Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | TW INTERIORS LLC NYC DOB building permits | 9 | Mechanical Systems · INTERIOR MECHANICAL SYSTEM WORK IN CONJUNCTION WITH THE COMBINATION OF APT. 5B AND 5C (ARCHITECTURAL APPLICATION#M08047779). NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THIS APPLICATION TO SUPERSEDE ALT1 #101115437. RELATED JOB # M00843816, M08047779. No product keyword matched | 0 | Jun 12, 2026 |
| B |
| HD HVAC OF NY INC NYC DOB building permits |
| 9 |
Plumbing · RENOVATION OF WATER DAMAGED ONE FAMILY HOUSE, REMOVAL AND INSTALLATION OF PARTITION AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THISAPPLICATION. No product keyword matched |
| 0 |
| Jun 12, 2026 |
| B | 154-21 CORP NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF MECHANICAL EQUIPMENT (AIR CONDITIONING WITH PIPING AND CONTROLS AND TOILET/KITCHEN EXHAUST SYSTEM). SCOPE OF WORK INLCUDES PROVIDING SPLIT AC UNITS W/ ROOF CONDENSERS & INDOOR AIR HANDLERS, PROVIDING HUMIDIFIER, ROOF FANS WITH RELATED DUC No product keyword matched | 0 | Jun 12, 2026 |
| B | MANHATTANITES CONSTRUCTIO NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF APARTMENT 5C ON THE 5TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 12, 2026 |
| B | HENRY F MALARKEY & CO,PC NYC DOB building permits | 9 | Structural · PROPOSED SECOND STORY ADDITION OVER EXISTING ONE-STORY FRAME & 2-STORY ADDITION AT REAR OF EXISTING 1-FAMILY DETACHED RESIDENCE. NEW C OF O REQUIRED. No product keyword matched | 0 | Jun 12, 2026 |
| B | J+J REALTY LLC NYC DOB building permits | 9 | Structural · VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE AND CONVERTING TO TWO FAMILY HOUSE. OBTAIN NEW C OF O. No product keyword matched | 0 | Jun 12, 2026 |
| B | GEM Consultants NYC DOB building permits | 9 | General Construction · Renovation of an Old-(1938) Code apartment (8A), including removal of non-load bearing partitions, cosmetic renovations and replacements. No change to occupancy / use, egress or fire protection under this application. No product keyword matched | 0 | Jun 12, 2026 |
| B | 92 BROOKLYN AVE NY LLC NYC DOB building permits | 9 | Structural · Interior building renovations to include drywall partitions drop ceiling ,floor / roof joist stairs and roof bulkhead. heat pump 4-story rear extension, footing and foundation ad to obtain a new C of O see plans. No product keyword matched | 0 | Jun 12, 2026 |
| B | FIRST VILLAGE CONDO INC NYC DOB building permits | 9 | Suspended Scaffold · FACADE RESTORATION, INSPECTIONS No product keyword matched | 0 | Jun 12, 2026 |
| B | Legend Construction & builders inc NYC DOB building permits | 9 | Mechanical Systems · Interior renovation at existing six family residential building. Work to relocate walls, and install new accessory toilet on cellar. No product keyword matched | 0 | Jun 12, 2026 |
| B | F1500 LLC NYC DOB building permits | 9 | Support of Excavation · FILE SOE IN CONJUNCTION WITH JOB#Q01339923 No product keyword matched | 0 | Jun 12, 2026 |
| B | LIK TIN CENTURY INC NYC DOB building permits | 9 | General Construction · RENOVATION OF MIX-USE BUILDING WITH, REPAIR/REPLACE PARTITION, FLOOR, CEILING, DOOR, PAINTING, STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 12, 2026 |
| B | THE ALLEN-STEVENSON SCHOOL NYC DOB building permits | 9 | Sprinklers · RELOCATION OF 03 SPRINKLER HEADS AND INSTALLATION OF ASSOCIATED PIPING FOR THE RENOVATION OF MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR. No product keyword matched | 0 | Jun 12, 2026 |
| B | EO Staten Island Property Owner LLC NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - EMPIRE BEER GARDEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 12, 2026 |
| B | DOUGLAS SIMMONS NYC DOB building permits | 9 | Boiler Equipment · ACTIVATE GAS PORTION OF EXISTING GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. CHANGE GRADE OF FUEL FROM #4 TO #2 OIL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 12, 2026 |
| B | Christ the King School NYC DOB building permits | 9 | Plumbing · INSTALL REPLACEMENT HOT WATER HEATER AND ASSOCIATED GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Jun 12, 2026 |
| B | TRIBECA DENTAL CARE NYC DOB building permits | 9 | Mechanical Systems · Subsequent application to NB 420653135 No product keyword matched | 0 | Jun 12, 2026 |
| B | SOUTHDALE REALTY LLC NYC DOB building permits | 9 | Boiler Equipment · REPLACE BOILER AND OIL BURNER AS PER PLANS. INSTALL NEW OIL-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 12, 2026 |
| B | FRANKLIN AVE PROPERTY OWNER LLC NYC DOB building permits | 9 | Construction Fence · Installation of temporary construction fence as per plans filed herewith. No product keyword matched | 0 | Jun 12, 2026 |
| B | 402 BROADWAY CORP NYC DOB building permits | 9 | Mechanical Systems · Subsequent application to NB application BIS 420653144 No product keyword matched | 0 | Jun 12, 2026 |
| B | COLLEGE REALTY CORP. NYC DOB building permits | 9 | Curb Cut · INSTALLATION OF (1)NEW 10 FEET CURB CUT. No product keyword matched | 0 | Jun 12, 2026 |
| B | RAD & D'APRILE INC NYC DOB building permits | 9 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 12, 2026 |
| B | JOHN SALLUSTIO PLUMBING NYC DOB building permits | 9 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER JOB #B01151426-I1. RENOVATION OF EXISTING KITCHEN AND BATHROOM, NEW POWDER ROOM. No product keyword matched | 0 | Jun 12, 2026 |
| B | NEW BRIDGE CONTRACTING IN NYC DOB building permits | 9 | General Construction · PROPOSED OF BRICKS REPLACEMENT, WINDOWS LINTELS AND CRACK STONES REPAIRS TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 12, 2026 |
| B | WEGMASN FOOD MARKETS NYC DOB building permits | 9 | Plumbing · UPDATE SCOPE OF WORK TO MINOR WORK INCLUDES CAPPING AND REMOVAL OF GAS PIPING CONNECTION. AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jun 12, 2026 |
| B | ZARKAS CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · Renovation of Kitchen and bathroom in Apt. 5A on 5th floor, two new skylights. Partition work as per plan. No change in use, occupancy or exit. No product keyword matched | 0 | Jun 12, 2026 |
| B | PRESTIGE MECHANICAL & GEN NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION ONLY TO INCLUDE PARTITIONS, GENERAL CONSTRUCTION, PLUMBING FIXTURES, & KITCHEN NEW APPLIANCES. No product keyword matched | 0 | Jun 12, 2026 |
| B | METRO BAPTIST CHURCH NYC DOB building permits | 9 | Protection and Mechanical Methods · Install temporary protection safety net around monumental stained glass window on north facade. No change in occupancy, use or egress. No product keyword matched | 0 | Jun 12, 2026 |
| B | 1872 WASHINGTON LLC NYC DOB building permits | 9 | Structural · NEW BRICK VENEER TO REPLACE DETERIORATING STONE VENEER. No product keyword matched | 0 | Jun 12, 2026 |
| B | Built Right Design NYC DOB building permits | 9 | Plumbing · PLUMBING WORK AS PER PLAN, THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.CELLAR: REMOVE EX. BOILER & HWH, INSTALL (2) ELEC. HWH &REPLACE (3) PL FIXTURES; 001: REPLACE (1) GAS FIXTURE AND (4) PL FIXTURES; 001: REPLACE (1) GAS FIXTURE AND (4) PL FIXTURES. No product keyword matched | 0 | Jun 12, 2026 |
| B | AUSWIN REALTY NYC DOB building permits | 9 | General Construction · HEREWITH FILED ALT-1 TO FILE AND OBTAIN APPROVAL OF ARCHITECTURAL PLANS AND APPLICATIONS FOR EXISTING 1 STORY AND CELLAR COMMERCIAL BUILDING AND OBTAIN NEW C.O. FOR SAME No product keyword matched | 0 | Jun 12, 2026 |
| B | W & M ELECTRIC CORP NYC DOB electrical permits | 9 | New building wiring / Fire Alarm installation No product keyword matched | 0 | Jun 12, 2026 |
| B | MAS ELECTRIC & TECH LLC NYC DOB electrical permits | 9 | Run dedicated ckt for kitchen equipment (Oven, Giddles & exhaust fan)Replace receptacle in kitchen countertop. Add receptacles, switch and replace lights in basement. No product keyword matched | 0 | Jun 12, 2026 |
| B | MLA CONSTRUCTION INC NYC DOB building permits | 9 | Mechanical Systems · IT IS PROPOSED TO PROVIDE NEW SUPPLEMENTAL COOLING MECHANICAL SYSTEMS AS SHOWN ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 11, 2026 |
| B | GARDEN STATE OF NJ DATA* NYC DOB building permits | 9 | General Construction · ALTERATION TO EXISTING DWELLING UNIT APT 1WF AS PER ARCHITECTURAL PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 11, 2026 |
| B | PEBBLE CRAFT INC NYC DOB building permits | 9 | General Construction · Renovation of existing apartment 8I. Interior partition and finish work as per plan. No Change in use egress or occupancy. No product keyword matched | 0 | Jun 11, 2026 |
| B | CARDINAL BUILDERS, INC NYC DOB building permits | 9 | General Construction · Application being filed for minor renovation of Apt 10G on the 10th floor. Work includes replacing 2 existing windows and 1 terrace door with a new enlarged sliding door to the terrace. New mini split HVAC system. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 11, 2026 |
| B | HOLY CROSS HIGH SCHOOL NYC DOB building permits | 9 | Structural · Modification to Structural Systems - in conjunction w NB Application No product keyword matched | 0 | Jun 11, 2026 |
| B | NEGLIACCIO.IMPROVEMENTS NYC DOB building permits | 9 | Curb Cut · Application is being filed for existing 10 Linear feet of Curb Cut for Accessory off street parking spaces for Two (2) Motor Vehicles in conjunction with alteration Type 1 application #520003282 indicated on drawings filed herewith. No product keyword matched | 0 | Jun 11, 2026 |
| B | YOUN DESIGN CORP NYC DOB building permits | 9 | General Construction · INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 11, 2026 |
| B | SHEKO INC. NYC DOB building permits | 9 | Mechanical Systems · APPLICATION FILED FOR MECHANICAL SYSTEMS AS PER PLANS HERE WITHIN No product keyword matched | 0 | Jun 11, 2026 |
| B | Rocky Group LLC NYC DOB building permits | 9 | Sprinklers · Sprinkler work as shown on plans. No product keyword matched | 0 | Jun 11, 2026 |
| B | LOCKWOOD CABINET INC NYC DOB building permits | 9 | General Construction · Exterior work only for Apt. #15 on the 2nd floor. Work to include replacement of three (3) windows, as per plans. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Jun 11, 2026 |
| B | 123 HEATING & COOLING NYC DOB building permits | 9 | General Construction · ALTERATION TYPE 2 PLANS AND APPLICATIONS FILED FOR HOME OCCUPATION AT CELLAR LEVEL. No product keyword matched | 0 | Jun 11, 2026 |
| B | SKROM, LLC NYC DOB building permits | 9 | General Construction · Proposed interior renovation and new roof deck. Change in Use, Egress, & Occupancy No product keyword matched | 0 | Jun 11, 2026 |
| B | 79 BELMONT AVE LLC NYC DOB building permits | 9 | General Construction · FILING TO CONVERT 1ST FLOOR INTO ADULT DAYCARE CENTER. NO PROPOESED WORK ON ANY OTHER FLOORS. FRONT STAIRS TO BE FIRE PROTECTED. FILING TO ADDRESS 39073391R & 39073392Z No product keyword matched | 0 | Jun 11, 2026 |
| B | QUADRUM GLOBAL NYC DOB building permits | 9 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. No product keyword matched | 0 | Jun 11, 2026 |
| B | TRIVINO CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · APPLICATION FILED TO REMOVE EXISTING ILLEGAL ENLARGEMENT AND TO RESOLVE STOP WORK ORDER AND VIOLATIONS #073024C24-02114 AND 39143356M. No product keyword matched | 0 | Jun 11, 2026 |
| B | STW LAGUARDIA LLC NYC DOB building permits | 9 | General Construction · Interior renovation for existing hotel. No change in use, egress and occupancy. No product keyword matched | 0 | Jun 11, 2026 |
| B | Milbank, LLP NYC DOB building permits | 9 | Sprinklers · Modification to existing fixtures No product keyword matched | 0 | Jun 11, 2026 |