Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | NAIL AUG INC NYC DOB building permits | 7 | General Construction · PROPOSED INTERIOR RENOVATION IN SPACE A&B AND INSTALLATION OF NAIL VENTILATION SYSTEM FOR A NAIL SPA IN SPACE A ON THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Dec 24, 2025 |
| C |
| 7 |
Mechanical Systems · Replace 2 existing split air-cooled HVAC systems, modify existing ductwork, add new toilet exhaust ductwork, remove existing dryer exhaust, replace grills and registers, rebalance, start-up and test new equipment, and provide new thermostats and controls. No product keyword matched |
| 0 |
| Dec 24, 2025 |
| C | MAJESTIC PROPERTY MANAGEMENT CORP NYC DOB building permits | 7 | General Construction · ALTERATIONS TO APT 3A. PARTITIONS, CABINETS AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 24, 2025 |
| C | NEW MT. ZION BAPTIST CHURCH NYC DOB building permits | 7 | Structural · Replace reinforced concrete slab and install new steel beams at front wall setback area per drawings. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Dec 24, 2025 |
| C | E&T SKYLINE CONSTRUCTION NYC DOB building permits | 7 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE INSTALLED ON SW / RDWY. DOT PERMITS BY OTHERS. No product keyword matched | 0 | Dec 24, 2025 |
| C | GRYPHON CONSTRUCTION INC NYC DOB building permits | 7 | General Construction · General construction work - remove existing wash room building 211,remove equipment and concrete slab, new switch gear room, new raised equipment platform and new fence and gate. No product keyword matched | 0 | Dec 24, 2025 |
| C | BIG APPLE PAINTING AND C* NYC DOB building permits | 7 | Mechanical Systems · Replacement of (1) Indoor Air handling unit and (1) Outdoor Condensing unit. No change in use of occupancy and egress. No product keyword matched | 0 | Dec 24, 2025 |
| C | WILLIAMSBURG MATERIALS NYC DOB building permits | 7 | Construction Fence · CONSTRUCTION FENCE FOR DOB JOB APPLICATION #421893115. No product keyword matched | 0 | Dec 24, 2025 |
| C | ZDJ STEINWAY LLC NYC DOB building permits | 7 | Full Demolition · full demolition of 1 story structure, using hand held with mechanical to assist. No product keyword matched | 0 | Dec 24, 2025 |
| C | KINYU PROPERTY MANAGEMENT NYC DOB building permits | 7 | General Construction · JOB FILED HEREWITH TO REMOVE ECB VIOLATION #039162326P AND #039162327R AT EX. 1-FAMILY DWELLING UNIT, INCL. REMOVAL OF REAR ENCLOSURE AND ENCLOSED STORAGE AREA UNDER DECK, AND INSTALLATION OF NEW METAL GUARDRAIL AS PER PLANS. No product keyword matched | 0 | Dec 24, 2025 |
| C | Animal Hospital of Morris Park NYC DOB building permits | 7 | General Construction · FILE APPLICATION FOR INTERIOR RENOVATION IN EXISTING ANIMAL HOSPITAL AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 24, 2025 |
| C | (917) 297-7702 NYC DOB building permits | 7 | Solar · SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS No product keyword matched | 0 | Dec 24, 2025 |
| C | OSOS PETS NEWKIRK CORP NYC DOB building permits | 7 | General Construction · MINOR INTERIOR RENOVATION TO THE FIRST FLOOR COMMERCIAL SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 24, 2025 |
| C | Bruno Columbia Inc. NYC DOB building permits | 7 | Mechanical Systems · FILE MECHANICAL WORK FOR EXISITNG COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPACY. No product keyword matched | 0 | Dec 24, 2025 |
| C | LAS CONSTRCUTION NYC DOB building permits | 7 | Plumbing · RE-FILING FOR PLUMBING FIXUTRE INSTALLATION AT 2ND FLOOR AS PER APPROVED DOB# 200630219. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 24, 2025 |
| C | YYY BROOKLYN NY LLC NYC DOB building permits | 7 | Construction Fence · TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SW/RDWY. DOT PERMITS BY OTHERS. No product keyword matched | 0 | Dec 24, 2025 |
| C | Loisaida Studio LLC NYC DOB building permits | 7 | Structural · Facade Repair and Roof Structural Retrofit to Support New Skylights, Solar Panels, Fire Escape and Low roof as per Plan. No product keyword matched | 0 | Dec 24, 2025 |
| C | CANGIALOSI CONSTR LLC NYC DOB building permits | 7 | Full Demolition · demolition of dwellings at 71-17 & 19 Cooper Ave No product keyword matched | 0 | Dec 24, 2025 |
| C | SPRING AIR NEWTWORK SOLU* NYC DOB building permits | 7 | Mechanical Systems · Direct replacement of existing RTU No product keyword matched | 0 | Dec 24, 2025 |
| C | FICESCO19WILBUR LLC NYC DOB building permits | 7 | Curb Cut · Construct one 9'-0 curb cut including 2-1'-6 splays, located on the north side of Wilbur Street, 102'-6 west of Walch Place. Refer to application 520360555 for relevant work. No product keyword matched | 0 | Dec 24, 2025 |
| C | ALBERT NYC DOB building permits | 7 | Construction Fence · INSTALL TEMPORARY CONSTRUCTION FENCE TO ADDRESS DOB VIOLATIONS ER01CM AND FEU31501XC. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 24, 2025 |
| C | TIEN RAN BUDDHA CHURCH NYC DOB building permits | 7 | Sprinklers · AMEND EXISTING CELLAR SPRINKLER SYSTEM AND ADJUST FIRST FLOOR LAYOUT DIMENSION.NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Dec 24, 2025 |
| C | 110CPS 5A&5B, LLC NYC DOB building permits | 7 | Plumbing · HEREBY FILING FOR THE REPLACEMENT. REMOVAL AND INSTALLATION OF FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Dec 24, 2025 |
| C | THE MANN GROUP NYC DOB building permits | 7 | Plumbing · PLUMBING WORK TO THE CELLAR AND 1ST FLOOR COMMERCIAL SPACE IN AN EXISTING 4-STORY, MIXED-USE BUILDING. ALTERATIONS TO INCLUDE NEW, REMOVED, RELOCATED, AND REPLACED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Dec 23, 2025 |
| C | HAPPY HOME CONSTRUCTION C NYC DOB building permits | 7 | General Construction · APPLICATION FILED FOR MINOR STOREFRONT WORK, INCLUDING REPLACEMENT OF EXISTING DOOR AND WINDOWS No product keyword matched | 0 | Dec 23, 2025 |
| C | METRO FIRE PROT HLDG CORP NYC DOB building permits | 7 | Sprinklers · Demolition of existing sprinklers, hose racks and providing temp construction sprinkler loop. No product keyword matched | 0 | Dec 23, 2025 |
| C | MOORE ASSOCIATES NYC DOB building permits | 7 | General Construction · FISP REPAIRS INCLUDING LINTEL RESTORATION, CONCRETE PATCHING, AND MASONRY REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Dec 23, 2025 |
| C | KAPPA SIGMA REALTY LLC NYC DOB building permits | 7 | Plumbing · FILED HEREWITH FOR PLUMBING WORK FIT OUT OF EXISTING RETAIL SPACE IN CONJUNCTION TO Q01325413-I1. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Dec 23, 2025 |
| C | SEDGWICK/MARBLE HILL NYC DOB building permits | 7 | Construction Fence · TEMPORARY CONSTRUCTION FENCE AROUND THE PROPERTY PERIMETER No product keyword matched | 0 | Dec 23, 2025 |
| C | SIX-O REALTY CORP NYC DOB building permits | 7 | Mechanical Systems · REPLACEMENT OF EXISTING FOUR HVAC OUTDOOR UNITS ON ROOF ON EXISTING DUNNAGE No product keyword matched | 0 | Dec 23, 2025 |
| C | 99-02 NORTHERN BOULEVARD NYC DOB building permits | 7 | Structural · PROPOSED STRUCTURAL REPAIR TO ALL FLOORS AND REPAIR MASONRY FACADE. (ECB #: 37025783R; 39078374H; 37020011Y; 35440166R; 35440167Z; 37009897P; 35286687J; 35244857H) No product keyword matched | 0 | Dec 23, 2025 |
| C | B&C INTERIOR SOLUTIONS IN NYC DOB building permits | 7 | General Construction · PROPOSED PARTIAL INTERIOR DEMOLITION, REMOVAL OF EXTERIOR WOODEN DECK No product keyword matched | 0 | Dec 23, 2025 |
| C | SARA WAY INC NYC DOB building permits | 7 | Plumbing · FILED PLUMBING WORK TO MODIFY GAS PIPING FOR EXISTING HWHS AND BOILER AT CELLAR IN A MIXED-USE BUILDING No product keyword matched | 0 | Dec 23, 2025 |
| C | JOSEPH GALANTE CONTR INC NYC DOB building permits | 7 | General Construction · PROPOSED LEGALIZATION FOR A FRONT EXTENSION TO THE EXISTING TWO FAMILY, TWO STORY RESIDENCE, AND THE ENCROACHMENT OF THE CONCRETE PORCH INTO THE WIDENING LINE AREA No product keyword matched | 0 | Dec 23, 2025 |
| C | TABRIZ GROUP DESIGN NYC DOB building permits | 7 | Plumbing · PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01229380. No product keyword matched | 0 | Dec 23, 2025 |
| C | 8811 101 LLC NYC DOB building permits | 7 | Sign · PROPOSED INSTALLATION OF 1 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN. WORDING 1-800 CANTASO STUDIOS No product keyword matched | 0 | Dec 23, 2025 |
| C | 442 RICHMOND CORP NYC DOB building permits | 7 | Structural · Replacement of damaged roof decking No product keyword matched | 0 | Dec 23, 2025 |
| C | MANKA CONSTRUCTION INC NYC DOB building permits | 7 | Mechanical Systems · NEW THREE(3) AC UNITS IN APARTMENT 1 AND ONE OUTDOOR CONDENSER IN OPEN SPACE. NO CHANGE TO OCCUPANCY, USE, OR EGRESS No product keyword matched | 0 | Dec 23, 2025 |
| C | JDM CONTRACTING SERVICES NYC DOB building permits | 7 | General Construction · PHC: Interior partitions and Finishes as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 0 | Dec 23, 2025 |
| C | DUPRAT CONSTRUCTION CORP NYC DOB building permits | 7 | Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Dec 23, 2025 |
| C | Quick Pho Vietnamese Cuisine NYC DOB building permits | 7 | Mechanical Systems · REPLACE EXISTING HVAC UNIT WITH NEW FOR 1st FLOOR USE. EXISTING DUCT TO REMAIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 23, 2025 |
| C | TWO BRIDGES ASSOCIATES L.P. NYC DOB building permits | 7 | General Construction · Geotechnical load test No product keyword matched | 0 | Dec 23, 2025 |
| C | Tiffany Driving School NYC DOB building permits | 7 | General Construction · Adding small interior ramp to restroom for ADA. Updating CO on 1st floor to office. Adding CO of the entire building to DOB NOW. No product keyword matched | 0 | Dec 23, 2025 |
| C | NEW22 CONSTRUCTION CORP NYC DOB building permits | 7 | General Construction · IN UNIT D3 ON FLOOR 4, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS, REMOVAL AND REPLACEMENT OF CEILINGS AND FINISHES AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Dec 23, 2025 |
| C | RED ROCK INVESTMENTS LLC NYC DOB building permits | 7 | Structural · PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH ALT I JOB #321596475. No product keyword matched | 0 | Dec 23, 2025 |
| C | ALL-CITY METAL INC NYC DOB building permits | 7 | Mechanical Systems · Installation of exhaust fans and Fresh Air Intake on garage roof. No change to use, egress or occupancy. No product keyword matched | 0 | Dec 23, 2025 |
| C | SUPREME CONSTR & MAINT CO NYC DOB building permits | 7 | General Construction · minor renovation - install knee wall and wall near kitchen. install finishes. remove hood and install new hood to existing ductork (some new duct work may be required) as per drawings. no change in use, egress or occupancy. No product keyword matched | 0 | Dec 23, 2025 |
| C | The SecureCom Group Ltd. NYC DOB building permits | 7 | Structural · Miscellaneous 2nd floor office renovation with minor partitions, ceiling, and flooring updates. First-floor storage units with minor partitions, including those around the existing mezzanine. No change of use, egress, or occupancy. No product keyword matched | 0 | Dec 23, 2025 |
| C | ABVE CORP NYC DOB building permits | 7 | Plumbing · UPGRADE FOR COMMERCIAL KITCHEN/ PLUMBING FIXTURES IN EXISTING RESTAURANT RESOLVE ECB VIOLATION#39135298N / NO CHANGE EGRESS OR OCCUPANCY No product keyword matched | 0 | Dec 23, 2025 |
| C | HCK RECREATION INC. NYC DOB building permits | 7 | General Construction · FILING APPLICATION FOR CHILLER REPLACEMENT, ROOF RECOVER AND EQUIPMENT PADS. NO CHANGE, IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Dec 23, 2025 |