT AT 001 FLOOR, UNIT 110 & 111 WITH GENERAL CONSTRUCTION WORK; NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jun 3, 2026 |
| B | IDEATE CALDWELL LLC NYC DOB building permits | 9 | Plumbing · Filing plumbing & sprinkler work type for the renovation of an 3-story building with Cellar. Plumbing & sprinkler works as per plan. No change in use, bulk, egress or occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | Abadi LLC NYC DOB building permits | 9 | Structural · STRUCTURAL PLANS FILED HEREWITH No product keyword matched | 0 | Jun 3, 2026 |
| B | CLINY NYC DOB building permits | 9 | Plumbing · PLUMBING MODIFICATIONS WITH INTERIOR RENOVATION TAKING PLACE ON THE 8TH FLOOR, AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 3, 2026 |
| B | 171 WEST 12TH STREET INC. NYC DOB building permits | 9 | General Construction · Install a CMU wall and doors at cellar level. No change to use, egress or occupancy. No product keyword matched | 0 | Jun 3, 2026 |
| B | THE SWATCH GROUP (U.S.) INC NYC DOB building permits | 9 | General Construction · Omega - Storefront and minor interior work on the 1st floor as indicated on drawings. No product keyword matched | 0 | Jun 3, 2026 |
| B | SIN DO CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · TO REMOVE THE ILLEGAL WOOD SHED EXTENSION WITH METAL ROOFING ENCLOSING THE ENTIRE REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. TO ADDRESS ECB VIOLATION NUMBER 39168028Y, 39168027M, 39168026K. No product keyword matched | 0 | Jun 3, 2026 |
| B | MAURICE CONTRACTORS & DESIGNERS INC NYC DOB building permits | 9 | General Construction · Convert Mixed use building from 2 stores and 1 dwelling unit to 2 stores and 2 dwelliing units. No product keyword matched | 0 | Jun 3, 2026 |
| B | NAIL KISS NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 3, 2026 |
| B | DESIGN RENOVATE INC NYC DOB building permits | 9 | General Construction · Minor interior partition work in apartment 6C. No product keyword matched | 0 | Jun 3, 2026 |
| B | 185 BENZIGER LLC NYC DOB building permits | 9 | Construction Fence · FILING TEMPORARY CONSTRUCTION FENCE IN A RESIDENTIAL HOUSE. No product keyword matched | 0 | Jun 3, 2026 |
| B | 771 NINTH PROPERTY LLC NYC DOB building permits | 9 | Plumbing · New plumbing for commercial kitchen on first floor, Kitchen hood to be provided with FDNY-approved fire suppression system under separate permit. New plumbing for bathroom on first floor. New plumbing for cellar floor bathroom and drainage. No product keyword matched | 0 | Jun 3, 2026 |
| B | Rudd Management, LLC NYC DOB building permits | 9 | Suspended Scaffold · MATERIAL HOIST. FOR MATERIALS ONLY. NO WORK FROM HOIST. No product keyword matched | 0 | Jun 3, 2026 |
| B | ARCO DB COMPANIES, INC NYC DOB building permits | 9 | Construction Fence · Installation of Temporary Construction Fence No product keyword matched | 0 | Jun 3, 2026 |